[[File:Pervious concrete cross section.jpg|thumb|300 px|alt=This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.</font size>]] | [[File:Pervious concrete cross section.jpg|thumb|300 px|alt=This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.</font size>]] | ||
Line 6: | Line 6: | ||
[[File:Permeable interlocking concrete pavement cross section.jpg|thumb|300 px|alt=This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system|<font size>Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.</font size>]] | [[File:Permeable interlocking concrete pavement cross section.jpg|thumb|300 px|alt=This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system|<font size>Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.</font size>]] | ||
+ | |||
+ | {{alert|Permeable pavement can be an important tool for retention and detention of stormwater runoff. Permeable pavement may provide additional benefits, including reducing the need for de-icing chemicals, and providing a durable and aesthetically pleasing surface.|alert-success}} | ||
This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed. | This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed. | ||
+ | |||
+ | ==Design phase maintenance considerations== | ||
+ | Implicit in the design guidance is the fact that many design elements of infiltration and filtration systems can minimize the maintenance burden and maintain pollutant removal efficiency. Key examples include | ||
+ | *limiting drainage area; | ||
+ | *providing easy site access (''REQUIRED''); and | ||
+ | *providing [[Glossary#P|pretreatment]] (''REQUIRED''). | ||
+ | |||
+ | For more information on design information for individual infiltration and filtration practices, [http://stormwater.pca.state.mn.us/index.php/Category:Design_criteria link here]. | ||
==Hydrologic design considerations== | ==Hydrologic design considerations== | ||
Line 15: | Line 25: | ||
*Soils – Soil conditions and infiltration rates determine the use of an [[Glossary|underdrain]]. ([http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/home NRCS] [[Glossary|Hydrologic Soil Group]] (HSG) C or D soils usually require an underdrain, whereas HSG A and B soils often do not.) Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on soil surveys should be considered as primary locations for all types of infiltration practices. | *Soils – Soil conditions and infiltration rates determine the use of an [[Glossary|underdrain]]. ([http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/home NRCS] [[Glossary|Hydrologic Soil Group]] (HSG) C or D soils usually require an underdrain, whereas HSG A and B soils often do not.) Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on soil surveys should be considered as primary locations for all types of infiltration practices. | ||
− | :Soil surveys and HSG classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per [http://www.astm.org/Standard/index.shtml ASTM] D2487. However, it is best to determine rates using on-site infiltration testing per ASTM D3385 Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring or other available methods. The median rate determined from in-situ measurements should be reduced by a factor of 2.5 and this reduced value used in design calculations. This reduction accounts for incidental compaction during construction and sedimentation of the subgrade over time. | + | :Soil surveys and HSG classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per [http://www.astm.org/Standard/index.shtml ASTM] D2487. However, it is best to determine rates using on-site infiltration testing per ASTM D3385 Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring or other available methods. The median rate determined from in-situ measurements should be reduced by a factor of 2.5 and this reduced value used in design calculations. This reduction accounts for incidental compaction during construction and sedimentation of the subgrade over time. |
+ | |||
+ | {{alert|The safety factor of 2.5 is greater than a factor of 2 recommended in most guidance for permeable pavement. This manual utilizes recommended soil infiltration rates for hydrologic soil groups (see [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates]). These are not as conservative as infiltration rates based on the [https://www.pca.state.mn.us/sites/default/files/p-gen3-12d.pdf Unified Soil Classification System], particularly for finer textured soils. We therefore recommended the more conservative value of 2.5|alert-info}} | ||
:In most cases, permeable pavement should not be situated above fill soils. Designs in compacted fill soils may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer. | :In most cases, permeable pavement should not be situated above fill soils. Designs in compacted fill soils may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer. | ||
Line 21: | Line 33: | ||
