m |
m |
||
Line 33: | Line 33: | ||
*Seven day cure | *Seven day cure | ||
*Must be continuously covered</td> | *Must be continuously covered</td> | ||
− | <td width="25%">Cast in place | + | <td width="25%"> |
− | <td width="25%">No cure period | + | *Cast in place |
+ | *24 hour cure</td> | ||
+ | <td width="25%"> | ||
+ | *No cure period | ||
+ | *Manual or mechanical installation of pre-manufactured units</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 75: | Line 79: | ||
<tr> | <tr> | ||
<td width="25%">Other issues</td> | <td width="25%">Other issues</td> | ||
− | <td width="25%">Avoid concentrated deicers | + | <td width="25%"> |
− | <td width="25%">Avoid seal coating | + | *Avoid concentrated deicers |
+ | *Avoid winter sanding</td> | ||
+ | <td width="25%"> | ||
+ | *Avoid seal coating | ||
+ | *Avoid winter sanding</td> | ||
<td width="25%">Avoid winter sanding</td> | <td width="25%">Avoid winter sanding</td> | ||
</tr> | </tr> | ||
Line 82: | Line 90: | ||
<td width="25%">Design reference</td> | <td width="25%">Design reference</td> | ||
<td width="25%">[[Permeable pavement references|ACI Report 522-2010]]</td> | <td width="25%">[[Permeable pavement references|ACI Report 522-2010]]</td> | ||
− | <td width="25%">Hansen 2008 NAPA</td> | + | <td width="25%">[http://www.asphaltpavement.org/index.php?option=com_content&view=article&id=219&Itemid=524 Hansen 2008 NAPA]</td> |
− | <td width="25%">Smith 2011 ICPI</td> | + | <td width="25%">Smith 2011 [http://www.icpi.org/ ICPI]</td> |
</tr> | </tr> | ||
</table> | </table> |
Properties of permeable pavements. (Link to this table)
Properties | Pervious concrete | Porous asphalt | PICP |
---|---|---|---|
Typical pavement surface thickness1 | 5 to 8 inches | 3 to 4 inches (thicker for high wheel load applications) | 3 inches1 |
Bedding layer1,6 | None | 1 in. AASHTO No. 57 stone | 2 inches of AASHTO No. 8 stone (MnDOT 3127 FA-3) |
Reservoir layer2,6 | AASHTO No. 57 stone or per hydraulic design | AASHTO No. 2, 3, or 5 stone | 4 inches of AASHTO No. 57 stone over No. 2, 3 or 4 stone |
Construction properties |
|
|
|
Installed surfacing cost3 | $3 to $4/square foot | $2/square foot | $3 to $4/square foot |
Minimum batch size | |||
Longevity4 | |||
Overflow | |||
Runoff temperature reduction | |||
Surface colors/texture | Range of light colors and textures | Black or dark grey colors | Wide range of colors, textures and patterns |
Load bearing capacity5 | |||
Surface cleaning7 | Periodic vacuuming; replace jointing stones if completely clogged and uncleanable | ||
Other issues |
|
|
Avoid winter sanding |
Design reference | ACI Report 522-2010 | Hansen 2008 NAPA | Smith 2011 ICPI |