Line 37: Line 37:
 
[[File:Dancing Waters sinkhole collapse 2.jpg|thumb|300px|alt=pond water disappears in karst setting|<p><font size=3>Woodbury sinkhole collapse looking toward the south.</font size>]]
 
[[File:Dancing Waters sinkhole collapse 2.jpg|thumb|300px|alt=pond water disappears in karst setting|<p><font size=3>Woodbury sinkhole collapse looking toward the south.</font size>]]
  
Infiltration BMPs in karst settings have the potential of creating  sinkholes as a result of the additional weight of water in a structural BMP (termed hydraulic head) and/or water infiltrated from the BMP that can dissolve the carbonate rock (e.g., limestone). These conditions can lead to the erosion of bedrock underneath or adjacent to a BMP. In addition, the pollutants being carried by the stormwater runoff can pass rapidly through the subsurface into the groundwater, creating a greater risk of groundwater contamination than is found in other soil types. Where karst conditions exist, there are no prescriptive rules or universally accepted management approaches because the subsurface conditions and subsurface drainage pattern variability intrinsic to karst geology.
+
Infiltration BMPs in karst settings have the potential of creating  sinkholes as a result of the additional weight of water in a structural BMP (termed hydraulic head) and/or water infiltrated from the BMP that can dissolve the carbonate rock (e.g., limestone). These conditions can lead to the erosion of bedrock underneath or adjacent to a BMP. In addition, the pollutants being carried by the stormwater runoff can pass rapidly through the subsurface into the groundwater, creating a greater risk of groundwater contamination than is found in other soil types.
  
In general when underlying karst is known or suspected to be present at the site, stormwater runoff should not be concentrated and discharged into or near known sinkholes. Instead, the following strategies should be employed.
+
Where karst conditions exist, there are no prescriptive rules or universally accepted management approaches. When underlying karst is known or suspected to be present at the site, stormwater runoff should not be concentrated and discharged into or near known sinkholes. Instead, the following strategies should be employed.
 
*Runoff should be dispersed.
 
*Runoff should be dispersed.
 
*Runoff should be pretreated and then infiltrated only if subsurface investigations and geotechnical analysis confirm that there are no unstable zones below the BMP.
 
*Runoff should be pretreated and then infiltrated only if subsurface investigations and geotechnical analysis confirm that there are no unstable zones below the BMP.

Revision as of 20:27, 28 September 2015

map of MN karst lands
Minnesota karst lands. Karst may also occur in sandstone formations in the eastern part of the state (e.g. Pine County). (Source: E. Calvin Alexander, University of Minnesota, with permission)
statewide map illustrating karst areas
Map illustrating sinkhole probability in Fillmore County, Southeast Minnesota. The highest sinkhole densities are on flat hilltops between or adjacent to river valleys in the western half of the county (shown in red and orange). In these locations, limestone and dolomite is the first bedrock encountered and is typically within 50 feet of the land surface. Source: Minnesota Department of Natural Resources, October 2005.

Karst geology makes up approximately 20 percent of the land surface in the United States. It is also found in other parts of the world such as China, Europe, the Caribbean, Australia, and Madagascar (USGS). Karst regions in Minnesota are predominantly found in the southeastern portion of the state. Use of infiltration BMPs in karst regions can be complicated and necessitates additional requirements for geotechnical testing, pre-treatment of stormwater runoff, and ponding of runoff. Caution must be used in interpreting the geographic depiction of karst lands as subsurface conditions can change rapidly over very short distances (Karst Working Group, 2009). In general, generalized maps of active karst will be less accurate than a county-scale map, as demonstrated by the two figures to the right. The following county-level maps have been developed.

In Minnesota there are three classifications of karst lands.

  • Active Karst. Active karst is defined as areas underlain by carbonate bedrock with less than 50 feet of sediment cover.
  • Transition Karst. Transition karst is defined as areas underlain by carbonate bedrock with 50 to 100 feet of sediment cover.
  • Covered Karst. Covered karst is defined as areas underlain by carbonate bedrock but with more than 100 feet of sediment cover.

A site with Active Karst has the greatest potential for development of a sinkhole below a BMP and the recommendations contained in this section should be considered for all proposed BMPs in areas with Active Karst. For Transitional Karst sites, it is HIGHLY RECOMMENDED that the nature of the overlaying soils be evaluated with respect to the potential for catastrophic failure given the increase in hydrostatic pressure created by a BMP.

What is karst?

illustration of karst features
The features of a karst system. Environmental Science Institute, The University of Texas at Austin. Caves as a Window into the Edwards Aquifer.

Karst is a landscape formed by the dissolution of a layer or layers of soluble bedrock. The bedrock is usually carbonate rock such as limestone or dolomite but the dissolution has also been documented in weathering resistant rock, such as quartz. The dissolution of the rocks occurs due to the reaction of the rock with acidic water. Rainfall is already slightly acidic due to the absorption of carbon dioxide (CO2), and becomes more so as it passes through the subsurface and picks up even more CO2. As the runoff passes through the subsurface and reacts with the rocks, cracks and fissures forms. These cracks and fissures grow, creating larger passages, caves, and may even form sinkholes as more and more acidic water infiltrates into the subsurface (American Rivers).