*Geotextiles - In the absence of full-depth concrete curbs or impermeable liners, geotextiles are recommended on the (vertical) sides of permeable pavements to separate the reservoir layers from the adjacent soil subgrade. Horizontally placed geotextiles between the aggregate base and soil subgrade are at the option of the designer. Geotextile use should be carefully evaluated and selection should be guided by AASHTO M-288 Geotextile for Highway Applications ([[References for permeable pavement|AASHTO 2010]]). Specific selection guidance is provided under the Subsurface Drainage section. Class II geotextiles are generally used. | *Geotextiles - In the absence of full-depth concrete curbs or impermeable liners, geotextiles are recommended on the (vertical) sides of permeable pavements to separate the reservoir layers from the adjacent soil subgrade. Horizontally placed geotextiles between the aggregate base and soil subgrade are at the option of the designer. Geotextile use should be carefully evaluated and selection should be guided by AASHTO M-288 Geotextile for Highway Applications ([[References for permeable pavement|AASHTO 2010]]). Specific selection guidance is provided under the Subsurface Drainage section. Class II geotextiles are generally used. | ||
− | *Contributing drainage area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased to no greater than 5:1 if at least one of these conditions exists: | + | *Contributing drainage area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. Runoff from permeable areas is not recommended due to potential clogging of the permeable pavement. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased to no greater than 5:1 if at least one of these conditions exists: |
**permeable pavement is receiving runoff from roofs as it tends to be very low in sediment; or | **permeable pavement is receiving runoff from roofs as it tends to be very low in sediment; or | ||
− | **runoff from adjacent impervious surfaces remains unburdened with sediment due to effective | + | **runoff from adjacent impervious surfaces remains unburdened with sediment due to effective pretreatment prior to entering the permeable pavement. |
+ | |||
+ | For more information on contributing area, see [[Contributing drainage area to stormwater BMPs]]. | ||
{{alert|Permeable pavement and contributing impervious pavements are assumed to receive regular vacuuming to reduce and control sediment loads and surface clogging potential.|alert-warning}} | {{alert|Permeable pavement and contributing impervious pavements are assumed to receive regular vacuuming to reduce and control sediment loads and surface clogging potential.|alert-warning}} | ||
Line 37: | Line 51: | ||
*Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged. | *Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged. | ||
− | *Minimum depth to seasonal high water table – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is | + | *Minimum depth to [[Glossary#S|seasonal high water table]] – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is Highly recommended between the liner and the seasonal high water table. |
− | *Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” [ | + | *Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” [https://nepis.epa.gov/Exe/ZyNET.exe/91018M1N.TXT?ZyActionD=ZyDocument&Client=EPA&Index=1995+Thru+1999&Docs=&Query=&Time=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex%20Data%5C95thru99%5CTxt%5C00000032%5C91018M1N.txt&User=ANONYMOUS&Password=anonymous&SortMethod=h%7C-&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g8/x150y150g16/i425&Display=hpfr&DefSeekPage=x&SearchBack=ZyActionL&Back=ZyActionS&BackDesc=Results%20page&MaximumPages=1&ZyEntry=1&SeekPage=x&ZyPURL EPA 832-F-99-023]). Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases. |
:Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners. | :Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners. | ||
Line 47: | Line 61: | ||
{{alert|Permeable pavement can be used at highly developed urban sites that have little or no space retention.|alert-success}} | {{alert|Permeable pavement can be used at highly developed urban sites that have little or no space retention.|alert-success}} | ||
− | {{alert| | + | {{alert|The required setback distance to a municipal water supply well is 50 feet, but it is recommended that permeable pavements be a minimum horizontal distance of 100 feet from any municipal water supply well|alert-warning}} |
− | {{alert|A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table.|alert-danger}} | + | {{alert|A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table ([[Glossary#S|saturated soil]]) or the top of bedrock (i.e. there must be a minimum of 3 feet of undisturbed soil beneath the infiltration practice and the seasonally high water table or top of bedrock).|alert-danger}} |
*Limitations – There are several limitations for use of permeable pavement, as summarized below. | *Limitations – There are several limitations for use of permeable pavement, as summarized below. | ||
