m (→DWSMA1) |
|||
Line 39: | Line 39: | ||
===Utilities, structures, land use requirements=== | ===Utilities, structures, land use requirements=== | ||
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive? | Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive? | ||
− | [[Design sequence flow chart#Utilities1|yes]] | + | *[[Design sequence flow chart#Utilities1|yes]] |
− | [[Design sequence flow chart | + | *[[Design sequence flow chart#Karst, shallow groundwater, shallow bedrock|no]] |
====Utilities1==== | ====Utilities1==== | ||
Is BMP relocation possible? | Is BMP relocation possible? | ||
− | [[Design sequence flow chart|Karst, shallow groundwater, shallow bedrock|yes]] | + | *[[Design sequence flow chart|Karst, shallow groundwater, shallow bedrock|yes]] |
− | [[Design sequence flow chart|Utilities2|no]] | + | *[[Design sequence flow chart|Utilities2|no]] |
====Utilities2==== | ====Utilities2==== | ||
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible? | Are Flexible Treatment Option Alternatives number 1 or number 2 feasible? | ||
− | [[Design sequence flow chart#Utilities4|yes]] | + | *[[Design sequence flow chart#Utilities4|yes]] |
− | [[Design sequence flow chart#Utilities3|no]] | + | *[[Design sequence flow chart#Utilities3|no]] |
====Utilities3==== | ====Utilities3==== |
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
Speak with Local Landowners or others knowledgeable about the site
Inspect Site
Is the site located in a DWSMA, wellhead protection area, or near a drinking well?
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END