This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
+
[[File:Wiki flow chart sequence.png|100px|thumb|alt=image of flow chart used for wiki|<font size=4>[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Launch flow chart]</font size>]]
  
==Preliminary information==
+
A flow chart was developed to determine the appropriate performance goal or Flexible Treatment Option for a new development, redevelopment, or linear site. You may access a pdf version of the flow chart ([[File:Final MIDS Flow chart.pdf]]) or follow the flow chart through the sequence of questions using the [https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Manual website].
  
===Conduct site review===
+
If you would like a copy of the flowchart in Visio, so that you can edit it, please contact us.
*Aerial photos and topographic maps
 
*County soil surveys and other soil information as available
 
*County Geologic Atlas
 
*Local groundwater levels
 
*DWSMA and Wellhead Protection maps
 
*FEMA and local floodplain maps
 
*Soil borings and site survey
 
*MPCA listing of potentially contaminated sites
 
*Phase 1 and 2 Environmental Site Assessments
 
*TMDLs and local water quality standards
 
*Wetland delineations, MNRAM assessments, and wetland classifications
 
*Proposed conditions, conceptural/preliminary site design
 
*Local zoning and land use requirements/ordinances, including stormwater rate control requirements
 
*Communication with local landowners, LGU, or others knowledgeable about the site
 
*Site inspection
 
  
===Define treatment goal===
+
[[Category:Level 2 - Management/MIDS]]
*New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces
 
*Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces
 
  
 +
<!--
 +
==Using the wiki version of the flow chart==
 +
The wiki version of the flow chart takes you through a series of questions and steps to ultimately arrive at a performance goal.  The wiki version does not necessarily take you through each step shown in the pdf version of the flow chart.  The structure of the wiki version differs from the pdf version of the flow chart.  You can see the structure used for the wiki version at [[List of flow chart questions|this link]].
  
 +
If you proceed through the flow chart using the wiki, we recommend you create a book to document the steps in the process.
 +
*On the left Toolbar, click '''Create a Book'''.
 +
*If you have created a book previously, that book may still be in memory. In this case, you will get a message asking if you want to use the previous book or start a new book.
 +
*Click on '''Start book creator'''
 +
*Click on '''Add this page to your book'''
 +
*Answer the question
 +
*Click on '''Add this page to your book'''
 +
*Answer the question
 +
*Continue adding the page to your book and then answering the question until you have completed the flow chart
 +
*Upon completing the flow chart, create a pdf document from your book and save it to your computer.
  
 
+
Note that you cannot control the formatting of the book you create within the wiki.  You can export the book as a pdf document and edit the pdf document.
 
+
-->
<font size=5>[[Design sequence flow chart#Flow chart|Begin Flow chart]]</font size>
+
==Flow chart links==
 
+
*[https://stormwater.pca.state.mn.us/index.php?title=MIDS_design_sequence_flow_chart Launch flow chart]
 
+
*[[Prelimiary information for Design Sequence Flow Chart|Preliminary information for Design Sequence Flow Chart]]
==Flow chart==
+
*Overview of [[List of flow chart questions|flowchart questions]].
Does the project create one acre or more of new and/or fully reconstructed impervious surfaces?
+
*pdf version of the flow chart: [[File:Final MIDS Flow chart.pdf]]
*[[Design sequence flow chart#Goal does not apply|No]]
 
*[[Design sequence flow chart#Linear project|Yes]]
 
 
 
___________________________________________________________
 
 
 
===Goal does not apply===
 
The MIDS performance goal does not apply
 
 
 
___________________________________________________________
 
===DWSMA===
 
Is the site located in a DWSMA, wellhead protection area, or near a drinking well?
 
*[[Design sequence flow chart#DWSMA1|Yes]]
 
*[[Design sequence flow chart#Utilities, structures, land use requirements|No]]
 
 
 
====DWSMA1====
 
*Select Flexible Treatment Option
 
*(FTO) Alternative No. 2
 
*Revise Treatment Goal
 
*No infiltration practices allowed
 
*Provide DWSMA or well location map
 
 
 
[[Design sequence flow chart#Utilities, structures and land use requirements|next]]
 
 
 
===Utilities, structures, land use requirements===
 
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
 
*[[Design sequence flow chart#Utilities1|yes]]
 
*[[Design sequence flow chart#Karst, shallow groundwater, shallow bedrock|no]]
 
 
 
====Utilities1====
 
Is BMP relocation possible?
 
*[[Design sequence flow chart|Karst, shallow groundwater, shallow bedrock|yes]]
 
*[[Design sequence flow chart|Utilities2|no]]
 
 
 
====Utilities2====
 
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
 
*[[Design sequence flow chart#Utilities4|yes]]
 
*[[Design sequence flow chart#Utilities3|no]]
 
 
 
====Utilities3====
 
Investigate Off-Site Considerations:
 
#Banking within watershed with goal of:
 
*Linear: 0.55 inches over impervious
 
*Nonlinear: 1.1 inches over impervious
 
#Cash as determined by LGU
 
 
 
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
 
 
 
<font size=5>END</font size>
 
 
 
====Utilities4====
 
*Select Flexible Treatment Option Alternative No. 1 or No. 2
 
*Revise Treatment Goal
 
*Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal
 
 
 
[[Design sequence flow chart#Karst, shallow groundwater, shallow bedrock|next]]
 
 
 
===Karst, shallow groundwater, shallow bedrock===
 

Latest revision as of 23:37, 6 December 2022

A flow chart was developed to determine the appropriate performance goal or Flexible Treatment Option for a new development, redevelopment, or linear site. You may access a pdf version of the flow chart (File:Final MIDS Flow chart.pdf) or follow the flow chart through the sequence of questions using the Manual website.