Line 61: | Line 75: | ||
===Structural design=== | ===Structural design=== | ||
− | The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association ([http://www.pavement.com/ ACPA] 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association [http://www.nrmca.org/ NRMCA] and the | + | The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association ([http://www.pavement.com/ ACPA] 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association [http://www.nrmca.org/ NRMCA] and the [https://www.cement.org/ Portland Cement Association]. |
<p>Porous asphalt ([[References for permeable pavement|Hansen 2008]]) and permeable interlocking pavements ([[References for permeable pavement|Smith 2011]]) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of Pavement Structures'' ([[References for permeable pavement|AASHTO 1993]]). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.</p> | <p>Porous asphalt ([[References for permeable pavement|Hansen 2008]]) and permeable interlocking pavements ([[References for permeable pavement|Smith 2011]]) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of Pavement Structures'' ([[References for permeable pavement|AASHTO 1993]]). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.</p> | ||
<p>There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.</p> | <p>There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.</p> | ||
Line 77: | Line 91: | ||
These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.</p> | These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.</p> | ||
<p>Pedestrian applications can be placed on lower strength soils than those noted.</p> | <p>Pedestrian applications can be placed on lower strength soils than those noted.</p> | ||
− | |||
<!--===Hydrologic Sizing=== | <!--===Hydrologic Sizing=== | ||
The soil subgrade infiltration rate typically is far lower than the flow rate through the pavement, so some reservoir storage will usually be required to maximize the stormwater benefit of permeable pavement. Often times permeable pavement is designed to store a given design storm. For instance, Minnesota’s Minimal Impact Design Standards ([[Performance goals for new development, re-development and linear projects|MIDS]]) require a performance goal of managing 1.1 inches of runoff from the tributary impervious surfaces. For this design standard, the volume of the reservoir layer will be required to store 1.1 inches of stormwater runoff entering from the impervious area plus rainfall directly into the permeable pavement itself. | The soil subgrade infiltration rate typically is far lower than the flow rate through the pavement, so some reservoir storage will usually be required to maximize the stormwater benefit of permeable pavement. Often times permeable pavement is designed to store a given design storm. For instance, Minnesota’s Minimal Impact Design Standards ([[Performance goals for new development, re-development and linear projects|MIDS]]) require a performance goal of managing 1.1 inches of runoff from the tributary impervious surfaces. For this design standard, the volume of the reservoir layer will be required to store 1.1 inches of stormwater runoff entering from the impervious area plus rainfall directly into the permeable pavement itself. | ||
Line 111: | Line 124: | ||
===Outflow rate and volume through underdrains=== | ===Outflow rate and volume through underdrains=== | ||
− | If the depth of the base/subbase for the full infiltration system is excessive, because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains). | + | If the depth of the base/subbase for the full infiltration system is excessive, because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains). |
+ | The outflow rate from underdrain(s) can be approximated by | ||
+ | |||
+ | <math>q_u = k m</math> | ||
+ | |||
+ | where | ||
:''q<sub>u</sub>'' = outflow through underdrain, feet/hour | :''q<sub>u</sub>'' = outflow through underdrain, feet/hour | ||
:''k'' = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour | :''k'' = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour | ||
:''m'' = underdrain pipe slope, feet/feet | :''m'' = underdrain pipe slope, feet/feet | ||
− | |||
− | |||
− | |||
− | |||
− | + | This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet per day or 8,500 inches per hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet per day per pipe can be used to approximate the average underdrain outflow rate. | |
− | |||
− | |||
− | |||
− | This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet per day or 8,500 inches per hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet | ||
Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by | Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by | ||
− | <math>d_p = | + | <math>d_p = ((0.95 * RP) – (i/2)t_f)) / n</math> |
where | where | ||
+ | :0.95 is the runoff coefficient for impermeable surfaces; | ||
