m (→Box 20) |
m (→Links) |
||
(175 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | == | + | [[File:mids logo.jpg|300px|thumb|alt=image of Minimal Impact Design Standards logo|For more information on the Design Sequence Flow Chart see the following:<br> |
+ | *[[Flexible treatment options]]<br> | ||
+ | *[http://stormwater.pca.state.mn.us/index.php/File:Final_MIDS_Flow_chart.pdf MIDS flow chart]<br> | ||
+ | *[[List of flow chart questions|List of steps in flow chart]]]] | ||
+ | [[File:Wiki flow chart sequence.png|250px|thumb|alt=image of flow chart used for wiki|<font size=3>Click on image to enlarge. Note the steps in this image may differ from the steps described on this page.</font size>]] | ||
+ | |||
+ | A flow chart was developed to determine the appropriate performance goal or Flexible Treatment Option for a new development, redevelopment, or linear site. You may access a pdf version of the flow chart ([[File:Final MIDS Flow chart.pdf]]) or follow the flow chart through the sequence of questions starting at Step 1 below. If you would like a copy of the flowchart in Visio, so that you can edit it, please contact us. | ||
+ | |||
+ | The wiki version of the flow chart, which starts below at Step 1, takes you through a series of questions and steps to ultimately arrive at a performance goal. The wiki version does not necessarily take you through each step nor does it completely match the pdf version of the flow chart. However, the sequence of questions and answers takes you to the same result. | ||
+ | |||
+ | Two advantages of using the wiki version on this page are that 1) the path through questions and answers is straightforward and 2) there are links, discussions, and images to assist you in answering questions. | ||
+ | |||
+ | ==Step 1== | ||
Did you gather the site information necessary to proceed through the flow chart? | Did you gather the site information necessary to proceed through the flow chart? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_3 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_2 No or Unsure] |
− | == | + | ==Step 2== |
Prior to using the flow chart, gather the following preliminary information. | Prior to using the flow chart, gather the following preliminary information. | ||
Line 13: | Line 25: | ||
===Conduct site review=== | ===Conduct site review=== | ||
− | *[ | + | *[https://earthexplorer.usgs.gov/ Aerial photos] and [https://www.usgs.gov/programs/national-geospatial-program/topographic-maps topographic maps] |
− | *County [ | + | *County [https://www.nrcs.usda.gov/conservation-basics/natural-resource-concerns/soil/soil-surveys-by-state soil surveys] and other soil information as available |
*[http://www.dnr.state.mn.us/waters/groundwater_section/mapping/status.html County Geologic Atlas] | *[http://www.dnr.state.mn.us/waters/groundwater_section/mapping/status.html County Geologic Atlas] | ||
*Local groundwater levels | *Local groundwater levels | ||
− | *[ | + | *[https://www.health.state.mn.us/communities/environment/water/swp/mapviewer.html DWSMA] and [https://www.health.state.mn.us/communities/environment/water/swp/index.htm Wellhead Protection maps] |
*[http://www.fema.gov/ FEMA] and [http://www.dnr.state.mn.us/waters/watermgmt_section/floodplain/fema_firms.html local floodplain maps] | *[http://www.fema.gov/ FEMA] and [http://www.dnr.state.mn.us/waters/watermgmt_section/floodplain/fema_firms.html local floodplain maps] | ||
*Soil borings and site survey | *Soil borings and site survey | ||
*MPCA listing of [http://www.pca.state.mn.us/index.php/data/wimn-whats-in-my-neighborhood/whats-in-my-neighborhood.html potentially contaminated sites] | *MPCA listing of [http://www.pca.state.mn.us/index.php/data/wimn-whats-in-my-neighborhood/whats-in-my-neighborhood.html potentially contaminated sites] | ||
− | *[ | + | *[https://www.gleassociates.com/phase-i-versus-phase-ii-environmental-site-assessments/#:~:text=Phase%20I%20vs%20Phase%20II%20Site%20Assessments%E2%80%94Side%20by%20Side&text=A%20Phase%20I%20primarily%20assesses,contamination%20is%20in%20fact%20present. Phase 1 and 2 Environmental Site Assessments] |
*[http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/minnesotas-impaired-waters-and-total-maximum-daily-loads-tmdls.html TMDLs] and local [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/impaired-waters-list.html water quality standards] | *[http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/minnesotas-impaired-waters-and-total-maximum-daily-loads-tmdls.html TMDLs] and local [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/impaired-waters-list.html water quality standards] | ||
− | *[ | + | *[https://bwsr.state.mn.us/wetland-delineation Wetland delineations], [https://bwsr.state.mn.us/sites/default/files/2018-12/WETLANDS_Function_MnRAM_Comprehensive_Guidance.pdf MNRAM assessments], and [https://bwsr.state.mn.us/sites/default/files/2018-12/WETLANDS_Function_MnRAM_Wetland_Mgmt_Classification_Guidance.pdf wetland classifications] |
*Proposed conditions, conceptual/preliminary site design | *Proposed conditions, conceptual/preliminary site design | ||
*Local zoning and land use requirements/ordinances, including stormwater rate control requirements | *Local zoning and land use requirements/ordinances, including stormwater rate control requirements | ||
Line 30: | Line 42: | ||
<font size = 5> | <font size = 5> | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_3 '''PROCEED TO THE NEXT STEP'''] |
</font size> | </font size> | ||
− | == | + | ==Step 3== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | [[File:Impermeable surfaces.png|thumb|150px|alt=photo of impervious surfaces|<font size=3>Impervious surfaces includes roads, roofs, sidewalks, and parking lots.</font size>]] | ||
+ | |||
*New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces | *New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces | ||
*Linear projects: Retain on site the larger of 1.1 inches from all new or 0.55 inches from all new and fully reconstructed impervious surfaces | *Linear projects: Retain on site the larger of 1.1 inches from all new or 0.55 inches from all new and fully reconstructed impervious surfaces | ||
<font size = 5> | <font size = 5> | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_4 '''PROCEED TO THE FIRST QUESTION'''] |
</font size> | </font size> | ||
Line 44: | Line 59: | ||
*[[Performance goals for new development, re-development and linear projects]] | *[[Performance goals for new development, re-development and linear projects]] | ||
*For background and derivation of the performance goals, see technical documents and presentations on the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS website]. We provide links to some of these documents and presentations below. | *For background and derivation of the performance goals, see technical documents and presentations on the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/stormwater-minimal-impact-design-standards-mids.html MIDS website]. We provide links to some of these documents and presentations below. | ||
− | **[ | + | **[https://stormwater.pca.state.mn.us/index.php?title=File:P-gen3-12i.pdf Preliminary Performance Goal Alternatives Evaluation] |
− | **[ | + | **[https://stormwater.pca.state.mn.us/index.php?title=File:Assessment_MIDS_performance_goal_alternatives.pdf Assessment of MIDS Performance Goal Alternatives: Runoff Volumes, Runoff Rates, and Pollutant Removal Efficiencies] |
− | **[ | + | **[https://stormwater.pca.state.mn.us/index.php?title=File:P-gen3-13a.pdf Performance goal review] |
− | + | ||
+ | ==Step 4== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Does project create one acre or more of new and/or fully reconstructed impervious surfaces? | Does project create one acre or more of new and/or fully reconstructed impervious surfaces? | ||
