m (→Requirements) |
m (→Requirements) |
||
(26 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | < | + | [[File:Pdf image.png|100px|thumb|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Requirements,_recommendations_and_information_for_using_bioretention_with_an_underdrain_BMPs_in_the_MIDS_calculator_-_Minnesota_Stormwater_Manual_feb_2021.pdf Download pdf]</font size>]] |
− | |||
[[File:Symbol for biofiltration with an underdrain.jpg|300px|thumb|alt=Symbol for Bioretention basin (with underdrain)) used in MIDS calculator|<font size=3>Symbol for Bioretention basin (with underdrain) used in MIDS calculator.</font size>]] | [[File:Symbol for biofiltration with an underdrain.jpg|300px|thumb|alt=Symbol for Bioretention basin (with underdrain)) used in MIDS calculator|<font size=3>Symbol for Bioretention basin (with underdrain) used in MIDS calculator.</font size>]] | ||
− | [[File:Watershed tab bioretention with underdrain.png|300px|thumb|alt=Screen shot Watershed tab for bioretention with underdrain. The user must input a value for impervious area or the BMP will not provide volume and pollutant reduction. Other fields are optional.|<font size=3>Screen shot Watershed tab for Bioretention basin (with underdrain).The user must input a value for impervious area or the BMP will not provide volume and pollutant reduction. Other fields are optional.</font size>]] | + | [[File:Watershed tab bioretention with underdrain.png|300px|thumb|alt=Screen shot of Watershed tab for bioretention with underdrain. The user must input a value for impervious area or the BMP will not provide volume and pollutant reduction. Other fields are optional.|<font size=3>Screen shot Watershed tab for Bioretention basin (with underdrain).The user must input a value for impervious area or the BMP will not provide volume and pollutant reduction. Other fields are optional.</font size>]] |
[[File:User inputs tab for bioretention with underdrain.png|300px|thumb|alt=Screen shot of the BMP Parameters tab for a Bioretention basin (with underdrain). The user must enter values for all blank cells.|<font size=3>Screen shot of the BMP Parameters tab for a Bioretention basin (with underdrain). The user must enter values for all blank cells.</font size>]] | [[File:User inputs tab for bioretention with underdrain.png|300px|thumb|alt=Screen shot of the BMP Parameters tab for a Bioretention basin (with underdrain). The user must enter values for all blank cells.|<font size=3>Screen shot of the BMP Parameters tab for a Bioretention basin (with underdrain). The user must enter values for all blank cells.</font size>]] | ||
For a bioretention (aka biofiltration) BMP with an underdrain at the bottom of the engineered media, most of the stormwater captured by the BMP is filtered and lost to the [[Glossary#U|underdrain]]. However, some stormwater infiltrates through the basin bottom and sidewalls if these do not have an impermeable liner. Volume retention also occurs by [[Glossary#E|evapotranspiration]] through the vegetation in the biofiltration BMP. For [[Bioretention terminology|biofiltration]] systems with an elevated underdrain, additional volume retention is achieved through [[Glossary#I|infiltration]] of water stored in the pore spaces of the engineered media between the underdrain invert and the native soils. All pollutants in infiltrated water are credited as being removed, while a portion of the pollutant loads in the stormwater that flows through the underdrain are removed through [[Glossary#F|filtration]]. | For a bioretention (aka biofiltration) BMP with an underdrain at the bottom of the engineered media, most of the stormwater captured by the BMP is filtered and lost to the [[Glossary#U|underdrain]]. However, some stormwater infiltrates through the basin bottom and sidewalls if these do not have an impermeable liner. Volume retention also occurs by [[Glossary#E|evapotranspiration]] through the vegetation in the biofiltration BMP. For [[Bioretention terminology|biofiltration]] systems with an elevated underdrain, additional volume retention is achieved through [[Glossary#I|infiltration]] of water stored in the pore spaces of the engineered media between the underdrain invert and the native soils. All pollutants in infiltrated water are credited as being removed, while a portion of the pollutant loads in the stormwater that flows through the underdrain are removed through [[Glossary#F|filtration]]. | ||
− | NOTE: A bioretention device with an installed underdrain is a type of [[Glossary#B|biofiltration]] device, since some portion of the treated water is filtered and discharged downstream rather than infiltrated. MPCA | + | NOTE: A bioretention device with an installed underdrain is a type of [[Glossary#B|biofiltration]] device, since some portion of the treated water is filtered and discharged downstream rather than infiltrated. MPCA believes that biofiltration is the more generally applicable term for this BMP type; but the reader will currently find both of these terms on relevant pages, due to MPCA's understanding that [[Bioretention_terminology|a variety of terms]] are currently common in stormwater management. |
+ | |||
+ | ==Version 4 changes== | ||
+ | {{alert|Updates have been made to Version 4 of the MIDS Calculator|alert-info}} | ||
+ | |||
+ | *'''The USER must enter a bypass percent for this BMP.''' [https://stormwater.pca.state.mn.us/index.php?title=Estimating_and_calculating_bypass_for_the_Minimal_Impact_Design_Standards_(MIDS)_Calculator See the guidance for determining bypass percent.] | ||
+ | *The question ''Is a soil amendment used to attenuate phosphorus?'' was changed to ''Do you have a properly designed phosphorus treatment layer or area in your system (e.g. iron enhanced layer)?''. Currently, the only option for incorporating an amendment to retain phosphorus is to install [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_bioretention#Layered_systems a treatment layer below the bioretention media]. This typically is a layer containing 5-8 percent iron [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_iron_enhanced_sand_filter (link here for more information on iron-enhanced systems)]. [https://www.wrc.umn.edu/biofiltration-media-optimization-phase-ii-multi-year-performance-impacts-road-salt-and-optimized Research is currently being done] to determine if amendments can be incorporated directly into the bioretention media. | ||
