Some important post-construction considerations are provided below along with recommended maintenance standards. | Some important post-construction considerations are provided below along with recommended maintenance standards. | ||
− | *A site-specific Operations and Maintenance Plan should be prepared by the designer prior to putting the permeable pavement practice into operation. This plan should provide any operating procedures related to the practices. The plan should also provide clear maintenance expectations, activities, and schedules. Include photos if possible. Be clear about who is responsible for the maintenance and the type of expertise that will be needed for distinct O&M activities. The O&M plan should include an anticipated budget for O&M activities. The O&M plan should also include an example O&M inspection checklist and an example maintenance report. Example O&M plans are provided in the | + | *A site-specific ''Operations and Maintenance Plan'' should be prepared by the designer prior to putting the permeable pavement practice into operation. This plan should provide any operating procedures related to the practices. The plan should also provide clear maintenance expectations, activities, and schedules. Include photos if possible. Be clear about who is responsible for the maintenance and the type of expertise that will be needed for distinct O&M activities. The O&M plan should include an anticipated budget for O&M activities. The O&M plan should also include an example O&M inspection checklist and an example maintenance report. Example O&M plans are provided in the [https://stormwater.pca.state.mn.us/index.php?title=Operation_and_maintenance_(O%26M)_of_permeable_pavement#Useful_Resources Useful Resources section, below]. |
− | *Where necessary, a legally binding and enforceable maintenance agreement should be executed between the practice owner and the local review authority. Example maintenance agreements are provided in the | + | *Where necessary, a legally binding and enforceable maintenance agreement should be executed between the practice owner and the local review authority. Example maintenance agreements are provided in the [https://stormwater.pca.state.mn.us/index.php?title=Operation_and_maintenance_(O%26M)_of_permeable_pavement#Useful_Resources Useful Resources section, below]. |
*Inspection and maintenance activities are distinct and can be done as separate activities or together. Inspection will typically assess the practice for any O&M issues, whereas maintenance will address the O&M issues identified by the inspection. A dedicated inspection effort on a large number of BMPs can help prioritize maintenance activities. | *Inspection and maintenance activities are distinct and can be done as separate activities or together. Inspection will typically assess the practice for any O&M issues, whereas maintenance will address the O&M issues identified by the inspection. A dedicated inspection effort on a large number of BMPs can help prioritize maintenance activities. | ||
*Maintain pervious parts of the practice drainage area to limit sediment runoff onto the practice. This could include ensuring adequate plantings for the entire pervious area or if this is not feasible, adding a line of vegetative stabilization adjacent to the practice. | *Maintain pervious parts of the practice drainage area to limit sediment runoff onto the practice. This could include ensuring adequate plantings for the entire pervious area or if this is not feasible, adding a line of vegetative stabilization adjacent to the practice. | ||
*Prevent construction traffic on permeable pavement to limit potential for tracking and spilling dirt onto the practice. | *Prevent construction traffic on permeable pavement to limit potential for tracking and spilling dirt onto the practice. | ||
*Provide routine cleaning (vacuuming) of the practice and impervious parts of the drainage area on a biannual basis or a shorter interval if necessary. | *Provide routine cleaning (vacuuming) of the practice and impervious parts of the drainage area on a biannual basis or a shorter interval if necessary. | ||
− | *For winter maintenance, avoid using sand or cinder on the practice or within its drainage area. Standard road salts or certain liquid deicers are acceptable, though ice will form less readily than on conventional pavements. Plow blade heights should be set slightly higher than normal (0. | + | *For winter maintenance, avoid using sand or cinder on the practice or within its drainage area. Standard road salts or certain liquid deicers are acceptable, though ice will form less readily than on conventional pavements. Plow blade heights should be set slightly higher than normal (0.5 inches) to avoid disturbance to the pavement. Rubber blade tips may also extend the life of the pavement. |
+ | *Snow storage on permeable pavement should be avoided, because it could lead to clogging due to sediment accumulation. | ||
*Do not allow storage of construction materials, landscaping materials, soil or mulch on any unprotected surfaces of or contributing drainage areas to the permeable pavement practice. | *Do not allow storage of construction materials, landscaping materials, soil or mulch on any unprotected surfaces of or contributing drainage areas to the permeable pavement practice. | ||
*Inlets draining to the practice storage layer should be cleaned twice per year. | *Inlets draining to the practice storage layer should be cleaned twice per year. | ||
*Do not seal-coat permeable pavement surfaces. | *Do not seal-coat permeable pavement surfaces. | ||
− | The | + | The tables below provide an overview and schedule of general maintenance activities and a list of common maintenance problems and how to troubleshoot them. |
{{:Overview and schedule of general maintenance activities for permeable pavement practices}} | {{:Overview and schedule of general maintenance activities for permeable pavement practices}} | ||
− | |||
{{:Common problems and how to troubleshoot them for permeable pavement practices}} | {{:Common problems and how to troubleshoot them for permeable pavement practices}} |
This page provides guidance for operation and maintenance (O&M) of permeable pavement.
