Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
Line 128: | Line 130: | ||
==Step 10== | ==Step 10== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
===SELECT FLEXIBLE TREATMENT OPTION 3=== | ===SELECT FLEXIBLE TREATMENT OPTION 3=== | ||
Line 308: | Line 310: | ||
==Step 25== | ==Step 25== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible treatment Option 2 | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | + | Applicant attempts to comply with the following conditions: | |
− | + | #No infiltration practices allowed, and | |
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
*Provide soil borings or report from a professional geologist or geotechnical engineer | *Provide soil borings or report from a professional geologist or geotechnical engineer | ||
Line 379: | Line 387: | ||
==Step 31== | ==Step 31== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible treatment Option 2 | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Soil borings or report from a professional geologist or geotechnical engineer | ||
− | + | '''PREVIOUS STEP''': It was determined that shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater. | |
'''You have completed the flow chart''' | '''You have completed the flow chart''' | ||
Line 429: | Line 438: | ||
==Step 35== | ==Step 35== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible treatment Option 2 | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Provide Phase I or II ESAs or other documentation of potential contamination or hotspot runoff | ||
+ | *Provide documentation of extent of contamination and remediation alternatives considered | ||
'''PREVIOUS STEP''': It was determined that contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated. | '''PREVIOUS STEP''': It was determined that contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated. | ||
Line 494: | Line 504: | ||
==Step 41== | ==Step 41== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible treatment Option 2 | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Provide soil boring or infiltration test results documenting low-infiltration soils | ||
'''PREVIOUS STEP''': It was determined that soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | '''PREVIOUS STEP''': It was determined that soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
Line 544: | Line 555: | ||
==Step 45== | ==Step 45== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible treatment Option 2 | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Provide soil boring or infiltration test results documenting high-infiltration soils | ||
'''PREVIOUS QUESTION and ANSWER''': It was determined that soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | '''PREVIOUS QUESTION and ANSWER''': It was determined that soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
Line 593: | Line 605: | ||
==Step 49== | ==Step 49== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible, and | ||
+ | #*Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *provide report documenting potential hydrologic impacts from infiltration on the site, prepared by a registered engineer, hydrologist, or wetland specialist | ||
You have completed the flow chart | You have completed the flow chart | ||
==Step 50== | ==Step 50== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select FTO | + | :<font size=4>Select Flexible Treatment Option 1 (FTO #1)</font size> |
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
#Achieve at least 0.55 inch volume reduction goal, and | #Achieve at least 0.55 inch volume reduction goal, and | ||
Line 627: | Line 639: | ||
==Step 51== | ==Step 51== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
Complete design using the following performance goals | Complete design using the following performance goals | ||
Line 697: | Line 709: | ||
==Step 56== | ==Step 56== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | *No infiltration practices allowed | ||
+ | *Explore non-infiltration volume reduction practices | ||
+ | |||
+ | Provide the foillowing information | ||
+ | *Provide DWSMA or well location map | ||
'''PREVIOUS STEP''': It was determined that the site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU. | '''PREVIOUS STEP''': It was determined that the site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU. | ||
Line 808: | Line 823: | ||
==Step 64== | ==Step 64== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | #Options considered and presented shall examine the merits of relocating project | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Provide regulations and/or cost estimates documenting infeasibility of meeting the original Performance goal | ||
'''PREVIOUS STEP''': It was determined that | '''PREVIOUS STEP''': It was determined that | ||
Line 827: | Line 845: | ||
==Step 65== | ==Step 65== | ||
− | [[File:stop sign.png|100 px|left|alt=image of stop sign]] | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] |
− | Select Flexible | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
− | # | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. |
+ | |||
+ | Provide the following information | ||
+ | *Provide regulations and/or cost estimates documenting infeasibility of meeting the original Performance goal; | ||
+ | *Provide report documenting potential hydrologic impacts from infiltration on the site, prepared by a registered engineer, hydrologist, or wetland specialist | ||
'''PREVIOUS STEP''': It was determined that | '''PREVIOUS STEP''': It was determined that |
A flow chart was developed to determine the appropriate performance goal or Flexible Treatment Option for a new development, redevelopment, or linear site. You may access a pdf version of the flow chart (File:Final MIDS Flow chart.pdf) or follow the flow chart through the sequence of questions starting at Step 1 below. If you would like a copy of the flowchart in Visio, so that you can edit it, please contact us.
