m |
m |
||
Line 338: | Line 338: | ||
<tr> | <tr> | ||
− | < | + | <td colspan=5>Draw areas where problems were observed on attached as-built plan sheet</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td colspan=5> Media Texture and Thickness Observed: </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td colspan=5>Media Texture and Thickness Observed: </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 350: | Line 350: | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td colspan=3>Soil test performed for nutrient content in past 12 months? </td> |
− | < | + | <td> Yes </td> |
− | < | + | <td> No </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td colspan=5>(see Task 6 for more information on green roof soil tests)</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
− | < | + | <td colspan=5>If yes, attach results, if not, perform soil test</td> |
</tr> | </tr> | ||
<tr> | <tr> |
Inspector Name: | ||||
Date of Inspection: : | ||||
Project Information (fill this in prior to inspection) | ||||
---|---|---|---|---|
Property Address: | Owner Contact Info | |||
Maintenance Contractor Name: | Permit # if applicable | |||
Maintenance Contractor Phone #: | Date of Green Roof Installation Substantial Completion: | |||
Type of irrigation system Overhead, drip, other? | Irrigation regime immediately prior to inspection:
Amount:Frequency and duration: Other notes: |
|||
Growing Conditions During Inspection | ||||
Temperature | Soil moisture | |||
Sunny or cloudy | ||||
Date of last rainfall | ||||
Have action items from last inspection been addressed? | ||||
VEGETATION | ||||
Current Condition Compared to Project Requirements | ||||
Item inspected | Project requirement | Current Condition | Notes | Action Needed and Deadline |
Percent Cover of Healthy Acceptable Plant Species | ||||
Diversity of Acceptable Species | ||||
Percent Cover of Weeds - list species in notes | ||||
Dominant Species – note all species 5% cover or more | ||||
Species Scientific Name | Percent Cover | Notes | ||
Signs of Plant Stress Observed: | ||||
Sign of Plant Stress Observed | Species in which it was observed | % cover of plants showing signs of stressr | Notes: potential cause of stress, other observations (e.g. radiation from adjacent glass curtain windows, inadequate nutrient or water levels, heat, wind, pests, disease) | |
Signs of Plant Stress Observed: | Yes | No | ||
Is it necessary to cut dried vegetation or remove thatch? I.e. is dried vegetation or thatch so thick that it is negatively affecting roof vegetation health? | ||||
Additional vegetation notes or action items: | ||||
GROWING MEDIUM AND DRAINAGE | ||||
Item inspected | Y/N | Notes – e.g. what appears to be causing problems? Description of problems | Action Needed and deadline | |
Gullies or other signs of erosion or sedimentation observed? | ||||
Evidence of wind scour? | ||||
Ponding or soggy spots observed? | ||||
Clogged, misaligned, or ineffective drains | ||||
Draw areas where problems were observed on attached as-built plan sheet | ||||
Media Texture and Thickness Observed: | ||||
Media Texture and Thickness Observed: | ||||
Additional soil needed? | ||||
Soil test performed for nutrient content in past 12 months? | Yes | No | ||
(see Task 6 for more information on green roof soil tests) | ||||
If yes, attach results, if not, perform soil test | ||||
Based on soil test results and condition of vegetation, is fertilization needed? | Yes | No | ||
ROOT DEVELOPMENT | ||||
At representative locations, excavate to the depth of the separation fabric and observe the root-zone conditions: | ||||
|
||||
Show representative locations and observations on as-built plan sheet and attach to this checklist | ||||
IRRIGATION | ||||
Do any broken drip or supply lines, or any other irrigation components need repair? | ||||
Is there evidence of uneven irrigation levels, such as desiccated media or marshy conditions? If so, note on as-built plan. | ||||
Does irrigation regime need to be adjusted? | ||||
OTHER NOTES:
|