m
 
(9 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<!--
+
{{alert|This is an edit page for the Stormwater Manual editors|alert-info}}
 +
 
 
<table class="sortable">
 
<table class="sortable">
 
<tr><th>PSH Operation</th>
 
<tr><th>PSH Operation</th>
Line 9: Line 10:
 
*Improper disposal of fluids down shop and storm drains
 
*Improper disposal of fluids down shop and storm drains
 
*Spilled fuel, leaks and drips from wrecked vehicles
 
*Spilled fuel, leaks and drips from wrecked vehicles
*Hosing of ourdoor work areas*Wash water from cleaning
+
*Hosing of outdoor work areas*Wash water from cleaning
 
*Uncovered outdoor storage of liquids/oils/batteries spills
 
*Uncovered outdoor storage of liquids/oils/batteries spills
 
*Pollutant wash-off from parking lot</td>
 
*Pollutant wash-off from parking lot</td>
Line 42: Line 43:
 
*Improper rinsing of fertilizer/pesticide applicators</td>
 
*Improper rinsing of fertilizer/pesticide applicators</td>
 
</tr>
 
</tr>
<tr><td>Unique PSH Operations (Pools, Golf Courses, Marinas, Construciton, Restaurants, Hobby Famrs)</td><td>
+
<tr><td>Unique PSH Operations (Pools, Golf Courses, Marinas, Construction, Restaurants, Hobby Famrs)</td><td>
 
Varies but includes:
 
Varies but includes:
 
*Discharge of chlorinated water from pools
 
*Discharge of chlorinated water from pools
Line 52: Line 53:
 
<tr>
 
<tr>
 
<td>Image Example</td>
 
<td>Image Example</td>
<td>[[File:testing.png|200px]]</td>
+
<td></td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 73: Line 74:
 
<td>{{circle|full}}</td>
 
<td>{{circle|full}}</td>
 
</tr>
 
</tr>
</table>-->
+
</table>
  
 
==Default 2 column, 10 row table==
 
==Default 2 column, 10 row table==
Line 89: Line 90:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td></td>
+
<td>X</td>
<td>X</td></tr>
+
<td>X</td>
<tr><td>X</td>
+
</tr>
 +
<tr>
 +
<td>X</td>
 
<td>X</td>
 
<td>X</td>
 
</tr>
 
</tr>
<tr><td>X</td>
+
<tr>
 +
<td>X</td>
 
<td>X</td>
 
<td>X</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>X</td>
 
<td>X</td>
<td>X</td></tr>
+
<td>X</td>
 +
</tr>
 
<tr>
 
<tr>
 
<td>X</td>
 
<td>X</td>
Line 251: Line 256:
 
===''BIORETENTION'' - Construction Inspection Checklist===
 
===''BIORETENTION'' - Construction Inspection Checklist===
  
<table border="1">
+
<table class="checklist-proj-info">
 
  <tr>
 
  <tr>
   <td width="800">Project: </td>
+
   <td>Project: </td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
Line 272: Line 277:
 
</table>
 
</table>
  
<table border="1">  
+
<table class="checklist">  
 
  <tr>
 
  <tr>
   <th width="200">Construction Sequence</th>
+
   <th>Construction Sequence</th>
 
   <th>Satisfactory/ Unsatisfacroty</th>
 
   <th>Satisfactory/ Unsatisfacroty</th>
   <th width="400">Comments</th>
+
   <th>Comments</th>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td bgcolor="D0D0D0" colspan="3">1. Pre Construction</td>
+
   <td colspan="3">1. Pre Construction</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Pre Construction Meeting</td>
+
   <td>Pre Construction Meeting</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Runoff diverted</td>
+
   <td>Runoff diverted</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Facility area cleared</td>
+
   <td>Facility area cleared</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Soil tested for permibility</td>
+
   <td>Soil tested for permibility</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Project benchmark near site</td>
+
   <td>Project benchmark near site</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>  
 