− | *[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | *[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_6 Yes] |
+ | *[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_5 No] | ||
− | + | '''PREVIOUS QUESTION and ANSWER''': The [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_3 previous question] defined the performance goals. | |
− | + | ==Step 5== | |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
− | + | <font size=3><span style="color:red"> | |
− | <font size= | ||
'''MIDS PERFORMANCE GOAL DOES NOT APPLY''' | '''MIDS PERFORMANCE GOAL DOES NOT APPLY''' | ||
</span></font size><br> | </span></font size><br> | ||
+ | |||
The project creates less than 1 acre of impervious surface. | The project creates less than 1 acre of impervious surface. | ||
− | + | You have completed the flow chart. | |
− | [ | + | |
+ | Return to [https://stormwater.pca.state.mn.us/index.php?title=Minimal_Impact_Design_Standards Minimal Impact Design Standards main page] | ||
+ | |||
+ | Return to [[Design Sequence Flowchart-Flexible treatment options]] | ||
− | [[File: | + | ==Step 6== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | [[File:Linear projects.png|300px|thumb|alt=image of linear projects|<font size=3>Example of a linear project where site constraints likely do not exist (left) and do exist (right)</font size>]] | ||
Is the project linear? | Is the project linear? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_7 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_11 No] |
− | PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes | + | '''PREVIOUS QUESTION and ANSWER''': Does project create one acre or more of new and/or fully reconstructed impervious surfaces? '''Answer''' - Yes |
− | == | + | ==Step 7== |
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? | Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_8 Yes] |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_11 No] | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart | + | ==Step 8== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Is Flexible Treatment Option (FTO) 2 feasible? | Is Flexible Treatment Option (FTO) 2 feasible? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_57 Yes] |
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] |
− | PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? '''Answer''': Yes | + | '''PREVIOUS QUESTION and ANSWER''': Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? '''Answer''': Yes |
− | == | + | ==Step 9== |
− | [[File:stop sign.png| | + | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flowchart</center>]] |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | <font size= | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | '''Select Flexible treatment Option 2''' | ||
− | </font size> | ||
− | |||
− | |||
− | |||
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
#Remove 60 percent of the annual total phosphorus load, and | #Remove 60 percent of the annual total phosphorus load, and | ||
#Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
− | + | Provide the following information | |
+ | *Documentation of offsite runon to project area | ||
+ | *Documentation of lack of right-of-way | ||
− | + | '''PREVIOUS STEP''': It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made. | |
− | |||
− | === | + | ==Step 10== |
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible Treatment Option 3'''</font size> | ||
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference: | Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference: | ||
#Locations that yield benefits to the same receiving water that receives runoff from the original construction activity. | #Locations that yield benefits to the same receiving water that receives runoff from the original construction activity. | ||
Line 121: | Line 149: | ||
#Locations anywhere within the local authority's jurisdiction. | #Locations anywhere within the local authority's jurisdiction. | ||
− | PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible. | + | '''PREVIOUS QUESTION''': It was determined that Flexible Treatment Option 2 is not feasible. |
+ | |||
+ | ==Step 11== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Are there zoning and land use requirements that make the Performance Goal not feasible? | Are there zoning and land use requirements that make the Performance Goal not feasible? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_12 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_15 No] |
− | PREVIOUS QUESTION and ANSWER: | + | '''PREVIOUS QUESTION and ANSWER''': |
*Is the project linear? Answer: No | *Is the project linear? Answer: No | ||
or | or | ||
*Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? Answer: No | *Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements? Answer: No | ||
− | == | + | ==Step 12== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
Is BMP relocation feasible | Is BMP relocation feasible | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_15 Yes] |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_13 No] | ||
− | + | '''PREVIOUS QUESTION and ANSWER''': Are there zoning and land use requirements that make the Performance Goal not feasible? '''Answer''': Yes | |
− | + | ==Step 13== | |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Is Flexible Treatment Option (FTO) 1 feasible? | Is Flexible Treatment Option (FTO) 1 feasible? | ||
− | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_61 Yes] | |
− | |||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | ||
− | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_14 No] | |
− | + | :'''Flexible Treatment Option 1 (FTO #1)''' | |
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
#Achieve at least 0.55 inch volume reduction goal, and | #Achieve at least 0.55 inch volume reduction goal, and | ||
#Remove 75 percent of the annual total phosphorus load, and | #Remove 75 percent of the annual total phosphorus load, and | ||
− | #Options considered and presented shall examine the merits of | + | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site |
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation feasible - '''Answer''': No | ||
+ | |||
+ | ==Step 14== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Is Flexible Treatment Option (FTO) 2 feasible? | Is Flexible Treatment Option (FTO) 2 feasible? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_54 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] |
− | + | :'''Flexible Treatment Option 2 (FTO #2)''' | |
− | |||
Applicant attempts to comply with the following conditions: | Applicant attempts to comply with the following conditions: | ||
#Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
Line 174: | Line 209: | ||
#options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | #options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
− | == | + | '''PREVIOUS QUESTION and ANSWER''': Is Flexible Treatment Option (FTO) 1 feasible? - '''Answer''': No |
+ | |||
+ | ==Step 15== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | [[File:Minnesota DWSMAs.png|thumb|300px|alt=map of DWSMAs in Minnesota|<font size=3>Map illustrating location of [https://www.health.state.mn.us/communities/environment/water/swp/mapviewer.html Drinking Water Supply Management Areas] (DWSMAs) in Minnesota.</font size>]] | ||
+ | |||
Is the site located in a DWSMA (Drinking Water Supply Management Area), wellhead protection area, or within 200 feet of a drinking water well? | Is the site located in a DWSMA (Drinking Water Supply Management Area), wellhead protection area, or within 200 feet of a drinking water well? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_16 Yes] |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_17 No] | ||
