(Created page with "<center><font size=3>'''Excerpt from Table 2575-4, Required Corrective Action'''</font size><br> Link to this table<...") |
m |
||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Excerpt from Table 2575-4, Required Corrective Action'''</font size><br> | |
− | + | Link to this [[Excerpt from Table 2575-4, Required Corrective Action|table]] | |
− | Link to this [[Excerpt from Table 2575-4, Required Corrective Action|table]] | ||
<table class="sortable"> | <table class="sortable"> | ||
Line 9: | Line 8: | ||
<th>Corrective Action</th> | <th>Corrective Action</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>Turf Reinforcement Mat</td> | <td>Turf Reinforcement Mat</td> | ||
− | <td>Wrong TRM installed | + | <td> |
− | Missing certificate of compliance | + | *Wrong TRM installed |
− | + | *Missing certificate of compliance | |
− | Missing anchoring devices | + | *Missing anchoring devices |
− | Insufficient anchoring devices | + | *Insufficient anchoring devices |
− | Missing head anchor embedment | + | *Missing head anchor embedment |
− | Missing edge anchor embedment | + | *Missing edge anchor embedment |
− | Improper or insufficient overlap of adjoining mat units | + | *Improper or insufficient overlap of adjoining mat units |
− | Improper soil infill depth (about 1 inch) | + | *Improper soil infill depth (about 1 inch) |
− | Improper soil type | + | *Improper soil type |
− | Improper hydraulic mulch RFM infill | + | *Improper hydraulic mulch RFM infill |
− | + | *Wrong rolled erosion control cover | |
− | Wrong rolled erosion control cover | ||
</td> | </td> | ||
− | <td>Remove incorrect and replace with proper TRM | + | <td> |
− | Cease operations and secure certificate. Else remove and replace | + | *Remove incorrect and replace with proper TRM |
− | Install additional anchoring devices as per plan or Manufacturer | + | *Cease operations and secure certificate. Else remove and replace |
− | Install additional anchoring devices as per plan or Manufacturer | + | *Install additional anchoring devices as per plan or Manufacturer |
− | Entrench leading edge and anchor correctly | + | *Install additional anchoring devices as per plan or Manufacturer |
− | Entrench side edge and anchor correctly | + | *Entrench leading edge and anchor correctly |
− | Provide proper joints and overlaps | + | *Entrench side edge and anchor correctly |
− | + | *Provide proper joints and overlaps | |
− | Apply additional screen topsoil or screed excess | + | *Apply additional screen topsoil or screed excess |
− | Cease operations and contact OES | + | *Cease operations and contact OES |
− | Apply additional hydraulic mulch Type RFM to manufacturer specification | + | *Apply additional hydraulic mulch Type RFM to manufacturer specification |
− | Remove improper RECP and apply correct product | + | *Remove improper RECP and apply correct product |
</td> | </td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
− | |||
− | |||
− | |||
− | |||
[[category:Table]] | [[category:Table]] |
Excerpt from Table 2575-4, Required Corrective Action
Link to this table
Item | Corrective Action Required if: | Corrective Action |
---|---|---|
Turf Reinforcement Mat |
|
|