  </tr>  
 
  <tr>
 
  <tr>
   <td width="200">facility location staked out</td>
+
   <td>facility location staked out</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Temporary erosion and sedimant protection properly installed</td>
+
   <td>Temporary erosion and sedimant protection properly installed</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td bgcolor="D0D0D0" colspan="3">2. Excavation</td>
+
   <td colspan="3">2. Excavation</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">lateral slopes completly level</td>
+
   <td>lateral slopes completely level</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Soils not compacted durring excavation</td>
+
   <td>Soils not compacted during excavation</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Longitudinal slopes within design range</td>
+
   <td>Longitudinal slopes within design range</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence</td>
+
   <td>Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td bgcolor="D0D0D0" colspan="3">3. Structural Components</td>
+
   <td colspan="3">3. Structural Components</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Stone diaphragm installed per plans</td>
+
   <td>Stone diaphragm installed per plans</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Outlets installed pre plans</td>
+
   <td>Outlets installed pre plans</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Underdrain installed to grade</td>
+
   <td>Underdrain installed to grade</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Pretreatment devices installed per plans</td>
+
   <td>Pretreatment devices installed per plans</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Soil bed composition and texture conforms to specifications</td>
+
   <td>Soil bed composition and texture conforms to specifications</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td bgcolor="D0D0D0" colspan="3">4. Vegitation</td>
+
   <td colspan="3">4. Vegitation</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Construction Sequence</td>
+
   <td>Construction Sequence</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Complies with planting specs</td>
+
   <td>Complies with planting specs</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Topsoil complies with specs in composition and placement</td>
+
   <td>Topsoil complies with specs in composition and placement</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Soil properly stabilized for permanent erosion control</td>
+
   <td>Soil properly stabilized for permanent erosion control</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td bgcolor="D0D0D0" colspan="3">5. Final Inspection</td>
+
   <td colspan="3">5. Final Inspection</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Dimensions per plans</td>
+
   <td>Dimensions per plans</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Pretreatment operational</td>
+
   <td>Pretreatment operational</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Inlet/outlet operational</td>
+
   <td>Inlet/outlet operational</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Soil/ filter bed permeability verified</td>
+
   <td>Soil/ filter bed permeability verified</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
Line 415: Line 420:
 
  <tr>
 
  <tr>
 
<tr>
 
<tr>
   <td width="200">Effective stand of vegetation stabilized</td>
+
   <td>Effective stand of vegetation stabilized</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
Line 421: Line 426:
 
  <tr>
 
  <tr>
 
  <tr>
 
  <tr>
   <td width="200">Construction generated sediments removed</td>
+
   <td>Construction generated sediments removed</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="200">Contributing watershed stabilized before flow is diverted to the practice</td>
+
   <td>Contributing watershed stabilized before flow is diverted to the practice</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
Line 432: Line 437:
 
</table>
 
</table>
  
<table border="1">
+
<table class="checklist-summary">
 
  <tr>
 
  <tr>
   <td width="800" height="300">Comments</td>
+
   <td>Comments</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td width="800" height="300">Actions to be taken:</td>
+
   <td>Actions to be taken:</td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <td color="3A87AD" bgcolor="D9EDF7" width="800">Bioretention Construction Inspection Checklist                                                        </td>
+
   <td>Bioretention Construction Inspection Checklist                                                        </td>
 
  </tr>
 
  </tr>
 
</table>
 
</table>
Line 446: Line 451:
 
===''BIORETENTION'' - Operation and Maintenance Checklist===
 
===''BIORETENTION'' - Operation and Maintenance Checklist===
  
<table border="1">
+
<table class="checklist-proj-info">
 
  <tr>
 
  <tr>
   <td width="800">Project: </td>
+
   <td>Project: </td>
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
Line 467: Line 472:
 
