[[File:Example of vegetated buffers.jpg|300px|thumb|alt=image of a linear project|<font size=3>Example of a linear project</font size>]] | [[File:Example of vegetated buffers.jpg|300px|thumb|alt=image of a linear project|<font size=3>Example of a linear project</font size>]] | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Box_7 Yes] |
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Box_11 No] |
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes | PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes | ||
Line 82: | Line 82: | ||
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? | Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Box_8 Yes] |
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Box_11 No] |
==Box 8== | ==Box 8== |
Did you gather the site information necessary to proceed through the flow chart?
Prior to using the flow chart, gather the following preliminary information.
Does project create one acre or more of new and/or fully reconstructed impervious surfaces?
PREVIOUS QUESTION and ANSWER: The previous question defined the performance goals.
MIDS PERFORMANCE GOAL DOES NOT APPLY
The project creates less than 1 acre of impervious surface.
Is the project linear?
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? Answer - Yes
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? Answer: Yes
Select Flexible treatment Option 2. You have completed the flow chart.
Applicant attempts to comply with the following conditions:
PREVIOUS STEP: It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made.
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:
PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible.
Are there zoning and land use requirements that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER:
or