Subterranean drainage through karst geology limits the presence of surface water in places, explaining the absence of rivers and lakes. Many karst regions display distinctive surface features such as a sinkhole or natural pit (often termed cenotes or dolines), fissures, or caves (USGS, 2012). However, distinctive karst surface features may be completely absent where the soluble rock is below a deep layer of glacial debris (termed mantled), or is below one or more layers of non-soluble rock strata. Some karst regions include thousands of caves, although evidence of caves large enough for human exploration is not a required characteristic of karst.

Knowledge of the presence of sinkholes is an absolute indication of active karst. In these cases, an easement or reserve area should be identified on the development plans for the project so that all future landowners know of the presence of active karst on their property.

The following sources provide additional information on karst in Minnesota.

Why is karst geology a concern?

pond water disappears in karst setting
A collapsed karst feature where a stormwater pond previously existed. The site was in Woodbury, Minnesota.
pond water disappears in karst setting

Woodbury sinkhole collapse looking toward the south.

Infiltration BMPs in karst settings have the potential of creating sinkholes as a result of the additional weight of water in a structural BMP (termed hydraulic head) and/or water infiltrated from the BMP that can dissolve the carbonate rock (e.g., limestone). These conditions can lead to the erosion of bedrock underneath or adjacent to a BMP. In addition, the pollutants being carried by the stormwater runoff can pass rapidly through the subsurface into the groundwater, creating a greater risk of groundwater contamination than is found in other soil types.

Where karst conditions exist, there are no prescriptive rules or universally accepted management approaches. When underlying karst is known or suspected to be present at the site, stormwater runoff should not be concentrated and discharged into or near known sinkholes. Instead, the following strategies should be employed.

  • Runoff should be dispersed.
  • Runoff should be pretreated and then infiltrated only if subsurface investigations and geotechnical analysis confirm that there are no unstable zones below the BMP.
  • Additional borings and deeper borings may be warranted to target evaluation of transitional karst zone.
  • Once ponds are constructed, include contingency plans for cases where karst features open up and impact a pond, including conducting geotechnical borings to appropriate depths trying to identify unstable zones, then target those zones for grouting.
  • Convey runoff to a collection and transmission system away from the area via vegetated drainageways.

How to investigate for karst on a site

Developers, communities, public works agents, and other stormwater managers should conduct site investigations prior to designing and implementing stormwater BPMs in both Active and Transitional Karst areas. A site with Active Karst has the greatest potential for development of a sinkhole below a BMP and the recommendations contained in this section should be considered for all proposed BMPs. For Transitional Karst sites, it is HIGHLY RECOMMENDED that the nature of the overlaying soils be evaluated with respect to the potential for catastrophic failure given the increase in hydrostatic pressure created by a BMP. The level of investigation required will depend on the likelihood of karst being present and the regulatory requirements in the area.

The purpose of the investigation is to identify subsurface voids, cavities, fractures, or other discontinuities which could pose an environmental concern or a construction hazard to an existing or proposed stormwater management facility. Of special concern are the construction hazards posed by karst geology, the formation of sinkholes, and the possibility of a preferential pathway that would provide a direct route for polluted runoff to enter the regional groundwater system. Because of the complexity inherent to active and transitional karst areas, there is no single set of investigatory guidelines that works for every location. Typically, however, the first step is a preliminary investigation that involves analyzing geological and topographic county maps, and aerial photography to determine if active karst is known to be present. Included in the preliminary investigation should be a site visit to perform a visual observation for karst features such as sinkholes. Results of the investigation should be reported to the appropriate agency, including the Department of Natural Resources (DNR), Minnesota Geological Survey (MGS), and local agencies (such as the city, township or county). These known and discovered karst features should be surveyed for specific location and permanently recorded on the property deed.

If it is determined that active karst is present, a detailed site investigation, including a subsurface materials investigation should be conducted. The design of any geotechnical investigation should reflect the size and complexity of the proposed project, as well as the local knowledge of the threat posed by the karstic geology. The geotechnical investigation should first assess the subsurface heterogeneity (variability). With this information in-hand, borings or observation wells can then be accurately installed to obtain vertical data surrounding or within karst features or within areas of instability that have the potential for development of karst. The vertical data should be used to determine the nature and thickness of the subsurface materials and needs to include information involving depth to the bedrock and depth to the groundwater table. The investigation will be an iterative process and should be expanded until the desired detailed knowledge of the site is obtained and fully understood (Karst Working Group, 2009). Guidelines for investigating all potential physical constraints to infiltration on a site are presented in a table at this link. These guidelines should not be interpreted as all-inclusive. The size and complexity of the project will drive the extent of any subsurface investigation.

