(→10.2) |
m (→10.2) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 11: | Line 11: | ||
:a. submit Part 1 of the permit application (includes the permit application fee); and | :a. submit Part 1 of the permit application (includes the permit application fee); and | ||
− | :b. submit Part 2 of the permit application, also known as the Stormwater Pollution Prevention Program (SWPPP) document, in accordance with [https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_12_Stormwater_Pollution_Prevention_Program_(SWPPP)_Document Section 12]. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big> | + | :b. submit [https://www.pca.state.mn.us/water/2020-ms4-general-permit Part 2 of the permit application], also known as the Stormwater Pollution Prevention Program (SWPPP) document, in accordance with [https://stormwater.pca.state.mn.us/index.php?title=2020_MS4_General_Permit_Section_12_Stormwater_Pollution_Prevention_Program_(SWPPP)_Document Section 12]. [[https://www.revisor.mn.gov/rules/7090/ Minn. R. 7090]]</big> |
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 2 - Regulatory/Municipal (MS4)]] | ||
+ | </noinclude> |
New Permittee Applicants. [Minn. R. 7090]
To become a new permittee authorized to discharge stormwater under the General Permit, the owner /operator of a small MS4 must submit an application, on a form provided by the Agency, in accordance with the schedule in Appendix B, Table 3, and the following requirements:
This page was last edited on 22 November 2022, at 16:47.