:''d<sub>p</sub>'' = the depth of the reservoir layer (feet); | :''d<sub>p</sub>'' = the depth of the reservoir layer (feet); | ||
− | + | :''R'' = ''A''<sub>''c''</sub>/''A''<sub>''p''</sub> The ratio of the contributing drainage area (''A''<sub>''c''</sub>, including the permeable paving surface), to the permeable pavement surface area (''A''<sub>''p''</sub>); | |
− | :''R'' = ''A''<sub>''c''</sub>/''A''<sub>''p''</sub> The ratio of the contributing drainage area (''A''<sub>''c''</sub>, | ||
:''t<sub>f</sub>'' = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day; | :''t<sub>f</sub>'' = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day; | ||
− | :''P'' = the rainfall depth for the | + | :''P'' = the rainfall depth for the design storm (feet); |
− | :''V<sub>r</sub>'' = the void ratio for the reservoir layer (typically 0.4). | + | :''i'' = field-verified infiltration rate (ft/day); and |
+ | :''n'' = porosity (cubic feet/cubic feet) | ||
+ | <!--:''V<sub>r</sub>'' = the void ratio for the reservoir layer (typically 0.4).--> | ||
To estimate the number of underdrain pipes (N), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number. | To estimate the number of underdrain pipes (N), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number. | ||
− | '' | + | With full infiltration systems, the maximum allowable drain time (''t''<sub>''d''</sub>) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade. |
− | + | <math>t{d} = (d_pn) / (0.5i) </math> | |
− | < | + | The total storage in the permeable pavement system, V<sub>s</sub>, is given by |
− | + | <math> V_{s} = A_{p} (d_pn + 0.5it_{f}) </math> | |
− | < | + | where |
+ | :''A<sub>p</sub>'' is the surface area of the permeable pavement (ft<sup>2</sup>). | ||
− | + | When calculating the storage volume for compliance with the Construction Stormwater Permit, only the instantaneous storage volume is considered | |
− | <math> | + | <math> V_{s} = A_{p} (d_pn) </math> |
Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design. | Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design. | ||
− | |||
− | |||
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet. | Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet. | ||
Line 173: | Line 184: | ||
===Soil infiltration rate testing=== | ===Soil infiltration rate testing=== | ||
− | Prior to infiltration testing, | + | Prior to infiltration testing, soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Guidance for conducting infiltration tests and for determining the number of borings can be found [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_bioretention#Determine_site_infiltration_rates_.28for_facilities_with_infiltration_and.2For_recharge.29 here]. |
+ | <!-- | ||
+ | Boring depths should be at least 2 feet deeper than the anticipated depth of the permeable pavement. At least one soil boring must be taken to confirm the underlying soil properties at the depth where infiltration is designed to occur (i.e., to ensure that the depth to water table, depth to bedrock, or karst is defined). The depth to bedrock can be highly variable over small areas, so multiple borings should be conducted in areas having shallow bedrock. | ||
− | For sites with a consistent soil type, a minimum of one soil permeability test per ASTM D3385 or D5093 must be taken per 25,000 square feet of planned permeable pavement surface area. In most cases where the soil type is consistent throughout the site, a single soil test is sufficient for applications less than 25,000 square feet. Additional infiltration tests are required per 25,000 square feet of planned permeable pavement area if the soil borings reveal changes in soil type. The median test result from all infiltration test values should be used as the design infiltration rate. Soil infiltration testing should be conducted within any confining layers that are found within 5 feet of the bottom of a proposed permeable pavement system. | + | For sites with a consistent soil type, a minimum of one soil permeability test per ASTM D3385 or D5093 must be taken per 25,000 square feet of planned permeable pavement surface area. In most cases where the soil type is consistent throughout the site, a single soil test is sufficient for applications less than 25,000 square feet. Additional infiltration tests are required per 25,000 square feet of planned permeable pavement area if the soil borings reveal changes in soil type. The median test result from all infiltration test values should be used as the design infiltration rate. Soil infiltration testing should be conducted within any confining layers that are found within 5 feet of the bottom of a proposed permeable pavement system.--> |
− | |||
− | |||
===Conveyance and overflow=== | ===Conveyance and overflow=== | ||
Line 199: | Line 210: | ||
*Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm. | *Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm. | ||
*Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface. Prior to construction, owners should commit to a vacuuming plan that includes vacuuming frequency and equipment needs. The vacuuming frequency typically depends on the time of year. In the spring, tree buds and seeds necessitate frequent vacuuming. In the fall, tree leaves and acorns necessitate frequent vacuuming. In the summer, vacuuming frequency depends on permeable pavement exposure to organic material from trees and nearby vegetated areas. Vacuum equipment and methods for sediment removal are provided in the section addressing [[Operation and maintenance of permeable pavement|operation and maintenance.]] | *Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface. Prior to construction, owners should commit to a vacuuming plan that includes vacuuming frequency and equipment needs. The vacuuming frequency typically depends on the time of year. In the spring, tree buds and seeds necessitate frequent vacuuming. In the fall, tree leaves and acorns necessitate frequent vacuuming. In the summer, vacuuming frequency depends on permeable pavement exposure to organic material from trees and nearby vegetated areas. Vacuum equipment and methods for sediment removal are provided in the section addressing [[Operation and maintenance of permeable pavement|operation and maintenance.]] | ||
+ | |||
+ | ==Major design elements== | ||
+ | The following design elements apply to permeable pavement. | ||
+ | |||
+ | ===Minimum separation distance=== | ||
+ | {{alert|It is ''REQUIRED'' that infiltration practices be designed with a minimum vertical distance of 3 feet between the bottom of the infiltration practice and the seasonally high water table or bedrock layer. See also Step 8 under the Design procedures section.|alert-danger}} | ||
+ | |||
+ | Local authorities may require greater separation depths. | ||
+ | <p>It is ''HIGHLY RECOMMENDED'' that infiltration practices not be hydraulically connected to structure foundations or pavement, to avoid seepage and frost heave concerns, respectively. If groundwater contamination is a concern, it is ''RECOMMENDED'' that [[Glossary#G|groundwater]] mapping be conducted to determine possible connections to adjacent groundwater wells. </p> | ||
+ | |||
+ | ===Setback distances=== | ||
+ | {{alert|The minimum setback distance from a stormwater infiltration system to a public water-supply well is 100 feet for wells classified as sensitive and 50 feet for all other public supply wells, as ''REQUIRED'' by the Minnesota Department of Health. See [http://www.health.state.mn.us/divs/eh/wells/construction/isolate.html MDH isolation distances] (pollutant or contaminant that may drain into the soil)|alert-danger}} | ||
+ | |||
+ | {{alert|The minimum setbacks in the table below are ''HIGHLY RECOMMENDED'' for the design and location of infiltration practices. It will be necessary to consult local ordinances for further guidance on siting infiltration practices.|alert-warning}} | ||
+ | |||
+ | {{:Summary of horizontal and vertical setback distances}} | ||
+ | |||
+ | '''Karst:''' It is ''HIGHLY RECOMMENDED'' that infiltration practices not be used in active karst formations without adequate geotechnical testing. | ||
+ | |||
+ | '''Wellhead Protection Areas''': It is ''HIGHLY RECOMMENDED'' to review the [https://www.health.state.mn.us/communities/environment/water/swp/index.htm Minnesota Department of Health guidance] on stormwater infiltration in Wellhead Protection Areas. | ||
+ | |||
+ | ===Pretreatment=== | ||
+ | {{alert|It is ''REQUIRED'' that some form of pretreatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.|alert-danger}} | ||
+ | |||
+ | It is ''HIGHLY RECOMMENDED'' that the following pretreatment sizing guidelines be followed: | ||
+ | *Before entering an infiltration practice, stormwater should first enter a pretreatment practice sized to treat a minimum volume of 25 percent of the V<sub>wq</sub>. | ||
+ | *If the infiltration rate of the native soils exceeds 2 inches per hour a pretreatment practice capable of treating a minimum volume of 50 percent of the V<sub>wq</sub> should be installed. | ||
+ | *If the infiltration rate of the native soils exceeds 5 inches per hour a pretreatment practice capable of treating a minimum volume of 100 percent of the V<sub>wq</sub> should be installed. | ||
+ | <p>It is ''HIGHLY RECOMMENDED'' that pretreatment practices be designed such that exit velocities from the pretreatment systems are non-erosive (less than 3 feet per second) and flows are evenly distributed across the width of the practice (e.g., by using a level spreader).</p> | ||
+ | |||
+ | ===Depth=== | ||
+ | The depth of an infiltration practice is a function of the maximum drawdown time and the design infiltration rate. | ||
+ | |||
+ | {{alert|The REQUIRED drawdown time for infiltration practices is 48 hours or less, and so the depth of the practice should be determined accordingly.|alert-danger}} | ||
+ | |||