+ | *When an amendment is added to the practice, the particulate phosphorus removal was changed from 0 to 40 percent. This was error in previous versions of the calculator. | ||
===MIDS calculator user inputs for biofiltration basin (with underdrain)=== | ===MIDS calculator user inputs for biofiltration basin (with underdrain)=== | ||
Line 34: | Line 40: | ||
**'''Bioretention planting media mix:''' The user selects the type of media mix installed for planting from a predefined list of [[Design criteria for bioretention#Guidance for bioretention media composition|media mixes]]: Media mix A (water quality blend), Media mix B (enhanced filtration blend), Media mix C (North Carolina State University water quality blend), Media mix D, or Other. This value is used to determine the annual phosphorus load reduction credit. | **'''Bioretention planting media mix:''' The user selects the type of media mix installed for planting from a predefined list of [[Design criteria for bioretention#Guidance for bioretention media composition|media mixes]]: Media mix A (water quality blend), Media mix B (enhanced filtration blend), Media mix C (North Carolina State University water quality blend), Media mix D, or Other. This value is used to determine the annual phosphorus load reduction credit. | ||
**'''Is the P content of the media less than 30 mg/kg?:''' This is a YES/NO question. The P content of the planting media should be tested using the [http://soiltesting.tamu.edu/files/mehlich3.pdf Mehlich 3] test or an [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and interpretation|acceptable alternative method]]. Select YES if the P content of the planting media is less than 30 milligrams per kilogram and NO if it is greater. P content testing is not needed for planting media C or D; therefore, this item will automatically populate to YES if one of those two media types are selected. This value is used to determine the annual phosphorus load reduction credit. | **'''Is the P content of the media less than 30 mg/kg?:''' This is a YES/NO question. The P content of the planting media should be tested using the [http://soiltesting.tamu.edu/files/mehlich3.pdf Mehlich 3] test or an [[Design criteria for bioretention#Notes about soil phosphorus testing: applicability and interpretation|acceptable alternative method]]. Select YES if the P content of the planting media is less than 30 milligrams per kilogram and NO if it is greater. P content testing is not needed for planting media C or D; therefore, this item will automatically populate to YES if one of those two media types are selected. This value is used to determine the annual phosphorus load reduction credit. | ||
− | **''' | + | **'''Do you have a properly designed phosphorus treatment layer or area in your system (e.g. iron enhanced layer)?:''' This is a YES/NO question. Answer YES if the bioretention filter media contains [http://stormwater.pca.state.mn.us/index.php/Soil_amendments_to_enhance_phosphorus_sorption soil amendments to enhance phosphorus sorption] and NO if amendments are not used. This value is used to determine the annual phosphorus load reduction credit. |
− | **'''Underlying soil - Hydrologic Soil Group:''' The user selects the most restrictive soil (lowest hydraulic conductivity) within the | + | **'''Underlying soil - Hydrologic Soil Group:''' The user selects the most restrictive soil (lowest hydraulic conductivity) within the 5 feet below the media/native soil interface of the biofiltration basin. There are 14 soil options that fall into 4 different Hydrologic Soil Groups ([[Glossary#H|Hydrologic Soil Group]] (HSG) A, B, C, or D) for the user. Once a soil type is selected, the corresponding [[Design infiltration rates|infiltration rate]] will populate the ''Infiltration rate of underlying soils'' field. The user may also select ''User Defined''. This selection will activate the ''User Defined Infiltration Rate'' cell, allowing the user to enter a different value from those in the predefined selection list. The maximum allowable infiltration rate is 1.63 inches per hour. |
**'''Required drawdown time:''' This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil and/or flow through the underdrain. The user must select from predefined values of 48 or 24 hours. The [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html MPCA Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is ''Highly Recommended'' when discharges are to a [[Sensitive waters and other receiving waters|trout stream]]. The calculator uses the underlying soil infiltration rate and the ''Depth below underdrain (D<sub>U</sub>)'' to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new ''Depth below underdrain (D<sub>U</sub>)'' if the stormwater stored in the BMP cannot drawdown in the required time. Note that the upper limit of 1.5 feet set for the ''Overflow depth (D<sub>O</sub>)'' also serves to ensure that the required drawdown time is met. | **'''Required drawdown time:''' This is the time in which the stormwater captured by and ponded within the BMP must drain into the underlying soil and/or flow through the underdrain. The user must select from predefined values of 48 or 24 hours. The [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html MPCA Construction Stormwater General Permit] requires drawdown within 48 hours, but 24 hours is ''Highly Recommended'' when discharges are to a [[Sensitive waters and other receiving waters|trout stream]]. The calculator uses the underlying soil infiltration rate and the ''Depth below underdrain (D<sub>U</sub>)'' to check if the BMP is meeting the drawdown time requirement. The user will encounter an error and be required to enter a new ''Depth below underdrain (D<sub>U</sub>)'' if the stormwater stored in the BMP cannot drawdown in the required time. Note that the upper limit of 1.5 feet set for the ''Overflow depth (D<sub>O</sub>)'' also serves to ensure that the required drawdown time is met. | ||
*'''BMP Summary tab:''' The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs and a