m |
m |
||
(2 intermediate revisions by the same user not shown) | |||
Line 33: | Line 33: | ||
**[[Operation and maintenance (O&M) of permeable pavement]] | **[[Operation and maintenance (O&M) of permeable pavement]] | ||
**[[Operation and maintenance (O&M) of permeable pavement - supplemental information]] | **[[Operation and maintenance (O&M) of permeable pavement - supplemental information]] | ||
+ | |||
+ | <noinclude> | ||
+ | [[Category:Level 3 - Best management practices/Specifications and details/Operation and maintenance]] | ||
+ | </noinclude> |
Link to this table | |||||||||
---|---|---|---|---|---|---|---|---|---|
Benefit | Bioretention and infiltration | Tree trench and tree box | Green roof | Vegetated swale | Vegetated filter strip | Permeable pavement | Constructed wetland | Rainwater harvesting | |
Water quality2 | |||||||||
Water quantity/supply2 | |||||||||
Energy savings | |||||||||
Climate resiliency | |||||||||
Air quality | |||||||||
Habitat improvement | |||||||||
Community livability | |||||||||
Health benefits | |||||||||
Economic savings | |||||||||
Macroscale benefits | |||||||||
Level of benefit: ◯ - none; ◔; - small; ◑ - moderate; ◕ - large; ● - very large 1The ratings are based on "best" practices scenario, where a practice has been properly designed, constructed, and maintained. For vegetated practices, it is generally assumed native perennial vegetation is used. 2 Benefits assume there is no underdrain. If an underdrain is present, the benefit will be reduced. |
This page provides links to information on operation and maintenance of green infrastructure practices.
This page was last edited on 3 December 2022, at 23:38.