Additional information regarding site investigations in karst areas can be found in Appendix B of the Tennessee Permanent Stormwater Management and Design Guidance Manual (Tennessee Department of Environment and Conservation, 2014). This manual provides a chart which will guide designers through the investigative process and will help designers determine if any special analysis is required.

Preliminary site investigation

The level of detail required will depend on the likelihood that karst is present and any local regulations. The preliminary site investigation should include, but not be limited to (Pennsylvania BMP, 2009):

  • A review of aerial photographs, geological literature, sinkhole maps, previous soil borings, existing well data, and municipal wellhead or aquifer protection plans.
  • A site reconnaissance, including a thorough field examination for features such as limestone pinnacles, sinkholes, closed depressions, fracture traces, faults, springs, and seeps.
  • The site should be observed under varying weather conditions, especially during heavy rains and in different seasons to identify and map any natural drainageways.

Subsurface material investigation

The investigation should determine the nature and thickness of subsurface materials, including depth to bedrock and the water table. Subsurface data may be acquired by backhoe excavation and/or soil boring. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of karst formations under the surface. This is an iterative process that might need to be repeated until the desired detailed knowledge of the site is obtained and fully understood. The data listed below should be acquired under the direct supervision of a qualified and experienced karst scientist. Pertinent site information to collect includes the following:

  • Bedrock characteristics (ex. type, geologic contacts, faults, geologic structure, rock surface configuration)
  • Depth to the water table and depth to bedrock
  • Type and percent of coarse fragements
  • Soil characteristics (ex. color, type, thickness, mapped unit, geologic source/history)
  • Photo-geologic fracture trace map
  • Bedrock outcrop areas
  • Sinkholes and/or other closed depressions
  • Perennial and/or intermittent streams, and their flow behavior (ex. a stream in a karst area that loses volume could be a good indication of sinkhole infiltration)

In conducting subsurface investigations, all applicable State regulations must be met. For more information, see Minnesota Department of Health's Wells and Borings website.

Warning: In conducting subsurface investigations, all applicable State regulations must be met.

Location of soil borings

The local variability typical of karst areas could mean that a very different subsurface could exist close by, perhaps as little as 6 inches away. To accommodate this variability, the number and type of borings must be carefully assessed. If the goal is to locate a boring down the center of a sinkhole, the previous geophysical tests or excavation results can show the likely single location to achieve that goal. If the goal is to “characterize” the entire site, then an evaluation needs to occur to determine the number and depth needed to adequately represent the site. Again, the analyst must acknowledge the extreme variability and recognize that details can easily be missed. Some general guidance for locating borings include:

  • Getting at least 1 boring in each distinct major soil type present, as mapped by the MGS and USGS and local county records.
  • Placing an adequate number as determined by a site investigation near on-site geologic or geomorphic indications of the presence of sinkholes or related karst features.
  • Locating along photo-geologic fracture traces.
  • Locating adjacent to bedrock outcrop areas.
  • Locating a sufficient number to adequately represent the area under any proposed stormwater facility.
  • Documenting any areas identified as anomalies from any existing geophysical or other subsurface studies.

Exploratory borings must comply with Minnesota statutes, 4727.0100

Warning: Exploratory borings must comply with State regulations

Number of soil borings

The number and depth of borings will depend entirely upon the results of the subsurface evaluation obtained from the observational, geophysical, and excavation studies, as well as other borings. There are no prescriptive guidelines to determine the number and depth of borings. These will have to be determined by the qualified staff conducting the BMP management evaluation and will be based upon the data needs of the installation. The borings must extend well below the bottom elevation of the designed BMP, however, to make sure that there are no karst features that will be encountered or impacted as a result of the installation.

Information: Note that this manual contains information on recommended number of borings. The number of borings needed at sites that have or potentially have active karst is likely to be greater than the number indicated in the above referenced section of the manual.

Depth of soil borings

The number and depth of borings will depend entirely upon the results of the subsurface evaluation obtained from the observational, geophysical, and excavation studies, as well as other borings. There are no prescriptive guidelines to determine the number and depth of borings. These will have to be determined by the qualified staff conducting the BMP management evaluation and will be based upon the data needs of the installation. The borings must extend well below the bottom elevation of the designed BMP, however, to make sure that there are no karst features that will be encountered or impacted as a result of the installation. At least 1 subsurface cross section should be provided for the BMP installation, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed installation, using the actual geophysical and boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.

Abandoning soil borings

Warning: Under Minnesota law all soil borings must be sealed by a licensed well contractor or a licensed well sealing contractor.

Under Minnesota law all soil borings must be sealed by a licensed well contractor or a licensed well sealing contractor. A property owner may not seal any well or boring. See Minnesota Statutes, Chapter 103I For more information see these Minnesota Department of Health websites.