combined value of the two. Also included in the summary are the volume and pollutant load reductions provided by the BMP, along with the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP, if one is defined in the ''Watershed'' tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction. | *'''BMP Summary tab:''' The BMP Summary tab summarizes the volume and pollutant reductions provided by the specific BMP. It details the performance goal volume reductions and annual average volume, dissolved P, particulate P, and TSS load reductions. Included in the summary are the total volume and pollutant loads received by the BMP from its direct watershed, from upstream BMPs and a combined value of the two. Also included in the summary are the volume and pollutant load reductions provided by the BMP, along with the volume and pollutant loads that exit the BMP through the outflow. This outflow load and volume is what is routed to the downstream BMP, if one is defined in the ''Watershed'' tab. Finally, percent reductions are provided for the percent of the performance goal achieved, percent annual runoff volume retained, total percent annual particulate phosphorus reduction, total percent annual dissolved phosphorus reduction, total percent annual TP reduction, and total percent annual TSS reduction. | ||
Line 61: | Line 67: | ||
===Required treatment volume=== | ===Required treatment volume=== | ||
− | ''Required treatment volume'', or the volume of stormwater runoff delivered to the BMP, equals the performance goal ([[Performance goals for new development, re-development and linear projects|1.1 inches for MIDS]] or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously | + | ''Required treatment volume'', or the volume of stormwater runoff delivered to the BMP, equals the performance goal ([[Performance goals for new development, re-development and linear projects|1.1 inches for MIDS]] or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously. |
===Volume reduction=== | ===Volume reduction=== | ||
Line 87: | Line 93: | ||
If the underdrain is elevated above the bottom of the BMP, then storage capacity becomes available in the media between the underdrain and the native soils. | If the underdrain is elevated above the bottom of the BMP, then storage capacity becomes available in the media between the underdrain and the native soils. | ||
− | In systems with an elevated underdrain, this ''Volume reduction stored below underdrain'' is credited instead basin bottom infiltration (V<sub>Inf<sub>b</sub></sub>) credit that is given when the underdrain is at the bottom of the engineered media. This ''Volume reduction stored below underdrain'' is given by | + | In systems with an elevated underdrain, this ''Volume reduction stored below underdrain'' is credited instead basin bottom infiltration (V<sub>Inf<sub>b</sub></sub>) credit that is given when the underdrain is at the bottom of the engineered media. This ''Volume reduction stored below underdrain'' (V<sub>U</sub>) is given by |
− | <math> | + | <math>V_U= (A_U + A_B) / 2 * (n - FC) * D_U </math> |
Where: | Where: | ||
Line 97: | Line 103: | ||
:D<sub>U</sub> is the depth of the media below the underdrain (ft). | :D<sub>U</sub> is the depth of the media below the underdrain (ft). | ||
− | The stored water must drain within the specified drawdown time. The underlying soil controls the infiltration rate. The user must input the soil with the most restrictive hydraulic conductivity in the | + | The stored water must drain within the specified drawdown time. The underlying soil controls the infiltration rate. The user must input the soil with the most restrictive hydraulic conductivity in the 5 feet directly below the basin (i.e. below the bottom of the engineered media). If the user specifies that an impermeable liner is present at the bottom of the BMP, then no volume reduction credit is given for storage below the underdrain. |
+ | |||
=====Volume reduction from basin sides infiltration (V<sub>inf<sub>s</sub></sub>): underdrain elevated or at bottom of engineered media===== | =====Volume reduction from basin sides infiltration (V<sub>inf<sub>s</sub></sub>): underdrain elevated or at bottom of engineered media===== | ||
Line 130: | Line 137: | ||
=====Measured ET (ET<sub>mea</sub>)===== | =====Measured ET (ET<sub>mea</sub>)===== | ||
− | Measured ET (ET<sub>mea</sub>) is the amount of water lost to ET as measured using available data. An average daily pan evaporation rate was estimated using previous measurements collected at the University of Minnesota Southwest Experiment Station at Lamberton, Minnesota (Source: [ | + | Measured ET (ET<sub>mea</sub>) is the amount of water lost to ET as measured using available data. An average daily pan evaporation rate was estimated using previous measurements collected at the University of Minnesota Southwest Experiment Station at Lamberton, Minnesota (Source: [https://conservancy.umn.edu/handle/11299/109293 Climate of Minnesota Part XII- The Hydrologic Cycle and Soil Water], 1979). A rate of 0.2 inches per day was selected, as this is an intermediate value between the summertime maximum rate and the lowest rates in October. Analysis of rainfall data indicates that a typical time period between precipitation events is 72 hours (3 days) in Minnesota. Therefore, a 3 day period is used to calculate the ET<sub>mea</sub>. A factor of 0.5 is also applied to convert the pan evaporation rate to ET<sub>mea</sub>. The ET<sub>mea</sub> volume thus equals the media surface area (A<sub>M</sub>) in square feet times the average daily ET rate in inches per day times 3 days. |
<math>ET_{mea} = A_M * 0.2 in/day * 0.5 * 3 days / 12 in/ft = 0.025 A_M</math> | <math>ET_{mea} = A_M * 0.2 in/day * 0.5 * 3 days / 12 in/ft = 0.025 A_M</math> | ||
Line 141: | Line 148: | ||