+ | |||
+ | ===Discussion=== | ||
+ | A drinking water supply management area (DWSMA) is the Minnesota Department of Health (MDH) approved surface and subsurface area surrounding a public water supply well that completely contains the scientifically calculated [[Glossary#W|wellhead protection area]] and is managed by the entity identified in a wellhead protection plan. The boundaries of the drinking water supply management area are delineated by identifiable physical features, landmarks or political and administrative boundaries. | ||
+ | |||
+ | ===Links=== | ||
+ | *The Minnesota Department of Health maintains maps, shapefiles and other information on source water protection in Minnesota, including maps of Drinking Water Supply Management Areas (DWSMAs). | ||
+ | *[https://www.health.state.mn.us/communities/environment/water/swp/index.htm Minnesota Department of Health Source Water Protection] main page | ||
+ | *[http://water.epa.gov/infrastructure/drinkingwater/sourcewater/protection/index.cfm United States Environmental Protection Agency] Source Water protection page | ||
+ | *[https://stormwater.pca.state.mn.us/images/3/3a/Evaluating_Proposed_Stormwater_Infiltration_Projects_in_Vulnerable_Wellhead_Protection_Areas.pdf Evaluating Proposed Stormwater Infiltration Projects in Vulnerable Wellhead Protection Areas] | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart | + | '''PREVIOUS QUESTION and ANSWER''' |
+ | *Are there zoning and land use requirements that make the Performance Goal not feasible? - '''Answer''': No | ||
+ | or | ||
+ | *Is BMP relocation feasible? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 16== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? | Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_17 Yes] |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_58 No] | ||
− | + | '''PREVIOUS QUESTION and ANSWER''': Is the site located in a DWSMA, Wellhead Protection Area, or within 200 feet of a drinking water well? - Answer: Yes | |
− | + | ==Step 17== | |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? | Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? | ||
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_18 Yes] |
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_21 No] |
− | PREVIOUS QUESTION and ANSWER | + | '''PREVIOUS QUESTION and ANSWER''' |
*Is the site located in a DWSMA, wellhead protection area, or within 200 feet of a drinking water well? - '''Answer''': No | *Is the site located in a DWSMA, wellhead protection area, or within 200 feet of a drinking water well? - '''Answer''': No | ||
or | or | ||
*Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? - '''Answer''': Yes | *Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? - '''Answer''': Yes | ||
− | == | + | ==Step 18== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
Is BMP relocation feasible? | Is BMP relocation feasible? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_21 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_19 No] |
− | PREVIOUS QUESTION and ANSWER: - Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? - '''Answer''': Yes | + | '''PREVIOUS QUESTION and ANSWER''': - Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? - '''Answer''': Yes |
+ | |||
+ | ==Step 19== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Is Flexible Treatment option (FTO) 1 feasible? | Is Flexible Treatment option (FTO) 1 feasible? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_62 Yes] |
− | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart# | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_20 No] |
− | PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible? - '''Answer''': No | + | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation feasible? - '''Answer''': No |
+ | |||
+ | ==Step 20== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | |||
Is Flexible Treatment Option (FTO) 2 feasible? | Is Flexible Treatment Option (FTO) 2 feasible? | ||
− | [ | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_54 Yes] |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is Flexible Treatment Option (FTO) 1 feasible? - '''Answer''': No | ||
+ | |||
+ | ===Flexible Treatment Option 2 (FTO #2)=== | ||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | ==Step 21== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Is karst present on the site? | |
− | PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_22 Yes] |
− | </font size> | + | |
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_26 No] | ||
+ | |||
+ | If you are unsure, we recommend you review the guidance for karst in this manual. To retain your place in this flowchart, either open the [http://stormwater.pca.state.mn.us/index.php/Karst karst guidance] page in a new tab (right click on the link and select ''Open Link in New Tab''), use the back arrow after visiting the karst guidance page, or use the Breadcrumbs at the top of the page. | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': | ||
+ | *Are there existing or proposed structures or infrastructure that make the performance goal not feasible? - '''Answer''': No | ||
+ | or | ||
+ | *Is BMP relocation feasible? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 22== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Can a local unit of government (LGU) provide a higher level of [[Karst#Investigation for karst areas|engineering review]] to ensure a functioning system that prevents adverse impacts to groundwater? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_26 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_23 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is karst present on the site? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 23== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is BMP relocation onsite to a location without karst feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_26 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_24 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Can a local unit of government (LGU) provide a higher level of [[Karst#Investigation for karst areas|engineering review]] to ensure a functioning system that prevents adverse impacts to groundwater? - '''Answer''': No | ||
+ | |||
+ | ==Step 24== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is Flexible Treatment Option (FTO) 2 feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_25 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation onsite to a location without karst feasible? - '''Answer''': No | ||
+ | |||
+ | ==Step 25== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *Provide soil borings or report from a professional geologist or geotechnical engineer | ||
===Flexible Treatment Option 2 (FTO #2)=== | ===Flexible Treatment Option 2 (FTO #2)=== | ||
Line 236: | Line 370: | ||
#options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | #options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
− | == | + | '''PREVIOUS STEP''': It was determined that karst is present within 1000 feet of the site and the BMP cannot be reloacted so that it is more than 1000 feet from karst |
+ | |||
+ | ==Step 26== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is shallow groundwater or shallow bedrock present on site? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_27 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_33 No] | ||
+ | |||