</table>
 
</table>
  
  <table border="1">  
+
  <table class="checklist">  
 
   <tr>
 
   <tr>
   <th width="200">Maintenance Item</th>
+
   <th>Maintenance Item</th>
 
   <th>Satisfactory / Unsatisfactory</th>
 
   <th>Satisfactory / Unsatisfactory</th>
   <th width="400">Comments</th>
+
   <th>Comments</th>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">1. Debris Cleanout (Monthly)</td>
+
   <td colspan="3">1. Debris Cleanout (Monthly)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Contributing areas clean of litter and vegetative debris</td>
+
   <td>Contributing areas clean of litter and vegetative debris</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No dumping of yard wastes into practice</td>
+
   <td>No dumping of yard wastes into practice</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Bioretention area clean of litter and vegetative debris</td>
+
   <td>Bioretention area clean of litter and vegetative debris</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">2. Vegetation (Monthly)</td>
+
   <td colspan="3">2. Vegetation (Monthly)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Plant height taller than design water depth</td>
+
   <td>Plant height taller than design water depth</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Fertilized per O&M plan</td>
+
   <td>Fertilized per O&M plan</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Plant composition according to O&M plan</td>
+
   <td>Plant composition according to O&M plan</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Undesirable vegetation removed</td>
+
   <td>Undesirable vegetation removed</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Grass height less than 6 inches</td>
+
   <td>Grass height less than 6 inches</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of erosion</td>
+
   <td>No evidence of erosion</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">3. Check Dams/Energy Dissipators/Sumps (Annual, After Major Storms)</td>
+
   <td colspan="3">3. Check Dams/Energy Dissipaters/Sumps (Annual, After Major Storms)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of sediment buildup</td>
+
   <td>No evidence of sediment buildup</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Sumps should not be more than 50% full of sediment</td>
+
   <td>Sumps should not be more than 50% full of sediment</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of erosion at downstream toe of drop structure</td>
+
   <td>No evidence of erosion at downstream toe of drop structure</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">4. Dewatering (Monthly)</td>
+
   <td colspan="3">4. Dewatering (Monthly)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Dewaters between storms within 48 hours</td>
+
   <td>Dewaters between storms within 48 hours</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of standing water</td>
+
   <td>No evidence of standing water</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">5. Sediment Deposition (Annual)</td>
+
   <td colspan="3">5. Sediment Deposition (Annual)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Pretreatment areas clean of sediments</td>
+
   <td>Pretreatment areas clean of sediments</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Contributing drainage area stabilized and clear of erosion</td>
+
   <td>Contributing drainage area stabilized and clear of erosion</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Winter sand deposition evacuated every spring</td>
+
   <td>Winter sand deposition evacuated every spring</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">6. Outlet/Overflow Spillway (Annual, After Major Storms)</td>
+
   <td colspan="3">6. Outlet/Overflow Spillway (Annual, After Major Storms)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Good condition, no need for repair</td>
+
   <td>Good condition, no need for repair</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of erosion</td>
+
   <td>No evidence of erosion</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">No evidence of any blockages</td>
+
   <td>No evidence of any blockages</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td bgcolor="D0D0D0" colspan="3">7. Integrity of Filter Bed (Annual)</td>
+
   <td colspan="3">7. Integrity of Filter Bed (Annual)</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="200">Filter bed has not been blocked or filled inappropriately</td>
+
   <td>Filter bed has not been blocked or filled inappropriately</td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
 
   <td></td>
Line 601: Line 606:
 
</table>
 
</table>
  
<table border="1">
+
<table class="checklist-summary">
 
   <tr>
 
   <tr>
   <td width="800" height="300">Comments</td>
+
   <td>Comments</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td width="800" height="300">Actions to be taken:</td>
+
   <td>Actions to be taken:</td>
 
   </tr>
 
   </tr>
 
   <tr>
 
   <tr>
   <td color="3A87AD" bgcolor="D9EDF7" width="800">Bioretention Operation, Maintenance and Management Inspection Checklist</td>
+
   <td>Bioretention Operation, Maintenance and Management Inspection Checklist</td>
 
   </tr>
 
   </tr>
 
</table>
 
</table>
 +
 +
[[Category:Level 2 - General information, reference, tables, images, and archives/Reference‏‎]]