Annual volume retention is assessed by converting the instantaneous ''Volume reduction capacity of BMP [V]'' to an annual volume reduction percentage. This is accomplished through the use of [[Performance curves for MIDS calculator|performance curves]] developed from a range of modeling scenarios. These performance curves use the ''Volume reduction capacity of BMP [V]'', the [[Design infiltration rates|infiltration rate]] of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the ''Percent annual runoff volume retained'' and annual ''Retention volume provided by BMP''. | Annual volume retention is assessed by converting the instantaneous ''Volume reduction capacity of BMP [V]'' to an annual volume reduction percentage. This is accomplished through the use of [[Performance curves for MIDS calculator|performance curves]] developed from a range of modeling scenarios. These performance curves use the ''Volume reduction capacity of BMP [V]'', the [[Design infiltration rates|infiltration rate]] of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the ''Percent annual runoff volume retained'' and annual ''Retention volume provided by BMP''. | ||
+ | |||
+ | {{:Soil water storage properties}} | ||
===Pollutant reduction=== | ===Pollutant reduction=== | ||
Line 151: | Line 160: | ||
====Pollutant reduction via non-volume reduction treatment==== | ====Pollutant reduction via non-volume reduction treatment==== | ||
− | Stormwater that is routed to the BMP but not infiltrated or lost through ET is assumed to flow through the filter media and out the underdrain, and is indicated by the ''Annual outflow volume'' in the BMP Summary tab. The removal rate for TSS in this filtered stormwater is set at 60 percent. | + | Stormwater that is routed to the BMP but not infiltrated or lost through ET is assumed to flow through the filter media and out the underdrain, and is indicated by the ''Annual outflow volume'' in the BMP Summary tab. The removal rate for TSS in this filtered stormwater is set at 60 percent. |
+ | |||
+ | {{alert|The Minnesota Stormwater Manual provides a TSS credit of 80 percent for biofiltration practices. A literature review suggests 80 percent may be high, but the Construction Stormwater (CSW) General Permit requires 80 percent reduction of TSS for filtration practices. Therefore, the CSW permit target cannot be achieved using the MIDS calculator. We created a MIDS calculator Excel file that utilizes 80 percent removal for biofiltration practices. Access the file at [[file:Corrected July 14.xls]].|alert-info}} | ||
+ | |||
+ | The removal rates for particulate phosphorus and dissolved phosphorus in the filtered stormwater depend on the user's input to three drop-down boxes: “Planting media mix”; “Is the P content of the media less than 30 mg/kg?”; and “Is a soil amendment used to attenuate phosphorus?”. | ||
=====Particulate Phosphorus===== | =====Particulate Phosphorus===== | ||
Line 194: | Line 207: | ||
*Evapotranspiration is independent of plant type, plant density and weather conditions. | *Evapotranspiration is independent of plant type, plant density and weather conditions. | ||
− | ==Biofiltration Basin with an elevated underdrain example | + | ==Biofiltration Basin with an elevated underdrain example== |
[[File:Schematic for example bioretention with underdrain.jpg|thumb|left|alt=schematic used for the MIDS calculator example bioretention with underdrain|<font size=3>Schematic for the MIDS calculator example for bioretention with an underdrain. Impervious surface area is 1.4 acres. Pervious surface area, which includes a turf area and the bioretention basin, is 0.8 acres. See Step 1.</font size>]] | [[File:Schematic for example bioretention with underdrain.jpg|thumb|left|alt=schematic used for the MIDS calculator example bioretention with underdrain|<font size=3>Schematic for the MIDS calculator example for bioretention with an underdrain. Impervious surface area is 1.4 acres. Pervious surface area, which includes a turf area and the bioretention basin, is 0.8 acres. See Step 1.</font size>]] | ||
[[File:Tree trench no drain example site information tab.png|300px|thumb|alt=screen shot Site Information tab with elevated underdrain|<font size=3>Screen shot of Site Information tab for bioretention with elevated underdrain example. The user must input impervious acres and ZIP code. Other fields are optional. See Step 2.</font size>]] | [[File:Tree trench no drain example site information tab.png|300px|thumb|alt=screen shot Site Information tab with elevated underdrain|<font size=3>Screen shot of Site Information tab for bioretention with elevated underdrain example. The user must input impervious acres and ZIP code. Other fields are optional. See Step 2.</font size>]] | ||
[[File:Schematic for example bioretention with elevated underdrain.jpg|300px|thumb|left|alt=Schematic used for example bioretention with elevated underdrain|<font size=3>Schematic used for MIDS calculator example for bioretention with elevated underdrain. See Step 1.</font size>]] | [[File:Schematic for example bioretention with elevated underdrain.jpg|300px|thumb|left|alt=Schematic used for example bioretention with elevated underdrain|<font size=3>Schematic used for MIDS calculator example for bioretention with elevated underdrain. See Step 1.</font size>]] | ||
[[File:Schematic tab bioretention with elevated underdrain example.png|300px|thumb|alt=Screen shot of Schematic tab for bioretention with elevated underdrain example|<font size=3>Screen shot of the MIDS calculator Schematic tab for the bioretention with elevated underdrain example. See Step 3.</font size>]] | [[File:Schematic tab bioretention with elevated underdrain example.png|300px|thumb|alt=Screen shot of Schematic tab for bioretention with elevated underdrain example|<font size=3>Screen shot of the MIDS calculator Schematic tab for the bioretention with elevated underdrain example. See Step 3.</font size>]] | ||
+ | |||
+ | This example was completed using Version 2 of the Calculator. | ||