+ | If you are unsure, we recommend you review the guidance for shallow groundwater in this manual. To retain your place in this flowchart, either open the [http://stormwater.pca.state.mn.us/index.php/Shallow_groundwater shallow groundwater guidance] page in a new tab (right click on the link and select ''Open Link in New Tab''), use the back arrow after visiting the shallow groundwater guidance page, or use the Breadcrumbs at the top of the page. | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': | ||
+ | *Is karst present on the site? - '''Answer''': No | ||
+ | or | ||
+ | *Can a local unit of government (LGU) provide a higher level of [[Karst#Investigation for karst areas|engineering review]] to ensure a functioning system that prevents adverse impacts to groundwater?- '''Answer''': Yes | ||
+ | or | ||
+ | *Is BMP relocation onsite to a location without karst feasible? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 27== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Conduct a detailed site investigation of [[Shallow groundwater|shallow groundwater]] or [[Shallow soils and shallow depth to bedrock#Investigation for shallow bedrock areas|shallow bedrock]] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_28 Next question] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is shallow groundwater or shallow bedrock present on site? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 28== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is there more than 3 feet of soil depth from bottom of BMP to bedrock or groundwater (more than 10 feet is preferred)? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_33 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_29 No] | ||
+ | |||
+ | '''PREVIOUS STEP''': You were asked to conduct a detailed site investigation of [[Shallow groundwater|shallow groundwater]] or [[Shallow soils and shallow depth to bedrock#Investigation for shallow bedrock areas|shallow bedrock]] | ||
+ | |||
+ | ==Step 29== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is BMP relocation onsite to avoid shallow groundwater or shallow bedrock feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_33 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_30 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is there more than 3 feet of soil depth from the bottom on the BMP to bedrock and groundwater (more than 10 feet is preferred)? - '''Answer''': No | ||
+ | |||
+ | ==Step 30== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Can the BMP be raised? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_32 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_66 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation onsite to avoid shallow groundwater and shallow bedrock feasible? - | ||
+ | Answer: No | ||
+ | |||
+ | ==Step 31== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
− | + | Applicant attempts to comply with the following conditions: | |
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
− | + | Provide the following information | |
+ | *Soil borings or report from a professional geologist or geotechnical engineer | ||
− | + | '''PREVIOUS STEP''': It was determined that shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater. | |
− | == | + | ==Step 32== |
+ | Raise BMP enough to ensure 3 feet (preferably 10 feet) of soil between bottom of BMP and top of bedrock and groundwater | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_33 Proceed to Next Step] |
− | + | '''PREVIOUS QUESTION and ANSWER''': Can the BMP be raised? '''Answer''' - Yes | |
− | == | + | ==Step 33== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | == | + | Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff? |
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_34 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_36 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': | ||
+ | *Is shallow groundwater or shallow bedrock present on the site? - '''Answer''': No | ||
+ | or | ||
+ | *Is there more than 3 feet of soil depth from the bottom of the BMP to bedrock and/or groundwater? - '''Answer''': Yes | ||
+ | or | ||
+ | *Is BMP relocation onsite to avoid shallow bedrock and/or shallow groundwater feasible? - '''Answer''': Yes | ||
+ | or | ||
+ | *Can the BMP be raised? - '''Answer''': Yes | ||
− | == | + | ==Step 34== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Can hotspot or contamination be isolated or remediated to mitigate risk of increased contamination? | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_36 Yes] |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_35 No] |
− | + | '''PREVIOUS QUESTION and ANSWER''': Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff? - '''Answer''': Yes | |
− | == | + | ==Step 35== |
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | = | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | + | Applicant attempts to comply with the following conditions: | |
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
− | + | Provide the following information | |
+ | *Provide Phase I or II ESAs or other documentation of potential contamination or hotspot runoff | ||
+ | *Provide documentation of extent of contamination and remediation alternatives considered | ||
− | + | '''PREVIOUS STEP''': It was determined that contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated. | |
− | == | + | ==Step 36== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Are there very low infiltrating soils (less than 0.2 inches per hour) on site? | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_37 Yes] |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_42 No] |
− | + | '''PREVIOUS QUESTION and ANSWER''': | |
+ | *Is there presence of contaminated soils, contaminated groundwater, or hotspot runoff on the site? - '''Answer''': No | ||
+ | or | ||
+ | *Can hotspot or contamination be isolated or remediated? - '''Answer''': Yes | ||
− | == | + | ==Step 37== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Is BMP relocation onsite to a higher-infiltrating location feasible? | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_42 Yes] |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_38 No] |
− | + | '''PREVIOUS QUESTION and ANSWER''': Are there very low infiltrating soils (less than 0.2 inches per hour) on site? - '''Answer''': Yes | |
− | == | + | ==Step 38== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)? | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_42 Yes] |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_39 No] |
− | + | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation onsite to a higher-infiltrating location feasible? - '''Answer''': No | |
− | == | + | ==Step 39== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Provide [[Soils with low infiltration capacity#Investigation for low infiltration capacity soils|soil boring or infiltration test results]] documenting low-infiltration soils. | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_40 Next question] |
− | + | '''PREVIOUS QUESTION and ANSWER''': Can BMP be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)? '''Answer''': No | |
− | == | + | ==Step 40== |
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | + | Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours? | |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_59 Yes] |
− | = | + | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_41 No] |
− | + | '''PREVIOUS STEP''': You were asked to provide [[Soils with low infiltration capacity#Investigation for low infiltration capacity soils|soil boring or infiltration test results]] documenting low-infiltration soils. | |
− | == | + | ==Step 41== |
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
− | = | + | <font size=4>'''Select Flexible treatment Option 2'''</font size> |
− | ==PREVIOUS QUESTION and ANSWER:== | + | Applicant attempts to comply with the following conditions: |