+ | {{alert|'''Groundwater Protection:''' It is ''REQUIRED'' that runoff from potential stormwater hotspots (PSHs) not be infiltrated unless adequate pretreatment has been provided. Infiltration of runoff from confirmed hotspot areas, industrial areas with exposed significant materials, or vehicle fueling and maintenance areas is ''PROHIBITED''.|alert-danger}} | ||
==Materials specifications== | ==Materials specifications== | ||
Line 204: | Line 251: | ||
{{:Specifications for materials under permeable pavement surface}} | {{:Specifications for materials under permeable pavement surface}} | ||
− | |||
A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance. | A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance. | ||
Line 221: | Line 267: | ||
===Signage=== | ===Signage=== | ||
Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type. | Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type. | ||
− | [[ | + | |
+ | ==Design checklists== | ||
+ | Design checklists have not been developed for the Minnesota Stormwater Manual. Below are links to checklists developed by other organizations. | ||
+ | |||
+ | *[https://secureservercdn.net/166.62.110.232/e6d.7d8.myftpupload.com/wp-content/uploads/2020/07/Permeable-Pavement-Check-List-July2019.pdf Iowa Stormwater Education Partnership, Permeable Paver Design Review Checklist] | ||
+ | *[https://www.slideshare.net/Cartegraph/permeable-pavement-check-list Cartegraph, Permeable Pavement Design Review checklist] | ||
+ | |||
+ | <noinclude> | ||
+ | |||
+ | ==Related articles== | ||
+ | *[[Overview for permeable pavement]] | ||
+ | *[[Types of permeable pavement]] | ||
+ | *[[Design criteria for permeable pavement]] | ||
+ | *[[Construction specifications for permeable pavement]] | ||
+ | <!--[[Construction observations for permeable pavement]]--> | ||
+ | *[[Assessing the performance of permeable pavement]] | ||
+ | *[[Operation and maintenance of permeable pavement]] | ||
+ | *[[Calculating credits for permeable pavement]] | ||
+ | <!--[[Cost-benefit considerations for permeable pavement]]--> | ||
+ | *[[Case studies for permeable pavement]] | ||
+ | *[[Green Infrastructure benefits of permeable pavement]] | ||
+ | *[[Summary of permit requirements for infiltration]] | ||
+ | *[[Permeable pavement photo gallery]] | ||
+ | *[[Additional considerations for permeable pavement]] | ||
+ | *[[Links for permeable pavement]] | ||
+ | <!--*[[External resources for permeable pavement]]--> | ||
+ | *[[References for permeable pavement]] | ||
+ | <!--*[[Supporting material for permeable pavement]]--> | ||
+ | *[[Fact sheets for permeable pavement]] | ||
+ | *[[Requirements, recommendations and information for using permeable pavement BMPs in the MIDS calculator]] | ||
+ | <!--#[[Permeable pavement credits]]--> | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=Permeable_pavement Permeable pavement main page] | ||
+ | |||
+ | [[Category:Level 3 - Best management practices/Specifications and details/Design criteria]] | ||
+ | </noinclude> |
This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed.
Implicit in the design guidance is the fact that many design elements of infiltration and filtration systems can minimize the maintenance burden and maintain pollutant removal efficiency. Key examples include
For more information on design information for individual infiltration and filtration practices, link here.
Permeable pavement is subject to the following design considerations, including benefits and constraints.
For more information on contributing area, see Contributing drainage area to stormwater BMPs.
Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.
The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association (ACPA 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association NRMCA and the Portland Cement Association.
Porous asphalt (Hansen 2008) and permeable interlocking pavements (Smith 2011) use flexible pavement design methods adopted from the 1993 AASHTO Guide for Design of Pavement Structures (AASHTO 1993). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.
There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.
Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:
Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values under saturated conditions used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4 percent, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 pounds per square inch (45 Mega Pascals) per AASHTO T-307. Soils with lower strengths typically require thickened permeable bases or those using cement or asphalt stabilized open-graded aggregates per Mn/DOT Pavement Manual, Section 3-3.01.02 Treated Base.
Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including
These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.
Pedestrian applications can be placed on lower strength soils than those noted.
If the depth of the base/subbase for the full infiltration system is excessive, because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains).