Supplemental information can be found on the page called Operation and maintenance (O&M) of permeable pavement - supplemental information . Supplemental information includes the following.
Permeable pavement practices are designed to capture, filter and infiltrate stormwater runoff through the surface and into a storage layer. These practices have fewer “green” components than other green stormwater infrastructure, but they offer a stormwater benefit over what would otherwise be impervious area. Permeable pavements are most common in dense urban areas and experience heavy vehicular and pedestrian traffic. These practices require dedicated and regular maintenance to ensure proper and long-lasting operation, but they can operate effectively for up to 30 years if maintained (TRCA, 2016). The most frequently cited O&M concerns for pervious pavement practices include the following.
The sections below describe best practices to prevent or minimize these common problems.
Permeable pavement practices may be subject to high public visibility, sedimentation and vegetation growth and load due to vehicular traffic. Designers should design these practices in ways that prevent or minimize O&M issues. Examples include the following.
Designers should consult and include any local requirements regarding green infrastructure. O&M considerations often depend on whether the practice is located on public land, private land, or in the public right of way. For example, permeable pavement in the public right of way should be located where traffic loads are most suitable.
Designers should also recognize the need to perform frequent maintenance to remove trash, check for clogging, and if necessary perform practice cleaning. Designers can incorporate design solutions to facilitate maintenance activities. Examples include providing
The designer should also provide a site-specific O&M plan that includes the following.
For more information on see Operation and maintenance (O&M) of permeable pavement - supplemental information.
Proper construction methods and sequencing play a significant role in reducing O&M problems. Some key items during the construction phase include:
Effective short and long-term operation of permeable pavement practices requires a dedicated and routine maintenance plan with clear guidelines, expectations, and schedules. Proper maintenance will not only increase the expected lifespan of the facility but will improve aesthetics and property value. A maintenance plan clarifying maintenance responsibilities should be required for all practices.
Some important post-construction considerations are provided below along with recommended maintenance standards.
The tables below provide an overview and schedule of general maintenance activities and a list of common maintenance problems and how to troubleshoot them.