Identification of material

All material identified by the excavation and geophysical studies and penetrated by the boring should be identified, as follows:

  • Provide descriptions, logging, and sampling for the entire depth of the boring.
  • Note any stains, odors, or other indications of environmental degradation.
  • Perform laboratory analysis on a of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions.
  • Identify soil characteristics including, as a minimum: color; mineral composition; grain size, shape, sorting and degree of saturation.
  • Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed should be provided. Be aware that ground water levels in karst can change dramatically in short periods of time and will not necessarily leave mottled or gleyed evidence.
  • Record water levels in all borings over a time-period reflective of anticipated water level fluctuation. That is, water levels in karst geology can vary dramatically and rapidly. The boring should remain fully open to a total depth reflective of these variations and over a time that will accurately show the variation. Be advised that to get a complete picture, this could be a long-term period. Measurements could of course be collected during a period of operation of a BMP, which could be adjusted based on the findings of the data collection.
  • Report an estimation of soil engineering characteristics including “N” or estimated unconfined compressive strength, when conducting a SPT.

Evaluation of findings

At least 1 figure showing the subsurface soil profile cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.

Geophysical and dye techniques

Stormwater managers in need of subsurface geophysical surveys are encouraged to obtain the services of a qualified geophysicist experienced in karst geology. Some of the geophysical techniques available for use in karst terrain include: seismic refraction, ground-penetrating radar, and electric resistivity. The surest way to determine the flow path of water in karst geology is to inject dye into the karst feature (sinkhole or fracture) and watch to see where it emerges, usually from a spring. The emergence of a known dye from a spring grants certainty to a suspicion that ground water moves in a particular pattern. Dye tracing can vary substantially in cost depending upon the local karst complexity, but it can be a reasonably priced alternative, especially when the certainty is needed.

Caution: Dye tracing requires expertise and should only be done by experienced karst hydrogeologists. Contact the Minnesota Geological Survey for more information.

General stormwater management guidelines for karst areas

Warning: The Construction Stormwater Permit prohibits infiltration of stormwater runoff “within 1,000 feet up-gradient or 100 feet down-gradient of active karst features unless allowed by a local unit of government with a current MS4 permit”.

In karst settings there are special considerations and potentially additional constraints needed prior to implementing most structural BMPs. A growing emphasis is being placed on the implementation of strategies that preserve the pre-development hydrology and maintain critical vegetated areas. This is based on the idea that, in a pre-development setting, the runoff was spread across the landscape rather than directed to a certain area, which often results when there is a high concentration of pervious surfaces. When stormwater is concentrated in one area, it can lead to a more rapid dissolution of the underlying rock (American Rivers).

The uncertainty related to the actual presence of karst, the presence of unstable materials that have the potential for development of karst, and the water movement through karst terrain dictates the level of additional field information to be collected before proceeding with BMP design and construction in Active Karst and Transitional Karst classifications. The following guidelines are based on adaptations from a handful of communities (e.g., Carroll County, MD (2004a and b); St. Johns River Water Management District, FL (2010); Jefferson County, WV (Laughland 2003); Permanent Stormwater Management and Design Guidance Manual – Appendix B (2014); and other documents (Chesapeake Stormwater Network [Karst Working Group, 2009]; West Virginia Stormwater Management & Design Guidance Manual; Infiltration and Karst: Design Considerations for Success, Adams, M.).

The following guidelines do not contain substantial prescriptive information because of the variability inherent to karst geology in Minnesota.