An unlined biofiltration basin with an elevated underdrain is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP area). All of the runoff from the watershed will be treated by the biofiltration basin. The soils across the area have a unified soils [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates classification of SM] (HSG type B soil). The surface overflow is located 1 ft above the media surface. The surface area of the biofiltration basin at the overflow point will be 6534 square feet. The area is 5600 square feet at the media surface. The surface area at the invert of the underdrain will be 3948 square feet. The area at the media-soil interface is 3320 square feet. The total media depth will be 3 feet with 1 foot of media between the underdrain and the native soils. Following the MPCA [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Construction Stormwater General Permit] requirement, the water below the underdrain in the biofiltration basin needs to drawdown in a 48 hour time period. The media will be [[Design criteria for bioretention#Guidance for bioretention media composition|Media Mix C]], which is mostly sand resulting in a difference between the media [http://stormwater.pca.state.mn.us/index.php/Soil_water_storage_properties wilting point and field capacity] of 0.11 cubic feet per cubic foot and a difference between the [http://stormwater.pca.state.mn.us/index.php/Soil_water_storage_properties media porosity and field capacity] of 0.26 cubic feet per cubic foot. The P content of the media is less than 30 mg/kg (milligrams per kilogram) and no [http://stormwater.pca.state.mn.us/index.php/Soil_amendments_to_enhance_phosphorus_sorption soil amendments] will be used to attenuate phosphorus. The following steps detail how this system would be set up in the MIDS calculator. | An unlined biofiltration basin with an elevated underdrain is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP area). All of the runoff from the watershed will be treated by the biofiltration basin. The soils across the area have a unified soils [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates classification of SM] (HSG type B soil). The surface overflow is located 1 ft above the media surface. The surface area of the biofiltration basin at the overflow point will be 6534 square feet. The area is 5600 square feet at the media surface. The surface area at the invert of the underdrain will be 3948 square feet. The area at the media-soil interface is 3320 square feet. The total media depth will be 3 feet with 1 foot of media between the underdrain and the native soils. Following the MPCA [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Construction Stormwater General Permit] requirement, the water below the underdrain in the biofiltration basin needs to drawdown in a 48 hour time period. The media will be [[Design criteria for bioretention#Guidance for bioretention media composition|Media Mix C]], which is mostly sand resulting in a difference between the media [http://stormwater.pca.state.mn.us/index.php/Soil_water_storage_properties wilting point and field capacity] of 0.11 cubic feet per cubic foot and a difference between the [http://stormwater.pca.state.mn.us/index.php/Soil_water_storage_properties media porosity and field capacity] of 0.26 cubic feet per cubic foot. The P content of the media is less than 30 mg/kg (milligrams per kilogram) and no [http://stormwater.pca.state.mn.us/index.php/Soil_amendments_to_enhance_phosphorus_sorption soil amendments] will be used to attenuate phosphorus. The following steps detail how this system would be set up in the MIDS calculator. | ||
Line 217: | Line 232: | ||
File:Watershed tab bioretention with elevated underdrain example.png|alt=Schematic showing Watershed tab for bioretention elevated underdrain|Screen shot showing Watershed tab for bioretention with an elevated underdrain. See Step 6. | File:Watershed tab bioretention with elevated underdrain example.png|alt=Schematic showing Watershed tab for bioretention elevated underdrain|Screen shot showing Watershed tab for bioretention with an elevated underdrain. See Step 6. | ||
File:BMP Parameters tab bioretention with elevated underdrain example 1.png|alt=Schematic showing BMP Parameters tab for bioretention elevated underdrain|Screen shot showing BMP Parameters tab for bioretention with an elevated underdrain. See Step 7. | File:BMP Parameters tab bioretention with elevated underdrain example 1.png|alt=Schematic showing BMP Parameters tab for bioretention elevated underdrain|Screen shot showing BMP Parameters tab for bioretention with an elevated underdrain. See Step 7. | ||
− | File:BMP Parameters tab bioretention with elevated underdrain example | + | File:BMP Parameters tab bioretention with elevated underdrain example 3.png|alt=Schematic showing BMP Parameters tab for bioretention elevated underdrain|Screen shot showing BMP Parameters tab for bioretention with an elevated underdrain. See Step 7. |
File:BMP Summary tab bioretention with elevated underdrain example.png|alt=screen shot BMP Summary tab for bioretention elevated underdrain|Screen shot of the BMP Summary tab for bioretention with an elevated underdrain. See Step 8. | File:BMP Summary tab bioretention with elevated underdrain example.png|alt=screen shot BMP Summary tab for bioretention elevated underdrain|Screen shot of the BMP Summary tab for bioretention with an elevated underdrain. See Step 8. | ||
File:results tab bioretention with elevated underdrain example.png|alt=Screen shot of the Results tab for bioretention with an elevated underdrain example|Screen shot of Results tab for the example of a bioretention system with an elevated underdrain. See Step 10. | File:results tab bioretention with elevated underdrain example.png|alt=Screen shot of the Results tab for bioretention with an elevated underdrain example|Screen shot of Results tab for the example of a bioretention system with an elevated underdrain. See Step 10. | ||
Line 238: | Line 253: | ||
*Bioretention planting media mix – Media Mix C (selected in dropdown box); | *Bioretention planting media mix – Media Mix C (selected in dropdown box); | ||
*Is the P content of the media less than 30 mg/kg – autofills to “Yes” for Media Mix C; | *Is the P content of the media less than 30 mg/kg – autofills to “Yes” for Media Mix C; | ||
− | *Is a | + | *Is there a designed phosphorus treatment layer – No; |
*Underlying soil – Hydrologic Soil Group: SM (HSG B; 0.45 in/hr) (selected in dropdown box); and | *Underlying soil – Hydrologic Soil Group: SM (HSG B; 0.45 in/hr) (selected in dropdown box); and | ||
*Required drawdown time: 48 hours (selected in dropdown box). | *Required drawdown time: 48 hours (selected in dropdown box). | ||
Line 301: | Line 316: | ||
==Requirements== | ==Requirements== | ||