Latest revision as of 18:44, 19 December 2022

Information: This is an edit page for the Stormwater Manual editors
PSH Operation Polluting Activity
Vehicle Operations
  • Improper disposal of fluids down shop and storm drains
  • Spilled fuel, leaks and drips from wrecked vehicles
  • Hosing of outdoor work areas*Wash water from cleaning
  • Uncovered outdoor storage of liquids/oils/batteries spills
  • Pollutant wash-off from parking lot
Outdoor Materials
  • Spills at loading areas
  • Hosing/washing of loading areas into shop or storm drains
  • Wash-off of uncovered bulk materials and liquids stored outside, of particular concern in MN are road salt storage areas
  • Leaks and spills
Waste Management
  • Spills and leaks of liquids
  • Dumping into storm drains
  • Leaking dumpsters (Dumpster juice)
  • Wash-off of dumpster spillage
  • Accumulation of particulate deposits
Physical Plant Maintenance
  • Discharges from power washing and steam cleaning
  • Wash-off of fine particles from painting/sandblasting operations
  • Rinse water and wash water discharges during cleanup
  • Temporary outdoor storage
  • Runoff from degreasing and re-surfacing
Turf and Landscaping
  • Non-target irrigation
  • Runoff of nutrients and pesticides
  • Deposition and subsequent washoff of soil and organic matter on impervious surfaces
  • Improper rinsing of fertilizer/pesticide applicators
Unique PSH Operations (Pools, Golf Courses, Marinas, Construction, Restaurants, Hobby Famrs)

Varies but includes:

  • Discharge of chlorinated water from pools
  • Improper disposal of sewage and grease
  • Wash off of livestock manure
  • Soil erosion
  • Runooff of pesticides
  • Salt storage
Image Example
Empty Circle
Quarter Circle
Half Circle
Full Circle

Default 2 column, 10 row table

X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X

Default 3 column, 10 row table

X X X
X X X
X X X
X X X
X X X
X X X
X X X
X XX
X XX
X XX
X XX
X XX

Default 4 column, 10 row table

X XX X
XX X X
X X X X
X X X X
X X XX
XX X X
XX X X
X XX X
X X X X
X X X X
X X X X
X X X X

This is a test of the checklist format

BIORETENTION - Construction Inspection Checklist

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory/ Unsatisfacroty Comments
1. Pre Construction
Pre Construction Meeting
Runoff diverted
Facility area cleared
Soil tested for permibility
Project benchmark near site
facility location staked out
Temporary erosion and sedimant protection properly installed
2. Excavation
lateral slopes completely level
Soils not compacted during excavation
Longitudinal slopes within design range
Stockpile location not adjacent to excavation area and stablized with vegitation and/or silt fence
3. Structural Components
Stone diaphragm installed per plans
Outlets installed pre plans
Underdrain installed to grade
Pretreatment devices installed per plans
Soil bed composition and texture conforms to specifications
4. Vegitation
Construction Sequence
Complies with planting specs
Topsoil complies with specs in composition and placement
Soil properly stabilized for permanent erosion control
5. Final Inspection
Dimensions per plans
Pretreatment operational
Inlet/outlet operational
Soil/ filter bed permeability verified
Effective stand of vegetation stabilized
Construction generated sediments removed
Contributing watershed stabilized before flow is diverted to the practice
Comments
Actions to be taken:
Bioretention Construction Inspection Checklist

BIORETENTION - Operation and Maintenance Checklist

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Maintenance Item Satisfactory / Unsatisfactory Comments
1. Debris Cleanout (Monthly)
Contributing areas clean of litter and vegetative debris
No dumping of yard wastes into practice
Bioretention area clean of litter and vegetative debris
2. Vegetation (Monthly)
Plant height taller than design water depth
Fertilized per O&M plan
Plant composition according to O&M plan
Undesirable vegetation removed
Grass height less than 6 inches
No evidence of erosion
3. Check Dams/Energy Dissipaters/Sumps (Annual, After Major Storms)
No evidence of sediment buildup
Sumps should not be more than 50% full of sediment
No evidence of erosion at downstream toe of drop structure
4. Dewatering (Monthly)
Dewaters between storms within 48 hours
No evidence of standing water
5. Sediment Deposition (Annual)
Pretreatment areas clean of sediments
Contributing drainage area stabilized and clear of erosion
Winter sand deposition evacuated every spring
6. Outlet/Overflow Spillway (Annual, After Major Storms)
Good condition, no need for repair
No evidence of erosion
No evidence of any blockages
7. Integrity of Filter Bed (Annual)
Filter bed has not been blocked or filled inappropriately
Comments
Actions to be taken:
Bioretention Operation, Maintenance and Management Inspection Checklist

This page was last edited on 19 December 2022, at 18:44.