Some important post-construction considerations are provided below along with recommended maintenance standards. | Some important post-construction considerations are provided below along with recommended maintenance standards. | ||
− | *A site-specific O&M plan should be prepared by the designer prior to completing construction of the grass swale. This plan should provide any operating procedures related to the practices. The plan should also provide clear maintenance expectations, activities, and schedules, including minimum maintenance frequencies expected. Include photos if possible. Be clear about who is responsible for the maintenance and the type of expertise that will be needed for distinct O&M activities. The O&M plan should include an anticipated budget for O&M activities. The O&M plan should also include an example O&M inspection checklist and an example maintenance report. Example O&M plans and inspection checklists are provided further down below. | + | *A site-specific O&M plan should be prepared by the designer prior to completing construction of the grass swale. This plan should provide any operating procedures related to the practices. The plan should also provide clear maintenance expectations, activities, and schedules, including minimum maintenance frequencies expected. Include photos if possible. Be clear about who is responsible for the maintenance and the type of expertise that will be needed for distinct O&M activities. The O&M plan should include an anticipated budget for O&M activities. The O&M plan should also include an example O&M inspection checklist and an example maintenance report. Example O&M plans and inspection checklists [https://stormwater.pca.state.mn.us/index.php?title=Operation_and_maintenance_(O%26M)_of_swales#Useful_resources are provided further down below]. |
*A legally binding and enforceable maintenance agreement should be executed between the practice owner and the local review authority. | *A legally binding and enforceable maintenance agreement should be executed between the practice owner and the local review authority. | ||
*Inspection and maintenance activities are distinct and can be done as separate activities or together. Inspection will typically assess the practice for any O&M issues, whereas maintenance will address the O&M issues identified by the inspection. A dedicated inspection effort on a large number of BMPs can help prioritize maintenance activities. | *Inspection and maintenance activities are distinct and can be done as separate activities or together. Inspection will typically assess the practice for any O&M issues, whereas maintenance will address the O&M issues identified by the inspection. A dedicated inspection effort on a large number of BMPs can help prioritize maintenance activities. | ||
*Maintenance activities should be careful not to cause compaction. | *Maintenance activities should be careful not to cause compaction. | ||
− | * | + | *Ponded water that does not infiltrate within 48 hours of a storm is an indicator the swale is not functioning properly. If ponded water is observed outside of a routine O&M schedule it should be addressed immediately. |
− | *BMP areas generally should not be used as dedicated snow storage areas. Snow storage within swales should be avoided when possible, such as in parking lots. Snow storage can cause compaction and increase sedimentation within the swale over time, and so snow storage on swales designed for infiltration should be specifically avoided. | + | *<span title="One of many different structural or non–structural methods used to treat runoff"> '''Best management practice'''</span> (BMP) areas generally should not be used as dedicated snow storage areas. Snow storage within swales should be avoided when possible, such as in parking lots. Snow storage can cause compaction and increase sedimentation within the swale over time, and so snow storage on swales designed for infiltration should be specifically avoided. [https://stormwater.pca.state.mn.us/index.php?title=Operation_and_maintenance_of_swales_-_supplemental_information#Snow_and_salt_considerations Link here for more information]. |
{{:Overview and schedule of general maintenance activities for swales}} | {{:Overview and schedule of general maintenance activities for swales}} |
This page provides guidance for operation and maintenance (O&M) of swales. This includes dry swales, wet swales, bioswales, and high gradient step pools.
Supplemental information can be found on the page called Operation and maintenance of swales - supplemental information. Supplemental information includes the following.
A grass or dry swale is a general term for filtration or infiltration conveyance practice, but there are a wide variety of designs depending on the site requirements. The key functions of swales are to convey water with reduced peak velocities and to perform water quality treatment with filtration and infiltration. Swales have the benefit of providing ecological function in areas dominated by development and impervious surface. These practices are ideal for urban settings, which creates an opportunity for humans to impact their function through vandalism, littering, and vehicular traffic.
These practices, like other green stormwater infrastructure, require regular maintenance to ensure proper and long-lasting ecosystem and stormwater function. If properly maintained, swales can operate effectively for 20-50 years, depending on the design type. Vegetated dry swales may perform properly for up to 50 years (Malvern Borough, 2013). The most frequently cited O&M concerns for swales include the following.
The sections below describe best practices to prevent or minimize these common problems.
Swales, like other infiltration practices in urban areas, may be subject to higher public visibility, greater trash loads, pedestrian traffic, vandalism, and vehicular loads. Designers should design these practices in ways that prevent or minimize O&M issues. Examples include the following.
Designers should consult and include any local requirements regarding green infrastructure. O&M considerations often depend on whether the practice is located on public land, private land, or in the public right of way. For example, plantings in the public right of way that conflict with any traffic safety considerations could require increased O&M, such as pruning or complete removal. Swales are particularly subject to traffic considerations and regulations, given their frequent placement in public right-of-way.
