− | {{alert| | + | {{alert|Stormwater and rainwater harvest and use systems can improve or maintain watershed hydrology, reduce pollutant loading to receiving waters, increase water conservation, reduce stress on existing infrastructure, and reduce energy consumption|alert-success}} |
Unlike many other green infrastructure stormwater best management practices (BMPs), typical harvesting and use systems are not as sensitive to the particular sequence of construction, as long as temporary or construction phase stormwater treatment is addressed (i.e., the storage component can serve both temporary or construction phase stormwater treatment needs as well as long-term harvesting needs). Also, installation of harvest and use systems should be coordinated with any concurrent or related construction. An example construction sequence is shown below. | Unlike many other green infrastructure stormwater best management practices (BMPs), typical harvesting and use systems are not as sensitive to the particular sequence of construction, as long as temporary or construction phase stormwater treatment is addressed (i.e., the storage component can serve both temporary or construction phase stormwater treatment needs as well as long-term harvesting needs). Also, installation of harvest and use systems should be coordinated with any concurrent or related construction. An example construction sequence is shown below. | ||
Line 25: | Line 25: | ||
[[File:MPCA Stormwater Harvest and Use System Example Inspection Report.docx ]] | [[File:MPCA Stormwater Harvest and Use System Example Inspection Report.docx ]] | ||
+ | <noinclude> | ||
==Related pages== | ==Related pages== | ||
*[[Overview for stormwater and rainwater harvest and use/reuse]] | *[[Overview for stormwater and rainwater harvest and use/reuse]] | ||
Line 36: | Line 37: | ||
*[[Calculating credits for stormwater and rainwater harvest and use/reuse]] | *[[Calculating credits for stormwater and rainwater harvest and use/reuse]] | ||
*[[Definitions for stormwater and rainwater harvest and use/reuse]] | *[[Definitions for stormwater and rainwater harvest and use/reuse]] | ||
+ | *[https://stormwater.pca.state.mn.us/index.php?title=Requirements,_recommendations_and_information_for_using_Harvest_and_re-use/cistern_as_a_BMP_in_the_MIDS_calculator Requirements, recommendations and information for using Harvest and re-use/cistern as a BMP in the MIDS calculator] | ||
*[[Links for stormwater and rainwater harvest and use/reuse]] | *[[Links for stormwater and rainwater harvest and use/reuse]] | ||
*[[References for stormwater and rainwater harvest and use/reuse]] | *[[References for stormwater and rainwater harvest and use/reuse]] | ||
*[[Technical support for stormwater and rainwater harvest and use/reuse]] | *[[Technical support for stormwater and rainwater harvest and use/reuse]] | ||
+ | </noinclude> | ||
+ | <noinclude> | ||
+ | [[Category:Level 3 - Best management practices/Nonstructural practices/Harvest and reuse]] | ||
+ | [[Category:Level 3 - Best management practices/Specifications and details/Construction specifications]] | ||
+ | </noinclude> |
Unlike many other green infrastructure stormwater best management practices (BMPs), typical harvesting and use systems are not as sensitive to the particular sequence of construction, as long as temporary or construction phase stormwater treatment is addressed (i.e., the storage component can serve both temporary or construction phase stormwater treatment needs as well as long-term harvesting needs). Also, installation of harvest and use systems should be coordinated with any concurrent or related construction. An example construction sequence is shown below.
The timing between construction steps can vary depending on the project, with months to years from the start of construction until an entire system is in place. This is often the case for stormwater pond and irrigation use systems. For example, initial pond construction and pump installation in new developments could be completed months to years prior to pump installation and final site work (landscaping and irrigation system installation).
You can access an example inspection report by clicking on the following link:
File:MPCA Stormwater Harvest and Use System Example Inspection Report.docx