m
Line 32: Line 32:
 
*[http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_program Main construction stormwater page]
 
*[http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_program Main construction stormwater page]
 
*[[General principles for erosion prevention and sediment control at construction sites in Minnesota]]
 
*[[General principles for erosion prevention and sediment control at construction sites in Minnesota]]
 +
*[[Construction stormwater best management practice – perimeter control fact sheet]]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-36.doc Construction Stormwater Inspection Checklist]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-68p.pdf Linear permanent stormwater management design flow chart]
 +
*[[Construction stormwater best management practice – Concrete, paint, stucco and other washout guidance]]
 +
*[https://www3.epa.gov/npdes/pubs/concretewashout.pdf EPA Concrete Washout Stormwater Best Management Practice]
 +
*[[Construction stormwater best management practice –  buffer zones]]
 +
*[[Construction stormwater best management practice – Site stabilization]]
 +
*[[Construction stormwater – Top 5 permit violations]]
  
 
==Permit applicability==
 
==Permit applicability==
 
{{alert|The Construction Stormwater General permit states "The Permittee(s) must stabilize all exposed soil areas (including stockpiles)." For more specific information, see [http://stormwater.pca.state.mn.us/index.php/IV._CONSTRUCTION_ACTIVITY_REQUIREMENTS#IV.B._EROSION_PREVENTION_PRACTICES Part IV.B.2] of the permit.|alert-danger}}
 
{{alert|The Construction Stormwater General permit states "The Permittee(s) must stabilize all exposed soil areas (including stockpiles)." For more specific information, see [http://stormwater.pca.state.mn.us/index.php/IV._CONSTRUCTION_ACTIVITY_REQUIREMENTS#IV.B._EROSION_PREVENTION_PRACTICES Part IV.B.2] of the permit.|alert-danger}}

Revision as of 20:55, 13 January 2017

This site is currently undergoing revision. For more information, open this link.
This page is under development. We anticipate populating it in autumn, 2016.
photo of energy dissipation BMP
Energy dissipation using rock riprap.
photo of vehicle tracking pad
Properly constructed BMP for vehicle tracking.
image of inlet protection
Example of proper inlet protection.

Erosion is the process by which soil, rock, or other material is moved from one location to another, typically through the action of water or wind. Sediment control practices are designed to prevent or minimize loss of eroded soil at a site. Typical sediment control practices focus on the following.

  • Physical filtration of sediment by trapping soil particles as water passes through a silt fence, drop inlet screen, fiber roll, etc.
  • Settling processes, that allow sediment to fall out of flows that are slowed and temporarily impounded in ponds, traps, or in small pools created by berms, silt fencing, inlet protection dikes, check dams, and so on


This page provides links to several pages in this manual that address sediment control at construction stormwater sites, as well as links to other pages and information related to erosion prevention practices.

Sediment control practices

Photo galleries

Links

Permit applicability

Warning: The Construction Stormwater General permit states "The Permittee(s) must stabilize all exposed soil areas (including stockpiles)." For more specific information, see Part IV.B.2 of the permit.