− | + | #No infiltration practices allowed, and | |
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *Provide soil boring or infiltration test results documenting low-infiltration soils | ||
+ | |||
+ | '''PREVIOUS STEP''': It was determined that soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
+ | |||
+ | ==Step 42== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Are there very high infiltrating soils (more than 8 inches per hour) on site? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_43 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_46 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': | ||
+ | *Are there very low infiltrating soils (less than 0.2 inches per hour) present on site? - '''Answer''': No | ||
+ | or | ||
+ | *Is BMP relocation onsite to a higher-infiltrating location feasible? - '''Answer''': Yes | ||
+ | or | ||
+ | *Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 43== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is BMP relocation onsite to a lower-infiltrating location feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_46 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_44 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Are there very high infiltrating soils (more than 8 inches per hour) on site? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 44== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Can subgrade be modified to slow the rate of infiltration to less than 8 inches per hour? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_46 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_45 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is BMP relocation onsite to a lower-infiltrating location feasible? - '''Answer''': No | ||
+ | |||
+ | ==Step 45== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *Provide soil boring or infiltration test results documenting high-infiltration soils | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': It was determined that soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
+ | |||
+ | ==Step 46== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_47 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_51 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Are there very high infiltrating soils (greater than 8 inches per hour) present on site)? - '''Answer''': No | ||
+ | or | ||
+ | *Is BMP relocation onsite to a lower infiltrating location feasible? - '''Answer''': Yes | ||
or | or | ||
− | *Is BMP relocation feasible? - '''Answer''': Yes | + | *Can subgrade be modified to slow the rate of infiltration? - '''Answer''': Yes |
+ | |||
+ | ==Step 47== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Can the BMP be relocated to avoid adverse hydrologic impacts? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_51 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_48 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 48== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Would BMPs accomodating Flexible treatment option 1 avoid adverse hydrologic impacts? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_50 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_49 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Can the BMP be relocated to avoid adverse hydrologic impacts? - '''Answer''': No | ||
+ | |||
+ | ==Step 49== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *provide report documenting potential hydrologic impacts from infiltration on the site, prepared by a registered engineer, hydrologist, or wetland specialist | ||
+ | |||
+ | ==Step 50== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | :<font size=4>'''Select Flexible Treatment Option 1 (FTO #1)'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions | ||
+ | #Achieve at least 0.55 inch volume reduction goal, and | ||
+ | #Remove 75 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of reloacting project elements to address varying soil conditions and other constraints across the site | ||
+ | |||
+ | Additional considerations | ||
+ | *Maximize infiltration BMPs to treat more than 0.55 inch goal if possible | ||
+ | *If Flexible Treatment Option 1 was determined based on presence of low infiltrating soils, provide soil boring or infiltration test results documenting low-infiltrating soils | ||
+ | *if Flexible Treatment Option 1 was determined based on presence of adverse surface water hydrologic impacts from infiltration practices, provide a report that documents the potential hydrologic impacts from infiltration on the site, prepared by a registered engineer, hydrologist, or wetlands specialist. | ||
+ | |||
+ | ==Step 51== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Complete design using the following performance goals'''</font size> | ||
+ | |||
+ | New development projects | ||
+ | *1.1 inches from new impervious surfaces | ||
+ | *Redevelopment projects - 1.1 inches from new impervious surfaces | ||
+ | Linear projects | ||
+ | *0.55 inches of runoff from the new and fully reconstructed impervious surfaces | ||
+ | *1.1 inches of runoff from the net increase in impervious area | ||
+ | |||
+ | ==Step 52== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *Zoning and land use requirements make [[Flexible treatment options#Flexible Treatment Option 2 (FTO #2)|Flexible Treatment Option 2]] not feasible | ||
+ | and | ||
+ | *The BMP cannot be relocated to accommodate zoning and land use restrictions | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_53 No] | ||
+ | |||
+ | ==Step 53== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *There are existing or proposed structures or infrastructure that make [[Flexible treatment options#Flexible Treatment Option 2 (FTO #2)|Flexible Treatment Option 2]] not feasible | ||
+ | and | ||
+ | *BMP relocation is not feasible | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_63 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements. | ||
+ | |||
+ | ==Step 54== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
+ | *The site is located within a DWSMA, wellhead protection area, or within 200 feet of a drinking water well, and infiltration is not allowed by the LGU | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_56 Yes] | ||
+ | |||
+ | *Karst is present within 1000 feet of the site and the BMP cannot be relocated so that it is more than 1000 feet from karst | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_25 Yes] | ||
+ | |||
+ | *Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_31 Yes] | ||
+ | |||
+ | *Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_35 Yes] | ||
+ | |||
+ | *Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_41 Yes] | ||
+ | |||
+ | *Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_45 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_63 No] | ||
+ | |||
+ | ==Step 55== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *There are existing or proposed structures or infrastructure that make FTO 2 not feasible | ||
+ | and | ||
+ | *BMP relocation is not feasible | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_56 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': | ||
+ | You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements. | ||
+ | |||
+ | ==Step 56== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | *No infiltration practices allowed | ||
+ | *Explore non-infiltration volume reduction practices | ||
+ | |||
+ | Provide the foillowing information | ||
+ | *Provide DWSMA or well location map | ||
+ | |||
+ | '''PREVIOUS STEP''': It was determined that the site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU. | ||
+ | |||
+ | ==Step 57== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