− | [[File: | + | [[File:3 foot separation b.png|thumb|300px|alt=image illustrating separation distance to bedrock or seasonal high water table|<font size=3>Measurement of depth from the bottom of the infiltration BMP (bioretention with elevated underdrain) to the seasonally high water table or bedrock. Note that there must be a minimum of 2 feet separation when soils beneath the BMP are ripped, with a total separation distance of 3 feet or more. Infiltration BMPs include any BMP that allows water to infiltrate into the underlying soil.</font size>]] |
{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | {{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}} | ||
*At least a 3 foot separation from the bottom of an infiltration system (includes bioretention with elevated underdrain) to the seasonal high water table | *At least a 3 foot separation from the bottom of an infiltration system (includes bioretention with elevated underdrain) to the seasonal high water table | ||
*If soils below the bottom of the infiltration system are ripped to promote infiltration, at least 2 feet of separation from the bottom of the ripped zone to the [[Glossary#S|seasonal high water table]] | *If soils below the bottom of the infiltration system are ripped to promote infiltration, at least 2 feet of separation from the bottom of the ripped zone to the [[Glossary#S|seasonal high water table]] | ||
− | *Use the most restrictive infiltration rate within | + | *Use the most restrictive infiltration rate within 5 feet of the bottom of the BMP |
*For [[Determining soil infiltration rates|measured infiltration rates]], apply a safety factor of 2 | *For [[Determining soil infiltration rates|measured infiltration rates]], apply a safety factor of 2 | ||
− | *[[ | + | *[[Pretreatment]] for infiltration systems |
==Recommendations== | ==Recommendations== | ||
Line 341: | Line 356: | ||
*[[Construction specifications for bioretention]] | *[[Construction specifications for bioretention]] | ||
*[[Operation and maintenance of bioretention]] | *[[Operation and maintenance of bioretention]] | ||
+ | *[[Assessing the performance of bioretention]] | ||
*[[Cost-benefit considerations for bioretention]] | *[[Cost-benefit considerations for bioretention]] | ||
+ | *[[Calculating credits for bioretention]] | ||
*[[Soil amendments to enhance phosphorus sorption]] | *[[Soil amendments to enhance phosphorus sorption]] | ||
*[[Summary of permit requirements for bioretention]] | *[[Summary of permit requirements for bioretention]] | ||
Line 350: | Line 367: | ||
*[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator]] | *[[Requirements, recommendations and information for using bioretention with an underdrain BMPs in the MIDS calculator]] | ||
− | [[Category:MIDS | + | [[Category:Level 3 - Models and modeling/Specific models/MIDS Calculator]] |
− | [[Category: | + | [[Category:Level 3 - Best management practices/Structural practices/Bioretention]] |
</noinclude> | </noinclude> |
For a bioretention (aka biofiltration) BMP with an underdrain at the bottom of the engineered media, most of the stormwater captured by the BMP is filtered and lost to the underdrain. However, some stormwater infiltrates through the basin bottom and sidewalls if these do not have an impermeable liner. Volume retention also occurs by evapotranspiration through the vegetation in the biofiltration BMP. For biofiltration systems with an elevated underdrain, additional volume retention is achieved through infiltration of water stored in the pore spaces of the engineered media between the underdrain invert and the native soils. All pollutants in infiltrated water are credited as being removed, while a portion of the pollutant loads in the stormwater that flows through the underdrain are removed through filtration.
NOTE: A bioretention device with an installed underdrain is a type of biofiltration device, since some portion of the treated water is filtered and discharged downstream rather than infiltrated. MPCA believes that biofiltration is the more generally applicable term for this BMP type; but the reader will currently find both of these terms on relevant pages, due to MPCA's understanding that a variety of terms are currently common in stormwater management.
For a biofiltration with underdrain system, the user must input the following parameters to calculate the volume and pollutant load reductions associated with the BMP.
If the following requirements for inputs into the MIDS calculator are not met, then an error message will inform the user to change the input to meet the requirement.
\(DDT_{calc}=D_U / (I_R / 12)\)
Where
If DDTcalc is greater than the user-specified required drawdown time then the user will be prompted to enter a new depth below the underdrain or infiltration rate of the native soils.
Required treatment volume, or the volume of stormwater runoff delivered to the BMP, equals the performance goal (1.1 inches for MIDS or user-specified performance goal) times the impervious area draining to the BMP plus any water routed to the BMP from an upstream BMP. This stormwater is delivered to the BMP instantaneously.
The total estimated Volume reduction capacity of BMP [V] is the sum of infiltration and ET occurring in the biofiltration BMP, and is calculated with user-provided inputs. For this BMP, the location of the underdrain determines how the infiltration component is calculated. If the underdrain is located at the bottom of the BMP, then the infiltration credit is based on infiltration into the bottom of the BMP (Vinfb) and into side slopes of the BMP above the underdrain (Vinfs). In contrast, if the underdrain is elevated above the bottom of the BMP, then the infiltration credit is based on the volume capacity of the bioretention base (VBB) between the underdrain and the native soils, and infiltration into the side slopes of the BMP above the underdrain (Vinfs). Both types of underdrain configurations can receive credit for ET in the media above the underdrain (VET). A biofiltration system with an elevated underdrain thus behaves as a dual system, with the portion above the drain acting like a biofiltration system with an underdrain at the bottom and the portion below the underdrain acting like a bioinfiltration system.