The wiki version of the flow chart, which starts below at Step 1, takes you through a series of questions and steps to ultimately arrive at a performance goal. The wiki version does not necessarily take you through each step nor does it completely match the pdf version of the flow chart. However, the sequence of questions and answers takes you to the same result.
Two advantages of using the wiki version on this page are that 1) the path through questions and answers is straightforward and 2) there are links, discussions, and images to assist you in answering questions.
Did you gather the site information necessary to proceed through the flow chart?
Prior to using the flow chart, gather the following preliminary information.
Does project create one acre or more of new and/or fully reconstructed impervious surfaces?
PREVIOUS QUESTION and ANSWER: The previous question defined the performance goals.
MIDS PERFORMANCE GOAL DOES NOT APPLY
The project creates less than 1 acre of impervious surface.
You have completed the flow chart.
Return to Minimal Impact Design Standards main page
Return to Design Sequence Flowchart-Flexible treatment options
Is the project linear?
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? Answer - Yes
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? Answer: Yes
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made.
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:
PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible.
Are there zoning and land use requirements that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER:
or
Is BMP relocation feasible
PREVIOUS QUESTION and ANSWER: Are there zoning and land use requirements that make the Performance Goal not feasible? Answer: Yes
Is Flexible Treatment Option (FTO) 1 feasible?
PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible - Answer: No
Applicant attempts to comply with the following conditions:
Is Flexible Treatment Option (FTO) 2 feasible?
Applicant attempts to comply with the following conditions:
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) 1 feasible? - Answer: No
Is the site located in a DWSMA (Drinking Water Supply Management Area), wellhead protection area, or within 200 feet of a drinking water well?
A drinking water supply management area (DWSMA) is the Minnesota Department of Health (MDH) approved surface and subsurface area surrounding a public water supply well that completely contains the scientifically calculated wellhead protection area and is managed by the entity identified in a wellhead protection plan. The boundaries of the drinking water supply management area are delineated by identifiable physical features, landmarks or political and administrative boundaries.
PREVIOUS QUESTION and ANSWER
or
Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater?
PREVIOUS QUESTION and ANSWER: Is the site located in a DWSMA, Wellhead Protection Area, or within 200 feet of a drinking water well? - Answer: Yes
Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER
or
Is BMP relocation feasible?
PREVIOUS QUESTION and ANSWER: - Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? - Answer: Yes
Is Flexible Treatment option (FTO) 1 feasible?
PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible? - Answer: No
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) 1 feasible? - Answer: No
Applicant attempts to comply with the following conditions:
Is karst present on the site?
If you are unsure, we recommend you review the guidance for karst in this manual. To retain your place in this flowchart, either open the karst guidance page in a new tab (right click on the link and select Open Link in New Tab), use the back arrow after visiting the karst guidance page, or use the Breadcrumbs at the top of the page.
PREVIOUS QUESTION and ANSWER:
or
Can a local unit of government (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater?
PREVIOUS QUESTION and ANSWER: Is karst present on the site? - Answer: Yes
Is BMP relocation onsite to a location without karst feasible?
PREVIOUS QUESTION and ANSWER: Can a local unit of government (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? - Answer: No
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a location without karst feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
Applicant attempts to comply with the following conditions:
You have completed the flow chart
Is shallow groundwater or shallow bedrock present on site?
If you are unsure, we recommend you review the guidance for shallow groundwater in this manual. To retain your place in this flowchart, either open the shallow groundwater guidance page in a new tab (right click on the link and select Open Link in New Tab), use the back arrow after visiting the shallow groundwater guidance page, or use the Breadcrumbs at the top of the page.