The outflow rate from underdrain(s) can be approximated by
\(q_u = k m\)
where
This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet per day or 8,500 inches per hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet per day per pipe can be used to approximate the average underdrain outflow rate.
Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by
\(d_p = ((0.95 * RP) – (i/2)t_f)) / n\)
where
To estimate the number of underdrain pipes (N), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number.
With full infiltration systems, the maximum allowable drain time (td) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade.
\(t{d} = (d_pn) / (0.5i) \)
The total storage in the permeable pavement system, Vs, is given by
\( V_{s} = A_{p} (d_pn + 0.5it_{f}) \)
where
When calculating the storage volume for compliance with the Construction Stormwater Permit, only the instantaneous storage volume is considered
\( V_{s} = A_{p} (d_pn) \)
Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design.
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
Permeable pavements can be designed to reduce nutrient loadings to the ground or surface waters. The design needs to be specifically designed to capture phosphorus. The permeable pavement system can also be designed to capture nitrogen, although it is important to note that nitrogen and phosphorus each require specific designs to facilitate their removal from stormwater. The following paragraphs describe the design characteristics necessary for the removal of phosphorus and nitrogen.
A study by (Bean, 2007a) showed higher nitrate concentrations in the exfiltrate compared to the infiltrate. Nitrogen reduction capabilities of permeable pavement can be enhanced in partial infiltration designs that detain water in the base/subbase for over 24 hours. This time is required to ensure complete de-nitrification occurs.
PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce phosphorous. Coated aggregates (sometimes called “engineered aggregates”) have an effective life of seven to ten years and target the removal of dissolved phosphorous, according to manufacturer’s literature.
A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction (Erickson 2010). Their effectiveness, initial cost, reduction in flow rates, and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration if continued phosphorus reduction credit is desired. Concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions.
A second approach useful for nutrient and TSS reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification if appropriately designed. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.
Prior to infiltration testing, soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Guidance for conducting infiltration tests and for determining the number of borings can be found here.
Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that accomplish this.
The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40 percent per ASTM C29. Reservoir base layers for pervious concrete are typically washed AASHTO No. 57 stone and those for porous asphalt are AASHTO No. 2, 3, or 5. PICP uses AASHTO No. 2, 3, or 4 stone.
If exposed to vehicular loads, all crushed stone should be Minnesota Department of Transportation (MnDOT) Class A or B coarse aggregate, minimum 80 percent crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro, or similar material. The maximum Los Angeles Rattler Loss should be 35 percent per AASHTO T-96 and no greater loss than 10 percent per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the MnDOT Laboratory Manual (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.
Underdrains install quickly when placed on or in the soil subgrade, surrounded by stone base materials. The outflow portion at the end is not perforated and is raised to a designed height that allows for some water detention prior to outflow. Placement at this elevation also protects the pipe with aggregate during base compaction. For permeable pavement bases/subbases using 2 or 3 inch maximum size aggregates, underdrain pipes with them should be surrounded with at least 4 inches of ASTM No. 57 (maximum 1 inch size aggregate) to protect the pipes during compaction. An underdrain(s) can also be installed and capped at a downstream structure as an option for future use if maintenance observations indicate a reduction in the soil permeability.
Proper maintenance of permeable pavement is crucial for ensuring its longevity and functionality. Some portions of the maintenance plan require planning during the design stages. These items are noted below.
The following design elements apply to permeable pavement.
Local authorities may require greater separation depths.
It is HIGHLY RECOMMENDED that infiltration practices not be hydraulically connected to structure foundations or pavement, to avoid seepage and frost heave concerns, respectively. If groundwater contamination is a concern, it is RECOMMENDED that groundwater mapping be conducted to determine possible connections to adjacent groundwater wells.
Required and recommended minimum vertical and horizontal separation distances. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is above-ground, the distance is measured from the edge of the BMP to the structure. If the structure is underground, the vertical separation distance represents the distance from the point of infiltration through the bottom of the system to the structure, while the horizontal separation (often called setback) distance is the shortest distance from the edge of the system to the structure.
