m (→Box 6) |
m (→Box 6) |
||
Line 65: | Line 65: | ||
==Box 6== | ==Box 6== | ||
− | [[File:Example of | + | [[File:Example of mulch road.jpg|150px|thumb|alt=image of a project where ROW will not be constraining|<font size=3>Example of a linear project where site constraints likely do not exist</font size>]] |
+ | |||
+ | [[File:Example limited ROW.jpg|150px|thumb|alt=image of a project where ROW will be constraining|<font size=3>Example of a linear project where ROW will likely be constraining</font size>]] | ||
Is the project linear? | Is the project linear? | ||
Line 74: | Line 76: | ||
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes | PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes | ||
− | |||
− | |||
− | |||
− | |||
==Box 7== | ==Box 7== |
Did you gather the site information necessary to proceed through the flow chart?
Prior to using the flow chart, gather the following preliminary information.
Does project create one acre or more of new and/or fully reconstructed impervious surfaces?
PREVIOUS QUESTION and ANSWER: The previous question defined the performance goals.
MIDS PERFORMANCE GOAL DOES NOT APPLY
The project creates less than 1 acre of impervious surface.
Is the project linear?
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? Answer - Yes
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? Answer: Yes
Select Flexible treatment Option 2. You have completed the flow chart.
Applicant attempts to comply with the following conditions:
PREVIOUS STEP: It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made.
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:
PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible.
Are there zoning and land use requirements that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER:
or