+ | *The site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_56 Yes] | ||
+ | *Karst is present within 1000 feet up-gradient or 100 feet down-gradient of the site, a local unit of government cannot provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater, and the BMP cannot be reloacted so that it is more than 1000 feet from karst. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_25 Yes] | ||
+ | *Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_31 Yes] | ||
+ | *Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_35 Yes] | ||
+ | *Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_41 Yes] | ||
+ | *Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_45 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_52 No] | ||
+ | |||
+ | '''PREVIOUS STEP''': You determined that flexible Treatment option 1 is feasible. | ||
+ | |||
+ | ==Step 58== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is Flexible Treatment Option 2 feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_56 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] | ||
+ | |||
+ | ===Flexible Treatment Option 2 (FTO #2)=== | ||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | ==Step 59== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *There are very high infiltrating soils (more than 8 inches per hour) on the site; | ||
+ | *BMP relocation to an area with lower infiltration rates is not feasible; and | ||
+ | *The subgrade cannot be modified to slow the rate to less than 8 inches per hour. | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_45 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_60 No] | ||
+ | |||
+ | '''PREVIOUS QUESTION and ANSWER''': Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours? - '''Answer''': Yes | ||
+ | |||
+ | ==Step 60== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *There are adverse hydrologic impacts from infiltration practices | ||
+ | *The BMP cannot be relocated to avoid adverse hydrologic impacts; and | ||
+ | *BMPs accomodating FTO 1 would avoid adverse hydrologic impacts | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_50 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_499 No] | ||
+ | |||
+ | ==Step 61== | ||
+ | Are there existing or proposed structures or infrastructure that make [[Flexible treatment options#Flexible Treatment Option 1 (FTO #1)|Flexible Treatment Option 1]] not feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_20 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_62 No] | ||
+ | |||
+ | '''PREVIOUS STEP''': You determined that flexible Treatment option 1 is feasible. | ||
+ | |||
+ | ==Step 62== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.) | ||
+ | *The site is located within a DWSMA, wellhead protection area, or within 200 feet of a drinking water well, and a Local Government Unit (LGU) can provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_56 Yes] | ||
+ | *Karst is present within 1000 feet up-gradient or 100 feet down-gradient of the site, a local unit of government cannot provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater, and the BMP cannot be relocated so that it is more than 1000 feet from karst. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_25 Yes] | ||
+ | *Shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_31 Yes] | ||
+ | *Contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_35 Yes] | ||
+ | *Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams) | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_41 Yes] | ||
+ | *Soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_45 Yes] | ||
+ | *Soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with an infiltration rate greater than 0.2 inches per hour, the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams), and Flexible Treatment Option 1 is feasible. | ||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_60 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_60 No] | ||
+ | |||
+ | '''PREVIOUS STEP''': You determined that Flexible Treatment Option 1 is feasible. | ||
+ | |||
+ | ==Step 63== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Do the following conditions apply? | ||
+ | *There are adverse hydrologic impacts from infiltration practices; and | ||
+ | *The BMP cannot be relocated to avoid adverse hydrologic impacts | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_65 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_64 No] | ||
+ | |||
+ | ==Step 64== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #No infiltration practices allowed, and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *Provide regulations and/or cost estimates documenting infeasibility of meeting the original Performance goal | ||
+ | |||
+ | '''PREVIOUS STEP''': It was determined that there are no site conditions that prevent infiltration and there are no adverse surface water hydrologic impacts from infiltration practices, but | ||
+ | *there are zoning and land use requirements that make the Performance Goal not feasible and BMP relocation is not feasible; or | ||
+ | *there are existing or proposed structures or infrastructure that make the Performance Goal not feasible and BMP relocation is not feasible. | ||
+ | |||
+ | ==Step 65== | ||
+ | [[File:stop sign.png|100 px|left|thumb|alt=image of stop sign|<center>You have completed the flow chart<center>]] | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | <font size=4>'''Select Flexible treatment Option 2'''</font size> | ||
+ | |||
+ | Applicant attempts to comply with the following conditions: | ||
+ | #Maximize infiltration BMPs to treat up to the 0.55 inch goal, if possible and | ||
+ | #Explore non-infiltration volume reduction practices, and | ||
+ | #Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and | ||
+ | #Remove 60 percent of the annual total phosphorus load, and | ||
+ | #Options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site. | ||
+ | |||
+ | Provide the following information | ||
+ | *Provide regulations and/or cost estimates documenting infeasibility of meeting the original Performance goal; | ||
+ | *Provide report documenting potential hydrologic impacts from infiltration on the site, prepared by a registered engineer, hydrologist, or wetland specialist | ||
+ | |||
+ | '''PREVIOUS STEP''': It was determined that | ||
+ | *there are no site conditions that prevent infiltration but | ||
+ | **there are adverse surface water hydrologic impacts from infiltration practices and BMP relocation is not feasible; and | ||
+ | **there are zoning and land use requirements that make the Performance Goal not feasible and BMP relocation is not feasible; or | ||
+ | **there are existing or proposed structures or infrastructure that make the Performance Goal not feasible and BMP relocation is not feasible. | ||
+ | |||
+ | ==Step 66== | ||
+ | [[File:Return to top.png|25px|thumb|alt=arrow image|[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Top]]] | ||
+ | |||
+ | Is Flexible Treatment Option (FTO) 2 feasible? | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_31 Yes] | ||
+ | |||
+ | [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart#Step_10 No] | ||
− | + | '''PREVIOUS QUESTION and ANSWER''': Can the BMP be raised? - '''Answer''': No | |
− | |||
− | + | [[Category:Level 2 - Management/MIDS]] | |
− | |||
− | |||
− | |||
− |
A flow chart was developed to determine the appropriate performance goal or Flexible Treatment Option for a new development, redevelopment, or linear site. You may access a pdf version of the flow chart (File:Final MIDS Flow chart.pdf) or follow the flow chart through the sequence of questions starting at Step 1 below. If you would like a copy of the flowchart in Visio, so that you can edit it, please contact us.