PREVIOUS QUESTION and ANSWER:
or
or
Conduct a detailed site investigation of shallow groundwater or shallow bedrock
PREVIOUS QUESTION and ANSWER: Is shallow groundwater or shallow bedrock present on site? - Answer: Yes
Is there more than 3 feet of soil depth from bottom of BMP to bedrock or groundwater (more than 10 feet is preferred)?
PREVIOUS STEP: You were asked to conduct a detailed site investigation of shallow groundwater or shallow bedrock
Is BMP relocation onsite to avoid shallow groundwater or shallow bedrock feasible?
PREVIOUS QUESTION and ANSWER: Is there more than 3 feet of soil depth from the bottom on the BMP to bedrock and groundwater (more than 10 feet is preferred)? - Answer: No
Can the BMP be raised?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to avoid shallow groundwater and shallow bedrock feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater.
You have completed the flow chart
Raise BMP enough to ensure 3 feet (preferably 10 feet) of soil between bottom of BMP and top of bedrock and groundwater
PREVIOUS QUESTION and ANSWER: Can the BMP be raised? Answer - Yes
Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff?
PREVIOUS QUESTION and ANSWER:
or
or
or
Can hotspot or contamination be isolated or remediated to mitigate risk of increased contamination?
PREVIOUS QUESTION and ANSWER: Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff? - Answer: Yes
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated.
You have completed the flow chart
Are there very low infiltrating soils (less than 0.2 inches per hour) on site?
PREVIOUS QUESTION and ANSWER:
or
Is BMP relocation onsite to a higher-infiltrating location feasible?
PREVIOUS QUESTION and ANSWER: Are there very low infiltrating soils (less than 0.2 inches per hour) on site? - Answer: Yes
Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a higher-infiltrating location feasible? - Answer: No
Provide soil boring or infiltration test results documenting low-infiltration soils.
PREVIOUS QUESTION and ANSWER: Can BMP be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)? Answer: No
Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours?
PREVIOUS STEP: You were asked to provide soil boring or infiltration test results documenting low-infiltration soils.
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)
You have completed the flow chart
Are there very high infiltrating soils (more than 8 inches per hour) on site?
PREVIOUS QUESTION and ANSWER:
or
or
Is BMP relocation onsite to a lower-infiltrating location feasible?
PREVIOUS QUESTION and ANSWER: Are there very high infiltrating soils (more than 8 inches per hour) on site? - Answer: Yes
Can subgrade be modified to slow the rate of infiltration to less than 8 inches per hour?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a lower-infiltrating location feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS QUESTION and ANSWER: It was determined that soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour
You have completed the flow chart
Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)?
PREVIOUS QUESTION and ANSWER: Are there very high infiltrating soils (greater than 8 inches per hour) present on site)? - Answer: No or
or
Can the BMP be relocated to avoid adverse hydrologic impacts?
PREVIOUS QUESTION and ANSWER: Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? - Answer: Yes
Would BMPs accomodating Flexible treatment option 1 avoid adverse hydrologic impacts?
PREVIOUS QUESTION and ANSWER: Can the BMP be relocated to avoid adverse hydrologic impacts? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
You have completed the flow chart
Applicant attempts to comply with the following conditions:
You have completed the flow chart
Complete design using the following performance goals
You have completed the flow chart
Do the following conditions apply?
and
Do the following conditions apply?
and
PREVIOUS QUESTION and ANSWER: You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements.
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
Do the following conditions apply?
and
PREVIOUS QUESTION and ANSWER: You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements.
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the foillowing information
PREVIOUS STEP: It was determined that the site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU.
You have completed the flow chart
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
PREVIOUS STEP: You determined that flexible Treatment option 1 is feasible.
Is Flexible Treatment Option 2 feasible?
Applicant attempts to comply with the following conditions:
Do the following conditions apply?
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours? - Answer: Yes
Do the following conditions apply?
Are there existing or proposed structures or infrastructure that make Flexible Treatment Option 1 not feasible?
PREVIOUS STEP: You determined that flexible Treatment option 1 is feasible.
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
PREVIOUS STEP: You determined that Flexible Treatment Option 1 is feasible.
Do the following conditions apply?
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that
You have completed the flow chart
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that
You have completed the flow chart
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Can the BMP be raised? - Answer: No