  • Conduct a thorough geotechnical investigation in areas with suspected or documented active karst. Karst geology can change rapidly over very short distances so additional soil borings may be required in comparison to geotechnical investigations for shallow groundwater or bedrock.
  • Investigate non-infiltration BMPs on sites subject to the requirements of the CGP, where the infiltration BMP is “within 1,000 feet up-gradient or 100 feet down-gradient of active karst features unless allowed by a local unit of government with a current MS4 permit”. For purpose of these guidelines, active karst features are defined as identified karst or identified unstable subsurface materials that have the potential for development of karst.
  • Preserve the maximum length of natural swales as possible at the site to increase the infiltration and accommodate flows from extreme storms.
  • Minimize the area of impervious surfaces at the site. This will reduce the volume and velocity of the stormwater runoff. Consult with a geotechnical engineer prior to the design and construction of a BMP. The effect of stormwater BMPs in a karst area is complex and hard to predict. Consulting with a professional can reduce the risks of geological hazards and groundwater contamination.
  • Capture the runoff in a series of small runoff reduction practices where sheet flow is present. This technique will help keep the stormwater runoff from becoming channelized and will disperse the flow over a broad area. Practices such as swales, bioretention with underdrains, media filters, and vegetated filters should be considered first at a site. However, not all sites lend themselves to this type of management approach and could require use of the active karst region for proper management. Under these conditions, adequate precautions should be taken to assure that runoff water is adequately pretreated.
  • Design BMPs to be off-line such that volumes of runoff greater than the capacity of the BMP are bypassed around the BMP. This approach will limit the volume through the BMP to a quantity that is manageable in the karst.
  • Install multiple small BMPs instead of a centralized BMP. Centralized BMPs are defined as any practice that treats runoff from a contributing drainage area greater than 20,000 square feet, and/or has a surface ponding depth greater than 3 feet. Centralized practices have the greatest potential for karst- related failure, and will require costly geotechnical investigations and a more complex design.
  • Direct discharge from stormwater BMPs to surface waters and not to the nearest sinkhole. Because karst areas can be quite large in Minnesota, discharges should be routed to a baseflow stream via a pipe or lined ditch or channel to redirect the flow away from the karst, provided the stream does not disappear into a karst feature.
  • Incorporate additional precautions where infiltration practices are used. Impermeable liners and underdrains should be used in infiltration practices in active karst areas, effectively converting the infiltration BMP to a filtration BMP. These measures will be used to prevent the infiltrating water from discharging into the soils surrounding the karst feature. In addition, large scale practices (drainage area is greater than 20,000 square feet) are strongly discouraged.
  • Design ponds and wetlands with a properly engineered synthetic liner. It is HIGHLY RECOMMENDED that a professional geotechnical engineer investigate and recommend the depth of unconsolidated material between the bottom of the pond and the surface of the bedrock. A minimum of 3 feet of unconsolidated soil material is the minimum separation , however an expert may recommend 10 feet or greater. Pond and wetland depths should be fairly uniform and limited to no more than 10 feet in depth.
  • Minimize site disturbance during BMP construction. Seek the recommendations of a geotechnical engineer for management of heavy equipment, temporary storage of materials, changes to the soil profile - including cuts, fills, excavation and drainage alteration - on sites that have been found to contain a karst feature.
  • Report sinkholes as soon as possible after the first observation of sinkhole development. The sinkhole(s) should then be repaired or the stormwater management facility abandoned, adapted, managed and/or observed for future changes, whichever of these is most appropriate.
  • Develop a contingency plan for how to manage the stormwater should a BMP fail as a result of the development of a karst feature.
  • If a karst feature is encountered report to the appropriate state agency, such as the Department of Natural Resources (DNR), Minnesota Geological Survey (MGS), and local agencies (such as the city, township or county). These known occurrences should be surveyed for specific location and permanently recorded on the property deed. For transition karst areas, local discretion and the likelihood of karstic features should be used to determine the amount of geotechnical investigation. An easement or reserve area should be identified on the development plats for the project so that all future landowners know of the presence of active karst on their property.

Stormwater BMP selection in karst settings. Sources Karst Working Group, 2009; Minnesota Stormwater Wiki; Tennessee Permanent Stormwater Management and Design Guidance.
Link to this table

BMP Suitability in karst regions Karst considerations Construction stormwater permit restriction1
Impervious area disconnect Preferred
  • Strongly recommended for most residential lots less than 6,000 square feet.
  • Discharge point from the disconnect should extend at least 15 feet from any building foundation.
No
Bioretention with underdrain (biofiltration) Preferred
  • Requires 3 foot minimum separation distance between practice bottom and bedrock. If this is not possible, an underdrain should be used to convey the water away.
  • It’s recommended that the drainage area to an individual bioretention BMP be kept less than 20,000 square feet.
  • Larger designs that rely on exfiltration of treated runoff into the soils below are not recommended.
No
Rain tank/cistern Preferred
  • Above ground tanks are preferred to below ground.
  • Overflow of tank should extend at least 15 feet from building foundation.
No
Rooftop disconnect Preferred
  • 15 feet foundation set back.
  • Runoff should be spread diffusely across landscape.
No
Green roofs Preferred
  • Runoff should be spread diffusely across landscape.
No
Dry swale or grassed channel Preferred
  • Line with underdrains.
  • Incorporate compost amendments into the bottom of the channel to improve runoff reduction for vegetative uptake, and transpiration.
  • Do not incorporate check dams unless the swale or channel incorporates an underdrain. Otherwise small areas of infiltration would develop in the zones upgradient of the check dam where the water is captured without adequate outlet.
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
Yes if designed for infiltration
Media filter Preferred
  • Recommended practice in areas of shallow bedrock and soil.
No
Vegetative filter Preferred
  • Recommended practice in areas of shallow bedrock and soil.
No
Soil compost amendment Adequate No
Small scale infiltration/micro-bioinfiltration Adequate
  • Create multiple small sized infiltration BMPs to infiltrate impervious areas of 250 to 2,500 square feet.
  • Not recommended for sites identified as a stormwater hotspot.
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
Yes
Permeable pavement Adequate
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
Yes if designed for infiltration (no underdrain)
Infiltration trench or basin Adequate
  • Surface area to depth ratios of practices may need to be larger than typical basin designs to minimize depth of the BMP.
  • Confirm suitability with supporting geotechnical investigations and calculations.
  • Not recommended for sites identified as a stormwater hotspot.
  • Incorporate pre-treatment to limit risk of groundwater contamination in the event of future failure of the BMP associated with development of a karst feature. Local review authority should be consulted for approval.
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
Yes
Constructed wetlands Adequate
  • Requires larger surface area to drainage area ratios to limit the depth of the wetland.
  • Bedrock should act like a liner and help to maintain a permanent pool, unless fracture zone is present.
  • Consider using liner and liner cells.
Warning: If the CSW permit applies, liners are required in areas of active karst
No
Dry extended detention (ED) ponds and wet ponds Adequate
  • Requires larger surface area to drainage area ratios to limit the depth of the basin or pond. If analysis shows that the soils can support the weight of a pond then a liner should be used to prevent infiltration
Warning: If the CSW permit applies, liners are required in areas of active karst
No
Wet swale Discouraged Not feasible No
Large scale infiltration Discouraged
  • Use small scale infiltration practices instead.
Warning: If the CSW permit applies, Section 16.20 prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst
Yes

