Wet swale operation and maintenance checklist.
Link to this table
To access an Excel version of form (for field use), click here.
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Maintenance Item | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Debris Cleanout (Monthly) | ||
Project: | ||
Contributing areas clean of litter and vegetative debris | ||
Filtration or infiltration facility clean | ||
Inlets and outlets clear | ||
2. Vegetation (Monthly) | ||
Vegetation maintenance complies with O&M plan | ||
Vegetation meets performance standards (including control of specified invasive species) | ||
No evidence of erosion | ||
Maintenance of adequate water depths for desired wetland plant species | ||
Have sediment accumulations reduced wet swale volume significantly or are plants “choked” with sediment | ||
3. Inundated Portion of Swale (Monthly) | ||
Floating or floatable debris removal required | ||
Visible pollution | ||
Eutrophication level of the wet swale | ||
No evidence of erosion | ||
4. Sediment Deposition (Annual) | ||
Area clean of sediment | ||
Contributing drainage area stabilized and free of erosion | ||
Winter accumulation of sand removed each spring | ||
5. Outlet/Overflow Spillway (Annual, After Major Storms) | ||
Good condition, no need for repair | ||
No evidence of erosion | ||
No evidence of any blockages | ||
No evidence of structural deterioration | ||
6. Other (Monthly) | ||
Encroachment on easement area (if applicable) | ||
Complaints from residents (if applicable) | ||
Any public hazards (specify) | ||
Comments: | ||
Actions to be taken: |
This page was last edited on 4 August 2022, at 17:18.