The Volume of retention provided by BMP is the total instantaneous volume credit that can be claimed for that BMP, and is determined by comparing the Volume reduction capacity of BMP [V] to the Required treatment volume.
Even with an underdrain installed at the bottom of the engineered media, under saturated conditions some water will infiltrate through the bottom soils rather than pass through the underdrain. This Volume reduction from basin bottom infiltration (Vinfb) is given by
\(V_{Inf_b} = I_R * (DDT) * A_B / (12in/ft) = 0.06 * (DDT) * A_B / (12in/ft)\)
Where
The default infiltration rate is set at 0.06 inches per hour to represent a D soil. This rate was selected because it is assumed most of the stormwater will pass through the underdrain before it can infiltrate through the bottom of the BMP. This may be a conservative assumption if underdrains are small, spaced far apart, and the underlying soil has an infiltration rate greater than 0.06 inches per hour. Conversely, more closely spaced or larger underdrains may allow the basin to drain in less than the required drawdown time, resulting in a slight overestimation of (Vinfb). If the user specifies that an impermeable liner is present at the bottom of the BMP, then no credit is given for infiltration into the bottom soils.
If the underdrain is elevated above the bottom of the BMP, then storage capacity becomes available in the media between the underdrain and the native soils. In systems with an elevated underdrain, this Volume reduction stored below underdrain is credited instead basin bottom infiltration (VInfb) credit that is given when the underdrain is at the bottom of the engineered media. This Volume reduction stored below underdrain (VU) is given by
\(V_U= (A_U + A_B) / 2 * (n - FC) * D_U \)
Where:
The stored water must drain within the specified drawdown time. The underlying soil controls the infiltration rate. The user must input the soil with the most restrictive hydraulic conductivity in the 5 feet directly below the basin (i.e. below the bottom of the engineered media). If the user specifies that an impermeable liner is present at the bottom of the BMP, then no volume reduction credit is given for storage below the underdrain.
Under saturated conditions within the filter media, water will infiltrate through any existing sloped sidewalls of the basin as the stormwater draws down through the underdrain. Stormwater lost from a sloped sidewall (Vinfs) is considered to infiltrate vertically into the surrounding soil. This credit is calculated whether the underdrain is elevated or at the base of the engineered media. The volume of water infiltrated through the sidewalls is given by
\(V_{Inf_s} = I_R * (DDT / 2) * (A_O - A_U ) / (12in/ft) = 0.06 * (DDT / 2) * (A_O - A_U ) / (12in/ft)\)
Where:
Due to the fact that drawdown occurs as a continuous process, basin sides infiltration is not presumed to occur along the entire height of the sidewall during the entire drawdown time. For example, at "time zero", the entire sidewall should be exposed to saturated conditions and exhibit sidewall infiltration; but at the end of the drawdown period, there would theoretically be no section of the sidewall that is exposed to saturated conditions. Therefore, the drawdown time used in the calculation of (Vinfs) is reduced by a factor of 2 to account for the drop in water level and to approximate the "average" water level within the BMP during the drawdown period. The drop in water level is thus assumed to be linear over the drawdown time. A conservative default infiltration rate of 0.06 inches per hour is used because it is assumed that most of the stormwater will pass through the underdrain before it can infiltrate through the sidewalls of the BMP. If the user specifies that an impermeable liner is present on the sides of the BMP or if the sidewalls are not sloped (i.e., AO = AU), then no credit is given for infiltration into the side soils.
In addition to the credit given for infiltration, a biofiltration BMP can achieve volume reduction through ET. The volume of water lost through evapotranspiration (VET) is the smaller of two calculated values, potential ET and measured ET.
Potential ET (ETpot) is equal to the amount of water stored between field capacity and the wilting point in the media above the underdrain, and is given by
\(ET_{pot} = (D_M - D_U ) * (A_M + A_U) / 2 * (FC - WP)\)
Where
Measured ET (ETmea) is the amount of water lost to ET as measured using available data. An average daily pan evaporation rate was estimated using previous measurements collected at the University of Minnesota Southwest Experiment Station at Lamberton, Minnesota (Source: Climate of Minnesota Part XII- The Hydrologic Cycle and Soil Water, 1979). A rate of 0.2 inches per day was selected, as this is an intermediate value between the summertime maximum rate and the lowest rates in October. Analysis of rainfall data indicates that a typical time period between precipitation events is 72 hours (3 days) in Minnesota. Therefore, a 3 day period is used to calculate the ETmea. A factor of 0.5 is also applied to convert the pan evaporation rate to ETmea. The ETmea volume thus equals the media surface area (AM) in square feet times the average daily ET rate in inches per day times 3 days.
\(ET_{mea} = A_M * 0.2 in/day * 0.5 * 3 days / 12 in/ft = 0.025 A_M\)
The sum of the volumes lost to infiltration and to ET as calculated using the appropriate methods above gives the Volume reduction capacity of BMP [V]. The MIDS calculator compares the Volume reduction capacity of BMP [V] with the Required treatment volume, and the lesser of the two values is used to populate the Volume of retention provided by BMP. This comparison between potential and actual treatment volumes ensures that the BMP does not claim more credit than is due based on the actual amount of water routed to it. The Volume of retention provided by BMP is the actual volume credit the BMP receives toward the instantaneous performance goal. For example, if the BMP is oversized the user will only receive volume credit for the Required treatment volume routed to the BMP.