The designer should also provide a site-specific O&M plan that includes the following.
For more information on design criteria for dry swale (grass swales).
Proper construction methods and sequencing play a significant role in reducing O&M problems. Some key items during the construction phase include the following.
Effective short and long-term performance of grass swales requires a dedicated and routine maintenance plan with clear guidelines, expectations, and schedules. Proper maintenance will not only increase the effectiveness of the swale at treating stormwater runoff, but will create a viable green space supporting ecological function. A maintenance plan clarifying maintenance responsibilities should be required for all practices.
Some important post-construction considerations are provided below along with recommended maintenance standards.
Overview and schedule of general maintenance activities for swales
Link to this table
Activity | Frequency | Time Period | Level of Effort | O&M Benefit1 |
---|---|---|---|---|
Check that there is no ponding | 48 hours after event | All year long | 1 hour | 1 |
Inspect entire BMP after rainfall | After any event greater than 0.5” | All year long (or during area’s rain season) | 2-4 hours | 1 |
Correct earthwork if inlet scouring or unwanted flow paths develop | As needed | All year long | >4 hours | 1 |
Spot reseed bare patches and eroding areas | As needed | First growing season | 2-4 hours | 3,4,5 |
Supplemental watering during drier periods, particularly if keeping stormwater offline until plant seedlings are established. | As needed | Dry periods | 1-2 hours | 3,4,5 |
Remove any stormwater diversion or barriers once seedlings are established. | Once | When plants are sufficiently established | 1-2 hours | 1,2,3,4,5 |
Inspect and remove invasive plants and weeds during plant community establishment | Monthly | First growing season | 1-2 hours | 5,6 |
Mowing (dry swales) side slopes and/or grass filter strip to maintain 4-12” of height | Seasonally | As needed (do not interrupt any vegetative establishment) | 2-4 hours | 1 |
Activity | Frequency | Time Period | Level of Effort | O&M Benefit1 |
Check that there is no ponding | 48 hours after event | All year long | 1 hour | 1 |
Inspect inlet/outlet structures for structural damage and clogging. | Annually | All year long | 1-2 hours | 1 |
Correct earthwork if inlet scouring or unwanted flow paths develop | As needed | All year long | >4 hours | 1 |
Mowing (dry swales) side slopes and/or grass filter to maintain 4-12” of height | Seasonally | All year long | 2-4 hours | 1 |
Inspect for trash and debris | Seasonally | All year long | 2-4 hours | 1,5 |
Check for evidence of clogging in the pre-treatment device and/or in the main treatment area. | Biannually | In spring and fall | 1-2 hours | 1 |
Inspect and remove excess sediment in the pre-treatment device and/or in the main treatment area. | Annually | In spring (post- snowmelt) and fall | 4 hours if removal is needed | 1 |
Inspect plant composition and health and replace as needed (maintain >95% vegetative cover) | Biannually | In fall or spring | 4 hours if plant replacement is needed | 4,5 |
Prune and weed to maintain appearance and proper vegetative cover | As needed | Growing season | 1-2 hours | 4,5,6, |
Activity | Frequency | Time Period | Level of Effort per Visit | O&M Benefit1 |
After long term operation of the practice, some occasional and infrequent maintenance activities might be required, such as bigger repairs, soil regeneration, or redesign of key elements of the practice. | As needed | As needed | Could be significant depending on the activity | 1,2,3,4,5,6 |
1Key to Maintenance Benefits:
|
Common problems and how to troubleshoot them for swales
Link to this table
Symptom | Possible Causes | Solution |
---|---|---|
Standing water within the swale for more than 48 hours | Soil media may be clogged with accumulated sediment or the outlet structures may be clogged with trash or de |
|
Vegetation is not able to establish | Plant selection is inappropriate for the site | Consult with a landscaper or horticulturist. Check that plants are suited to the local conditions. Make sure BMP is protected from snow storage or salt application. |
Maintenance costs will vary on a number of factors, including but not limited to:
Maintenance costs will vary depending on the size of the practice, its contributing drainage area, type of plantings, and whether it is part of a larger GI effort. Preventative maintenance is key to minimizing major costs associated with repairs. A general rule of thumb to estimate annual maintenance costs is 5%-7% of the installation costs for swales (CWP, 2017). In 2014 dollars, the annual cost of maintenance is approximately $0.06-$0.12 per square foot of practice, which adjusts to $0.07-$0.14 in 2021 dollars, as estimated in the National Stormwater Calculator (Clary, 2017). Maintenance may be higher the first few years, while plants are being established.
Maintenance costs should account for the number of hours of labor, the cost for different types of labor expertise required, and any equipment needed to successfully complete the maintenance activities.
Topics discussed include:
Example O&M plans, checklists, reports, and maintenance agreements for swales
Link to this table
Document | Link |
---|---|
Operation & Maintenance Plan | |
Construction phase inspection checklist |
|
O&M inspection checklist |
|
O&M example report | |
Maintenance Agreements |