1Section 16.20 of the CSW Permit prohibits prohibits permittees from constructing infiltration systems in areas within 1,000 feet upgradient or 100 feet downgradient of active karst features.


How to remediate after a sinkhole appears

There are several approaches to sinkhole remediation if such an approach is desirable. Sinkhole sealing involves investigation, stabilization, filling, and final grading. In the investigation phase, the areal extent and depth of the sinkhole(s) should be determined. The investigation may consist of excavation to bedrock, soil borings, and/or geophysical studies. Sealing small-sized sinkholes is normally achieved by digging out the sinkhole to bedrock, plugging the hole with concrete, installing several impermeable soil layers interspersed with plastic or geotextile, and crowning with an impermeable layer and topsoil. For moderate sinkholes, an engineered subsurface structure is usually required.

It is often not feasible to seal large sinkholes so other remediation options must be pursued. These could include construction of a low-head berm around the sinkhole, clean-out of the sinkhole to make sure all potentially contaminating materials are removed, landscaping and conversion of land use in the sinkhole to open space or recreation, provided it can be done in a manner that provides adequate safety. In any of these cases, pre-treatment of any stormwater entering the sinkhole is imperative. Final grading of sinkholes in open space settings should include the placement of low permeability topsoil or clay and a vegetative cover, with a positive grade maintained away from the sinkhole location to avoid ponding or infiltration, if feasible.

Additional information on sinkhole remediation can be found at:

Monitoring of BMPs in karst regions

A water quality monitoring system installed, operated, and maintained by the owner/operator is RECOMMENDED, particularly where drinking water supplies are derived from ground water or associated with known sources of contamination. The location of monitoring wells or BMP performance monitoring will depend upon the nature of the BMP and surrounding karst characteristics. This could mean the installation of a monitoring system designed to reflect variable water behavior typical of karst water flow in addition to the monitoring of the performance of the BMP. Monitoring of groundwater and stormwater runoff behavior requires a thorough understanding of the local geology as the hydrology of karst terrains is vastly different from that of non-karst terrains (EPA, 1989).

Below is a list of resources that provide additional information on runoff and/or groundwater monitoring in karst areas.

BMP failure

In case of BMP failure in karst areas, contact the Minnesota Pollution Control Agency, Stormwater Section.

Summary of procedures for investigating sites with potential constraints on stormwater infiltration

Procedures for investigating sites with potential constraints on stormwater infiltration.
Link to this table