Link to this table
First Year of Operation | ||||
---|---|---|---|---|
Activity | Frequency | Time Period | Level of Effort | O&M Benefita |
Check pretreatment for proper flow/filtration. If applicable, assess the health of plantings and replant as necessary. | At least twice after storm events > 0.5 inches within 30 minutes of the event, then biannually | Within the first 6 months then during Spring / Fall | 2 hours | 1 |
Check that there is no ponding | At least twice after storm events > 0.5 inches within 30 minutes of the event | Within the first 6 months | 2 hours | 1 |
Check permeable parts of drainage area to make sure they are clean of debris and evidence of erosion | Biannually | All year long | 1,5 | |
Check for accumulation of sediment and organic debris on the permeable pavement surface. | Biannually | All year long | 1,5 | |
Check for damaged pavement | Biannually | All year long, especially after winter season | 1,5 | |
Replace any joint fill material, if applicable | Annually | As needed | 1,5 | |
Practice surface cleaning (vacuuming) | Biannually | Spring / Fall | 1 | |
Perform surface infiltration test | Biannually | After practice cleaning | 1 | |
Replace any joint fill material, if applicable | Annually | As needed | 1,5 | |
Clean underdrain | Biannually | Spring / Fall | 1 | |
After First Year of Operation | ||||
Activity | Frequency | Time Period | Level of Effort per Visit | O&M Benefita |
Check pretreatment for proper flow/filtration. If applicable, assess the health of plantings and replant as necessary. | Biannually | Spring / Fall | 2 hours | 1 |
Check that there is no ponding | Biannually | All year long | 2 hours | 1 |
Check permeable parts of drainage area to make sure they are clean of debris and evidence of erosion | Biannually | All year long | 1,5 | |
Check for accumulation of sediment and organic debris on the permeable pavement surface. | Biannually | All year long | 1,5 | |
Check for damaged pavement | Biannually | All year long, especially after winter season | 1,5 | |
Replace any joint fill material, if applicable | Annually | As needed | 1,5 | |
Practice surface cleaning (vacuuming) | Biannually | Spring / Fall | 1 | |
Perform surface infiltration test | Biannually | After practice cleaning | 1 | |
Perform surface infiltration test | Biannually | After practice cleaning | 1 | |
Clean underdrain | Biannually | Spring / Fall | 1 | |
After 5+ Years of Operation (non-routine maintenance) | ||||
Activity | Frequency | Time Period | Level of Effort per Visit | O&M Benefita |
After long term operation of the practice, some occasional and infrequent maintenance activities might be required, such as bigger repairs, partial rehabilitation, or redesign of key elements of the practice. | As needed | As needed | Could be significant depending on the activity | 1,5 |
aKey to Maintenance Benefits:
b. Note that many practitioners are minimizing the use of mulch or using alternatives to mulch to control weeds. Using mulch can cause clogging of inlet, outlet, and bypass pipes, and can introduce invasive species such as jump worms. Alternatives to mulch include ground vegetation such as clover or sedges, or arranging plantings in more dense configurations so as to minimize use of mulch. |
Link to this table
Troubleshooting Common Problems | ||
---|---|---|
Symptom | Possible Causes | Solution |
Standing water on permeable pavement area |
|
|
Maintenance costs will vary on a number of factors, including but not limited to:
Maintenance costs will vary depending on the size of the practice, its contributing drainage area, type of plantings, and whether it is part of a larger GI effort. Preventative maintenance is key to minimizing major costs associated with repairs. A general rule of thumb to estimate annual maintenance costs is 3%-6% of the installation costs. Maintenance costs should account for the number of hours of labor, the cost for different types of labor expertise required, and any equipment needed to successfully complete the maintenance activities.
A study published in 2017 by ASCE shows the range of annual maintenance cost of permeable pavement systems was estimated to be $0.06/sq ft to $0.31/sq ft in 2014 dollars. This translates to costs of $0.07/sq ft to $0.37/sq ft in 2021 dollars, though the estimates were based on data from 2005-2009 (Clary, 2017).
No special equipment is necessary for winter maintenance, however, regenerative air vacuum sweepers and other specialized cleaning equipment may be necessary to remove and prevent clogs.
Topics discussed include:
MPCA has compiled publicly available O&M resources related to green infrastructure. This non-exhaustive catalog is intended as a resource to practitioners. https://docs.google.com/spreadsheets/d/1TNGVghLhudcWPgXKLbLAu2cUWv6O3ZeS7-FIuLSGIPM/edit#gid=0
Document | Link |
---|---|
Operation & Maintenance Plan |
|
Construction phase inspection checklist |
|
O&M inspection checklist |
|
O&M example report |
|
Maintenance Agreements |
|
Toronto and Region Conservation Authority (TRCA). 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-7.4-Permeable-Pavements.pdf