m |
m |
||
Line 2: | Line 2: | ||
Link to this [[Infiltration basin - system construction inspection checklist|table]]<br> | Link to this [[Infiltration basin - system construction inspection checklist|table]]<br> | ||
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]]. | To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]]. | ||
+ | |||
<table class="sortable"> | <table class="sortable"> | ||
<tr> | <tr> | ||
Line 49: | Line 50: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
<tr> | <tr> | ||
<td>Project benchmark established</td> | <td>Project benchmark established</td> | ||
Line 89: | Line 88: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | <td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td> | ||
Line 108: | Line 106: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<th colspan=3>4. Final Excavation</th> | <th colspan=3>4. Final Excavation</th> | ||
Line 160: | Line 157: | ||
<td> </td> | <td> </td> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td colspan=3>Comments: | <td colspan=3>Comments: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
</td> | </td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
<td colspan=3>Actions to be taken: | <td colspan=3>Actions to be taken: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
</table> | </table> | ||
− | < | + | <noinclude> |
− | + | [[category:Checklist]] | |
+ | </noinclude> |
Infiltration basin - system construction inspection checklist.
Link to this table
To access an Excel version of form (for field use), click here.
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Construction Sequence | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Pre-Construction | ||
Pre-construction meeting | ||
Runoff diverted | ||
Soil permeability verified | ||
Groundwater / bedrock verified | ||
Project benchmark established | ||
Facility location staked out | ||
Temporary erosion and sediment control establishedd | ||
2. Excavation | ||
Size and location per planse | ||
Side slopes stable | ||
Depth adjusted to soil layer with specified soil type and permeabilityn | ||
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence | ||
3. Embankment | ||
Anti-seep collar or filter diaphragm per plans | ||
Fill material per specifications | ||
4. Final Excavation | ||
Drainage area stabilizeds | ||
Sediment removed from facility | ||
Basin floor tilled | ||
Facility stabilized | ||
Removable cap / footplate per plans | ||
Initial depth = feet | ||
5. Final Inspection | ||
Pre-treatment facility operational | ||
Contributing watershed stabilized prior to flow diversion | ||
Inlet and outlet operationall | ||
Comments: | ||
Actions to be taken: |