Investigation Shallow groundwater Shallow bedrock Soils with low infiltration capacity Karst
Preliminary site investigation NA NA NA The level of detail required will depend on the likelihood that karst is present and any local regulations. The preliminary site investigation should include, but not be limited to (Pennsylvania BMP, 2009):
  • A review of aerial photographs, geological literature, sinkhole maps, previous soil borings, existing well data, and municipal wellhead or aquifer protection plans.
  • A site reconnaissance, including a thorough field examination for features such as limestone pinnacles, sinkholes, closed depressions, fracture traces, faults, springs, and seeps.
  • The site should be observed under varying weather conditions, especially during heavy rains and in different seasons to identify and map any natural drainageways.
Subsurface material investigation The investigation is designed to determine the depth to seasonally saturated soils. Subsurface data for depth to seasonally saturated soil may be acquired by soil boring or studying existing wells on the site, if present. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of the saturated soil formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information should include the following:
  • Known groundwater (water depth) depth
  • Soil characteristics (type, thickness, mapped unit)
  • Bedrock outcrop areas
The investigation is designed to determine the nature and thickness of subsurface materials, including depth to bedrock. Subsurface data for depth to bedrock may be acquired by soil boring or backhoe investigation. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of the bedrock formations under the surface. The data listed below should be acquired under the direct supervision of a qualified geologist, geotechnical engineer, or soil scientist who is experienced in conducting such studies. Pertinent site information should include the following:
  • Known bedrock characteristics (type, geologic contacts, faults, geologic structure, rock surface configuration)
  • Soil characteristics (type, thickness, mapped unit)
  • Bedrock outcrop areas
Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and groundwater. The investigation is designed to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The investigation should determine the nature and thickness of subsurface materials, including depth to bedrock and the water table. Subsurface data may be acquired by backhoe excavation and/or soil boring. These field data should be supplemented by geophysical investigation techniques deemed appropriate by a qualified professional, which will show the location of karst formations under the surface. This is an iterative process that might need to be repeated until the desired detailed knowledge of the site is obtained and fully understood. The data listed below should be acquired under the direct supervision of a qualified and experienced karst scientist. Pertinent site information to collect includes the following:
  • Bedrock characteristics (ex. type, geologic contacts, faults, geologic structure, rock surface configuration)
  • Depth to the water table and depth to bedrock
  • Type and percent of coarse fragements
  • Soil characteristics (ex. color, type, thickness, mapped unit, geologic source/history)
  • Photo-geologic fracture trace map
  • Bedrock outcrop areas
  • Sinkholes and/or other closed depressions
  • Perennial and/or intermittent streams, and their flow behavior (ex. a stream in a karst area that loses volume could be a good indication of sinkhole infiltration)
Location of soil borings Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be:
  • Within each distinct major soil type present, as mapped by the Minnesota (MGS) and U.S. Geological Surveys (USGS) and local county records.
  • Next to bedrock outcrop areas and/or in areas with known shallow groundwater if present.
  • Near the edges and center of the proposed practice and spaced at equal distances from one another.
  • Near any areas identified as anomalies from any existing geophysical studies.
Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be:
  • Within each distinct major soil type present, as mapped by the Minnesota (MGS) and U.S. Geological Surveys (USGS) and local county records.
  • Next to bedrock outcrop areas and/or in areas with known shallow groundwater if present.
  • Near the edges and center of the proposed practice and spaced at equal distances from one another.
  • Near any areas identified as anomalies from any existing geophysical studies.
Borings should be located in order to provide representative area coverage of the proposed BMP facilities. The location of borings should be:
  • Within each distinct major soil type present, as mapped by the Minnesota (MGS) and U.S. Geological Surveys (USGS) and local county records.
  • Near the edges and center of the proposed practice and spaced at equal distances from one another.
  • Near any areas identified as anomalies from any existing geophysical studies.
The local variability typical of karst areas could mean that a very different subsurface could exist close by, perhaps as little as 6 inches away. To accommodate this variability, the number and type of borings must be carefully assessed. If the goal is to locate a boring down the center of a sinkhole, the previous geophysical tests or excavation results can show the likely single location to achieve that goal. If the goal is to “characterize” the entire site, then an evaluation needs to occur to determine the number and depth needed to adequately represent the site. Again, the analyst must acknowledge the extreme variability and recognize that details can easily be missed. Some general guidance for locating borings include:
  • Getting at least 1 boring in each distinct major soil type present, as mapped by the MGS and USGS and local county records.
  • Placing an adequate number as determined by a site investigation near on-site geologic or geomorphic indications of the presence of sinkholes or related karst features.
  • Locating along photo-geologic fracture traces.
  • Locating adjacent to bedrock outcrop areas.
  • Locating a sufficient number to adequately represent the area under any proposed stormwater facility.
  • Documenting any areas identified as anomalies from any existing geophysical or other subsurface studies.
Number of soil borings The number of recommended borings is described below.
  • Infiltration trenches, bioretention, and filters - a minimum of 2 per practice.
  • Ponds/wetlands - a minimum of 3 per practice, or 3 per acre, whichever is greater.
  • Additional borings – as needed to define lateral extent of limiting horizons, or site specific conditions, where applicable.
The number of recommended borings is described below.
  • Infiltration trenches, bioretention, and filters - a minimum of 2 per practice.
  • Ponds/wetlands - a minimum of 3 per practice, or 3 per acre, whichever is greater.
  • Additional borings – as needed to define lateral extent of limiting horizons, or site specific conditions, where applicable.
The number of recommended borings is described below.
  • Infiltration trenches, bioretention, and filters - a minimum of 2 per practice.
  • Ponds/wetlands - a minimum of 3 per practice, or 3 per acre, whichever is greater.
  • Additional borings – as needed to define lateral extent of limiting horizons, or site specific conditions, where applicable.
The number and depth of borings will depend entirely upon the results of the subsurface evaluation obtained from the observational, geophysical, and excavation studies, as well as other borings. There are no prescriptive guidelines to determine the number and depth of borings. These will have to be determined by the qualified staff conducting the BMP management evaluation and will be based upon the data needs of the installation. The borings must extend well below the bottom elevation of the designed BMP, however, to make sure that there are no karst features that will be encountered or impacted as a result of the installation.
