{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | {{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | ||
− | + | *3 foot separation from the bottom of the bioretention system to seasonal high water table | |
− | + | *Use most restrictive infiltration rate within 3 feet of the bottom of the BMP | |
− | + | *Drawdown time of 24 hours for trout streams | |
− | + | *For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement) | |
− | + | *Pretreatment | |
− | + | ||
− | + | {{alert|The following are recommendations for inputs into the MIDS calculator|alert-warning}} | |
− | + | *5 acre or less for contributing area | |
− | + | *Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin) | |
− | + | *Field tested infiltration rates over table values | |
− | + | ||
− | + | {{alert|The following information may be useful in determining inputs for the MIDS calculator|alert-info}} | |
− | + | *Guidance on determining infiltration rates | |
− | + | *Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) | |
− | + | *Information on assessing BMPs | |
− | + | *Information on [[Design criteria for bioretention|design]] metrics (high flow bypass, ponding depths, drawn down) | |
− | + | *Guidance on pretreatment | |
− | + | *Information on soil mixes | |
− | + | *Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance | |
− | + | *Construction specifications | |
+ | *Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]]. |