The wiki version of the flow chart, which starts below at Step 1, takes you through a series of questions and steps to ultimately arrive at a performance goal. The wiki version does not necessarily take you through each step nor does it completely match the pdf version of the flow chart. However, the sequence of questions and answers takes you to the same result.
Two advantages of using the wiki version on this page are that 1) the path through questions and answers is straightforward and 2) there are links, discussions, and images to assist you in answering questions.
Did you gather the site information necessary to proceed through the flow chart?
Prior to using the flow chart, gather the following preliminary information.
Does project create one acre or more of new and/or fully reconstructed impervious surfaces?
PREVIOUS QUESTION and ANSWER: The previous question defined the performance goals.
MIDS PERFORMANCE GOAL DOES NOT APPLY
The project creates less than 1 acre of impervious surface.
You have completed the flow chart.
Return to Minimal Impact Design Standards main page
Return to Design Sequence Flowchart-Flexible treatment options
Is the project linear?
PREVIOUS QUESTION and ANSWER: Does project create one acre or more of new and/or fully reconstructed impervious surfaces? Answer - Yes
Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Are there restraints due to lack of available right-of-way, off-site drainage, and/or rate control requirements? Answer: Yes
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that the site is linear, there are constraints due to lack of right-of-way or off/site drainage and/or rate control requirements, and a reasonable effort to acquire all of the right-of-way cannot be made.
Select Flexible Treatment Option 3 Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference:
PREVIOUS QUESTION: It was determined that Flexible Treatment Option 2 is not feasible.
Are there zoning and land use requirements that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER:
or
Is BMP relocation feasible
PREVIOUS QUESTION and ANSWER: Are there zoning and land use requirements that make the Performance Goal not feasible? Answer: Yes
Is Flexible Treatment Option (FTO) 1 feasible?
Applicant attempts to comply with the following conditions:
PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible - Answer: No
Is Flexible Treatment Option (FTO) 2 feasible?
Applicant attempts to comply with the following conditions:
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) 1 feasible? - Answer: No
Is the site located in a DWSMA (Drinking Water Supply Management Area), wellhead protection area, or within 200 feet of a drinking water well?
A drinking water supply management area (DWSMA) is the Minnesota Department of Health (MDH) approved surface and subsurface area surrounding a public water supply well that completely contains the scientifically calculated wellhead protection area and is managed by the entity identified in a wellhead protection plan. The boundaries of the drinking water supply management area are delineated by identifiable physical features, landmarks or political and administrative boundaries.
PREVIOUS QUESTION and ANSWER
or
Can a Local Government Unit (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater?
PREVIOUS QUESTION and ANSWER: Is the site located in a DWSMA, Wellhead Protection Area, or within 200 feet of a drinking water well? - Answer: Yes
Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible?
PREVIOUS QUESTION and ANSWER
or
Is BMP relocation feasible?
PREVIOUS QUESTION and ANSWER: - Are there existing or proposed structures or infrastructure (e.g. rate control BMPs, utilities, buildings, roadway, easements) that make the Performance Goal not feasible? - Answer: Yes
Is Flexible Treatment option (FTO) 1 feasible?
PREVIOUS QUESTION and ANSWER: Is BMP relocation feasible? - Answer: No
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Option (FTO) 1 feasible? - Answer: No
Applicant attempts to comply with the following conditions:
Is karst present on the site?
If you are unsure, we recommend you review the guidance for karst in this manual. To retain your place in this flowchart, either open the karst guidance page in a new tab (right click on the link and select Open Link in New Tab), use the back arrow after visiting the karst guidance page, or use the Breadcrumbs at the top of the page.
PREVIOUS QUESTION and ANSWER:
or
Can a local unit of government (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater?
PREVIOUS QUESTION and ANSWER: Is karst present on the site? - Answer: Yes
Is BMP relocation onsite to a location without karst feasible?
PREVIOUS QUESTION and ANSWER: Can a local unit of government (LGU) provide a higher level of engineering review to ensure a functioning system that prevents adverse impacts to groundwater? - Answer: No
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a location without karst feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
Applicant attempts to comply with the following conditions:
PREVIOUS STEP: It was determined that karst is present within 1000 feet of the site and the BMP cannot be reloacted so that it is more than 1000 feet from karst
Is shallow groundwater or shallow bedrock present on site?
If you are unsure, we recommend you review the guidance for shallow groundwater in this manual. To retain your place in this flowchart, either open the shallow groundwater guidance page in a new tab (right click on the link and select Open Link in New Tab), use the back arrow after visiting the shallow groundwater guidance page, or use the Breadcrumbs at the top of the page.