Depth of soil borings Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered. The number and depth of borings will depend entirely upon the results of the subsurface evaluation obtained from the observational, geophysical, and excavation studies, as well as other borings. There are no prescriptive guidelines to determine the number and depth of borings. These will have to be determined by the qualified staff conducting the BMP management evaluation and will be based upon the data needs of the installation. The borings must extend well below the bottom elevation of the designed BMP, however, to make sure that there are no karst features that will be encountered or impacted as a result of the installation. At least 1 subsurface cross section should be provided for the BMP installation, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed installation, using the actual geophysical and boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.
Identification of material All material penetrated by the boring should be identified, as follows:
  • Provide descriptions, logging, and sampling for the entire depth of the boring.
  • Note any stains, odors, or other indications of environmental degradation.
  • Perform a laboratory analysis of a minimum of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions.
  • Identify soil characteristic including, at a minimum: color; mineral composition; grain size, shape, and sorting; and saturation.
  • Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed (sticky clay soils typically found in waterlogged soils).
  • Measure water levels in all borings at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements.
  • Estimate soil engineering characteristics, including “N” or estimated unconfined compressive strength, when conducting a standard penetration test (SPT).
All material penetrated by the boring should be identified, as follows:
  • Provide descriptions, logging, and sampling for the entire depth of the boring.
  • Note any stains, odors, or other indications of environmental degradation.
  • Perform a laboratory analysis of a minimum of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions.
  • Identify soil characteristic including, at a minimum: color; mineral composition; grain size, shape, and sorting; and saturation.
  • Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed (sticky clay soils typically found in waterlogged soils).
  • Measure water levels in all borings at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements.
  • Estimate soil engineering characteristics, including “N” or estimated unconfined compressive strength, when conducting a standard penetration test (SPT).
All material penetrated by the boring should be identified, as follows:
  • Provide descriptions, logging, and sampling for the entire depth of the boring.
  • Note any stains, odors, or other indications of environmental degradation.
  • Perform a laboratory analysis of a minimum of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions.
  • Identify soil characteristic including, at a minimum: color; mineral composition; grain size, shape, and sorting; and saturation.
  • Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed (sticky clay soils typically found in waterlogged soils).
  • Measure water levels in all borings at the time of completion and again 24 hours after completion. The boring should remain fully open to total depth of these measurements.
All material identified by the excavation and geophysical studies and penetrated by the boring should be identified, as follows:
  • Provide descriptions, logging, and sampling for the entire depth of the boring.
  • Note any stains, odors, or other indications of environmental degradation.
  • Perform laboratory analysis on a of 2 soil samples, representative of the material penetrated including potential limiting horizons, with the results compared to the field descriptions.
  • Identify soil characteristics including, as a minimum: color; mineral composition; grain size, shape, sorting and degree of saturation.
  • Log any indications of water saturation to include both perched and ground water table levels, and descriptions of soils that are mottled or gleyed should be provided. Be aware that ground water levels in karst can change dramatically in short periods of time and will not necessarily leave mottled or gleyed evidence.
  • Record water levels in all borings over a time-period reflective of anticipated water level fluctuation. That is, water levels in karst geology can vary dramatically and rapidly. The boring should remain fully open to a total depth reflective of these variations and over a time that will accurately show the variation. Be advised that to get a complete picture, this could be a long-term period. Measurements could of course be collected during a period of operation of a BMP, which could be adjusted based on the findings of the data collection.
  • Report an estimation of soil engineering characteristics including “N” or estimated unconfined compressive strength, when conducting a SPT
Evaluation of findings At least 1 figure showing the subsurface soil profile cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data. At least 1 figure showing the subsurface soil profile cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data. NA At least 1 figure showing the subsurface soil profile cross section through the proposed practice should be provided, showing confining layers, depth to bedrock, and water table (if encountered). It should extend through a central portion of the proposed practice, using the actual or projected boring data. A sketch map or formal construction plan indicating the location and dimension of the proposed practice and line of cross section should be included for reference, or as a base map for presentation of subsurface data.
Infiltration rate testing NA NA Soil permeability should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method.
  • Install casing (solid 6-inch diameter) to 36 inches below proposed BMP bottom.
  • Remove any smeared soiled surfaces and provide a natural soil interface into which water may percolate. Remove all loose material from the casing. Upon the tester’s discretion, a 2 inch layer of coarse sand or fine gravel may be placed to protect the bottom from scouring. Fill casing with clean water to a depth of 36 inches and allow to pre-soak for up to 24 hours.
  • Refill casing with another 36 inches of clean water and monitor water level (measured drop from the top of the casing) for 1 hour. Repeat this procedure (filling the casing each time) 3 additional times, for a total of 4 observations. Upon the tester’s discretion, the final field rate may either be the average of the 4 observations, or the value of the last observation. The final rate should be reported in inches per hour.
  • May be done through a boring or open excavation that is protected from access by the public.
  • The location of the test should correspond to the BMP location.
Upon completion of the testing, the casings should be immediately pulled, and the test pit should be back-filled.
NA
Geophysical and dye techniques NA NA NA Stormwater managers in need of subsurface geophysical surveys are encouraged to obtain the services of a qualified geophysicist experienced in karst geology. Some of the geophysical techniques available for use in karst terrain include: seismic refraction, ground-penetrating radar, and electric resistivity. The surest way to determine the flow path of water in karst geology is to inject dye into the karst feature (sinkhole or fracture) and watch to see where it emerges, usually from a spring. The emergence of a known dye from a spring grants certainty to a suspicion that ground water moves in a particular pattern. Dye tracing can vary substantially in cost depending upon the local karst complexity, but it can be a reasonably priced alternative, especially when the certainty is needed.