Line 16: | Line 16: | ||
*Updates on BMPs included in the compliance schedule submitted by the permittee as part of the application for the 2020 MS4 general permit | *Updates on BMPs included in the compliance schedule submitted by the permittee as part of the application for the 2020 MS4 general permit | ||
*Implemented BMPs for each applicable WLA since the Total Maximum Daily Load (TMDL) baseline year, including: | *Implemented BMPs for each applicable WLA since the Total Maximum Daily Load (TMDL) baseline year, including: | ||
− | **BMP category, BMP type, and BMP status (see TMDL annual report webpage for more information) | + | **BMP category, BMP type, and BMP status <!--(see TMDL annual report webpage for more information)--> |
*For constructed basins, filtration, infiltration, stormwater reuse, and street sweeping BMPs: | *For constructed basins, filtration, infiltration, stormwater reuse, and street sweeping BMPs: | ||
**Location (i.e., geographic coordinates) | **Location (i.e., geographic coordinates) | ||
Line 30: | Line 30: | ||
**Status of inventory and prioritization plan | **Status of inventory and prioritization plan | ||
**[[Guidance for meeting bacteria TMDL MS4 permit requirements]] | **[[Guidance for meeting bacteria TMDL MS4 permit requirements]] | ||
+ | |||
+ | ==Anticipated changes== | ||
+ | If you submitted TMDL Annual Reports under the 2013 MS4 General Permit, there will be some changes to the BMP categories and types. | ||
+ | The BMP list will be finalized by the end of January and will be posted here. | ||
+ | |||
+ | Refer to your submitted Custom TMDL Application if you are unsure of which TMDL WLAs need to be reported on. Contact [mailto:anna.bosch@state.mn.us Anna Bosch] with questions. | ||
For more information about the non-TMDL portion of the MS4 annual report, visit the [https://stormwater.pca.state.mn.us/index.php/MS4_Annual_Report MS4 annual report webpage.] | For more information about the non-TMDL portion of the MS4 annual report, visit the [https://stormwater.pca.state.mn.us/index.php/MS4_Annual_Report MS4 annual report webpage.] |
If you (an MS4 Permittee) are assigned one or more Wasteload Allocation (WLA) in a Total Maximum Daily Load (TMDL) that was approved by the United States Environmental Protection Agency (USEPA) prior to November 16, 2020, and were not meeting the WLA(s) when you applied for permit coverage, you must complete the TMDL Annual Report to demonstrate progress toward meeting the WLA(s).
The MPCA is in the process of developing a new e-service for both the MS4 annual report and the TMDL annual report. There will be no TMDL Annual Report submission in calendar year 2023. Permittees will be expected to report on 2022 activities once the e-service is operational.
Until the e-service is operational, permittees should keep track of the following:
If you submitted TMDL Annual Reports under the 2013 MS4 General Permit, there will be some changes to the BMP categories and types. The BMP list will be finalized by the end of January and will be posted here.
Refer to your submitted Custom TMDL Application if you are unsure of which TMDL WLAs need to be reported on. Contact Anna Bosch with questions.
For more information about the non-TMDL portion of the MS4 annual report, visit the MS4 annual report webpage.