PREVIOUS QUESTION and ANSWER:
or
or
Conduct a detailed site investigation of shallow groundwater or shallow bedrock
PREVIOUS QUESTION and ANSWER: Is shallow groundwater or shallow bedrock present on site? - Answer: Yes
Is there more than 3 feet of soil depth from bottom of BMP to bedrock or groundwater (more than 10 feet is preferred)?
PREVIOUS STEP: You were asked to conduct a detailed site investigation of shallow groundwater or shallow bedrock
Is BMP relocation onsite to avoid shallow groundwater or shallow bedrock feasible?
PREVIOUS QUESTION and ANSWER: Is there more than 3 feet of soil depth from the bottom on the BMP to bedrock and groundwater (more than 10 feet is preferred)? - Answer: No
Can the BMP be raised?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to avoid shallow groundwater and shallow bedrock feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that shallow groundwater or shallow bedrock is present within 3 feet of the bottom of the BMP and the BMP cannot be relocated or raised in elevation to achieve a 3 foot or greater separation from bedrock or groundwater.
Raise BMP enough to ensure 3 feet (preferably 10 feet) of soil between bottom of BMP and top of bedrock and groundwater
PREVIOUS QUESTION and ANSWER: Can the BMP be raised? Answer - Yes
Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff?
PREVIOUS QUESTION and ANSWER:
or
or
or
Can hotspot or contamination be isolated or remediated to mitigate risk of increased contamination?
PREVIOUS QUESTION and ANSWER: Is there presence of contaminated soils and/or contaminated groundwater, or hotspot runoff? - Answer: Yes
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that contaminated soil, contaminated groundwater, or hotspot runoff is present on the site and cannot be isolated or mitigated.
Are there very low infiltrating soils (less than 0.2 inches per hour) on site?
PREVIOUS QUESTION and ANSWER:
or
Is BMP relocation onsite to a higher-infiltrating location feasible?
PREVIOUS QUESTION and ANSWER: Are there very low infiltrating soils (less than 0.2 inches per hour) on site? - Answer: Yes
Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a higher-infiltrating location feasible? - Answer: No
Provide soil boring or infiltration test results documenting low-infiltration soils.
PREVIOUS QUESTION and ANSWER: Can BMP be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)? Answer: No
Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours?
PREVIOUS STEP: You were asked to provide soil boring or infiltration test results documenting low-infiltration soils.
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that soils on the site have an infiltration rate of less than 0.2 inches per hour, the BMP cannot be relocated to areas with a higher infiltration rate, and the BMP cannot be sized to drain within 48 hours (24 hours in locations that are tributary to trout streams)
Are there very high infiltrating soils (more than 8 inches per hour) on site?
PREVIOUS QUESTION and ANSWER:
or
or
Is BMP relocation onsite to a lower-infiltrating location feasible?
PREVIOUS QUESTION and ANSWER: Are there very high infiltrating soils (more than 8 inches per hour) on site? - Answer: Yes
Can subgrade be modified to slow the rate of infiltration to less than 8 inches per hour?
PREVIOUS QUESTION and ANSWER: Is BMP relocation onsite to a lower-infiltrating location feasible? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS QUESTION and ANSWER: It was determined that soils on the site have an infiltration rate greater than 8 inches per hour, the BMP cannot be relocated to an area with an infiltration rate lower than 8 inches per hour, or the subgrade cannot be modified to slow the infiltration rate to less than 8 inches per hour
Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)?
PREVIOUS QUESTION and ANSWER: Are there very high infiltrating soils (greater than 8 inches per hour) present on site)? - Answer: No or
or
Can the BMP be relocated to avoid adverse hydrologic impacts?
PREVIOUS QUESTION and ANSWER: Are there adverse surface water hydrologic impacts from infiltration practices (e.g. impacting perched wetland)? - Answer: Yes
Would BMPs accomodating Flexible treatment option 1 avoid adverse hydrologic impacts?
PREVIOUS QUESTION and ANSWER: Can the BMP be relocated to avoid adverse hydrologic impacts? - Answer: No
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
Applicant attempts to comply with the following conditions
Additional considerations
Complete design using the following performance goals
New development projects
Linear projects
Do the following conditions apply?
and
Do the following conditions apply?
and
PREVIOUS QUESTION and ANSWER: You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements.
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
Do the following conditions apply?
and
PREVIOUS QUESTION and ANSWER: You determined that Flexible Treatment Option 2 is feasible and there are no limitations resulting from zoning and land use requirements.
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the foillowing information
PREVIOUS STEP: It was determined that the site is located within a DWSMA, wellhead protection area or within 200 feet of a drinking water well and infiltration is not allowed by the LGU.
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
PREVIOUS STEP: You determined that flexible Treatment option 1 is feasible.
Is Flexible Treatment Option 2 feasible?
Applicant attempts to comply with the following conditions:
Do the following conditions apply?
PREVIOUS QUESTION and ANSWER: Is Flexible Treatment Alternative No 1 feasible, allowing BMP to drain in 48 hours? - Answer: Yes
Do the following conditions apply?
Are there existing or proposed structures or infrastructure that make Flexible Treatment Option 1 not feasible?
PREVIOUS STEP: You determined that flexible Treatment option 1 is feasible.
Do any of the following conditions apply? (NOTE: If any condition applies, you do not need to answer the remaining questions.)
PREVIOUS STEP: You determined that Flexible Treatment Option 1 is feasible.
Do the following conditions apply?
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that there are no site conditions that prevent infiltration and there are no adverse surface water hydrologic impacts from infiltration practices, but
Select Flexible treatment Option 2
Applicant attempts to comply with the following conditions:
Provide the following information
PREVIOUS STEP: It was determined that
Is Flexible Treatment Option (FTO) 2 feasible?
PREVIOUS QUESTION and ANSWER: Can the BMP be raised? - Answer: No
This page was last edited on 25 February 2023, at 03:14.