Link to this table
Structure | Distance (feet) | Requirement or recommendation | Note(s) | |
---|---|---|---|---|
Vertical | Saturated soil | 3 | Requirement1 | |
Bedrock | 3 | Requirement1 | ||
Horizontal | Public supply well | 100 for sensitive wells; 50 for others3 | Requirement | |
Building/structure/property line2 | 10 | Recommended | ||
Surface water | none unless local requirements exist | If nearby stream is impaired for chloride, see [2] | ||
Septic system | 35 | Recommended | ||
Contaminated soil/groundwater | No specific distance. Infiltration must not mobilize contaminants. | |||
Slope | 200 | Recommended | from toe of slope >= 20% | |
Karst | 1000 up-gradient 100 down-gradient | Requirement1 | active karst |
1 Required under the Construction Stormwater General Permit
2 Minimum with slopes directed away from the building
3If treating an average of 10,000 gallons per day; otherwise separation distance is 300 feet
Karst: It is HIGHLY RECOMMENDED that infiltration practices not be used in active karst formations without adequate geotechnical testing.
Wellhead Protection Areas: It is HIGHLY RECOMMENDED to review the Minnesota Department of Health guidance on stormwater infiltration in Wellhead Protection Areas.
It is HIGHLY RECOMMENDED that the following pretreatment sizing guidelines be followed:
It is HIGHLY RECOMMENDED that pretreatment practices be designed such that exit velocities from the pretreatment systems are non-erosive (less than 3 feet per second) and flows are evenly distributed across the width of the practice (e.g., by using a level spreader).
The depth of an infiltration practice is a function of the maximum drawdown time and the design infiltration rate.
Permeable pavement material specifications vary according to the specific pavement product selected. The following table describes general material specifications for the components installed beneath the permeable pavement. Note that the size of stone materials used in the reservoir and filter layers differ depending whether the system is pervious concrete, porous asphalt or permeable interlocking concrete pavement.
Summary of specifications for materials under the pavement surface. For more information, see the footnote (1). Reference or links to any specific commercial product, process, or service by trade name, trademark, service mark, manufacturer, or otherwise does not constitute or imply endorsement, recommendation, or favoring by the Minnesota Pollution Control Agency.
Link to this table
Bedding/choker layer |
|
Washed free of fines |
Reservoir Layer |
|
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4. |
Underdrain (optional) | Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system. | |
Filter Layer (optional) | Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. | The Filter Layer is REQUIRED if using the permeable pavement system to meet permit requirements. The sand layer may require a choker layer on surface to provide transition to base layerstone. |
Geotextile(optional) | Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile. | |
Impermeable Liner | Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable. | |
Observation Well | Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers). |
1for additional information on materials referenced in this table (e.g. stone dimensions), see the following links:
A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.
This table shows summarizes specifications for permeable pavement.
Link to this table.
Permeable Pavers | Surface open area: typically 5% to 15%; minimum thickness: 3 inches for vehicles; minimum compressive strength: 8,000 psi | Concrete pavers conform to ASTM C936 and clay pavers C1272. Reservoir layer required to support the structural load. |
Pervious Concrete |
|
May not require a reservoir layer to support loads, but a layer is required for storage/infiltration. In no case should plain steel rebar or mesh be used in pervious concrete as this invites corrosion. |
Porous Asphalt |
|
Reservoir layer contributes to structural load support. |
There are additional design considerations for permeable pavement, including use of permeable pavement in karst terrain and winter considerations.
A detailed geotechnical investigation may be required for any kind of stormwater design in karst terrain. Permeable pavements, as with other infiltration practices, are not recommended at sites with known karst features as they can cause the formation of sinkholes and can provide a direct link for stormwater to access groundwater without providing any treatment.
Plowed snow piles should be located in adjacent grassy areas so that sediments and pollutants in snowmelt are partially treated before they reach all permeable pavements. Sand is not recommended for winter traction over permeable pavements. If sand is applied, it must be removed with vacuum cleaning in the spring. Traction can be accomplished on PICP using jointing stone materials, some of which will find its way into the joints by springtime. A significant winter advantage of permeable pavements is that they require less deicing materials than their impervious counterparts. Use of deicing material on permeable pavement is therefore not recommended.
Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type.
Design checklists have not been developed for the Minnesota Stormwater Manual. Below are links to checklists developed by other organizations.