Annual volume retention is assessed by converting the instantaneous Volume reduction capacity of BMP [V] to an annual volume reduction percentage. This is accomplished through the use of performance curves developed from a range of modeling scenarios. These performance curves use the Volume reduction capacity of BMP [V], the infiltration rate of the underlying soils, the percent imperviousness of the contributing watershed area, and the size of the contributing watershed to calculate the Percent annual runoff volume retained and annual Retention volume provided by BMP.
Recommended values for porosity, field capacity and wilting point for different soils.1
Link to this table.
Soil | Hydrologic soil group | Porosity 2 (volume/volume) | Field capacity (volume/volume) | Wilting point (volume/volume) | Porosity minus field capacity (volume/volume)3 | Field capacity minus wilting point (volume/volume)4 |
---|---|---|---|---|---|---|
Sand | A (GM, SW, or SP) | 0.43 | 0.17 | 0.025 to 0.09 | 0.26 | 0.11 |
Loamy sand | A (GM, SW, or SP) | 0.44 | 0.09 | 0.04 | 0.35 | 0.05 |
Sandy loam | A (GM, SW, or SP) | 0.45 | 0.14 | 0.05 | 0.31 | 0.09 |
Loam | B (ML or OL) | 0.47 | 0.25 to 0.32 | 0.09 to 0.15 | 0.19 | 0.16 |
Silt loam | B (ML or OL) | 0.50 | 0.28 | 0.11 | 0.22 | 0.17 |
Sandy clay loam | C | 0.4 | 0.07 | |||
Clay loam | D | 0.46 | 0.32 | 0.15 | 0.14 | 0.17 |
Silty clay loam | D | 0.47 to 0.51 | 0.30 to 0.37 | 0.17 to 0.22 | 0.16 | 0.14 |
Sandy clay | D | 0.43 | 0.11 | |||
Silty clay | D | 0.47 | 0.05 | |||
Clay | D | 0.47 | 0.32 | 0.20 | 0.15 | 0.12 |
1Sources of information include Saxton and Rawls (2006), Cornell University, USDA-NIFA, Minnesota Stormwater Manual. (See References for trees)
2Soil saturation is assumed to be equal to the porosity.
3This value may be used to represent the volume of water that will drain from a bioretention media.
4This value may be used to estimate the amount of water available for evapotranspiration
Pollutant removal can be accomplished both via volume reducing and non-volume reducing processes in a biofiltration BMP. Pollutant load reductions are calculated on an annual basis and are thus dependent upon the volume of water retained by the BMP through infiltration and ET and the volume of water treated by filtration in the BMP.
The first step in calculating annual pollutant load reductions is to determine the annual Retention volume provided by BMP as discussed in the Volume reduction section. All pollutants in this retained water are considered captured for a 100 percent removal. Thus, while oversizing a BMP above the Required treatment volume will not provide additional credit towards the instantaneous volume performance goal, it may provide additional annual pollutant reduction through treatment of water beyond the Required treatment volume.
Stormwater that is routed to the BMP but not infiltrated or lost through ET is assumed to flow through the filter media and out the underdrain, and is indicated by the Annual outflow volume in the BMP Summary tab. The removal rate for TSS in this filtered stormwater is set at 60 percent.
The removal rates for particulate phosphorus and dissolved phosphorus in the filtered stormwater depend on the user's input to three drop-down boxes: “Planting media mix”; “Is the P content of the media less than 30 mg/kg?”; and “Is a soil amendment used to attenuate phosphorus?”.
The particulate phosphorus credit given for non-volume reduction treatment is either 0 percent or 80 percent depending on the media mix used and its P content.
NOTE: If the Olsen test is used to determine P content of the media mix, a simple conversion is required.
The dissolved phosphorus credit given for non-volume reduction treatment is between 0 percent and 60 percent depending on the media mix, the media P content, and if the media was amended to attenuate phosphorus.
\(credit = 20 percent (D_M- D_U) / 2 ft\)
Where
The credit is calculated as a percent reduction with a maximum value of 20 percent for media depths above the underdrain greater than 2 feet. If the media depth above the underdrain is less than 2 feet the credit is reduced equivalently.
Phosphorus credits for bioretention systems with an underdrain. This includes tree trenches and dry swales.
Link to this table
Particulate phosphorus (PP) | Dissolved phosphorus (DP) |
---|---|
Is Media Mix C or D being used or, if using a mix other than C or D, is the media phosphorus content 30 mg/kg or less per the Mehlich 3 (or equivalent) test1?
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here.
Example PP removal credit
|
1. Is Media Mix C or D being used or, if using a mix other than C or D, is the media phosphorus content 30 mg/kg or less per the Mehlich 3 (or equivalent) test1?
2. Does the system include approved P-sorbing soil amendments2?
The assumption of 55 percent particulate phosphorus and 45 percent dissolved phosphorus is likely inaccurate for certain land uses, such as industrial, transportation, and some commercial areas. Studies indicate particulate phosphorus comprises a greater percent of total phosphorus in these land uses. It may therefore be appropriate to modify the above equation with locally derived ratios for particulate and dissolved phosphorus. For more information on fractionation of phosphorus in stormwater runoff, link here. |
|
1Other widely accepted soil P tests may be used. Note: a basic conversion of test results may be necessary
2Acceptable P sorption amendments include
NOTE: The user can modify event mean concentrations (EMCs) on the Site Information tab in the calculator. Default concentrations are 54.5 milligrams per liter for total suspended solids (TSS) and 0.3 milligrams per liter for total phosphorus (particulate plus dissolved). The calculator will notify the user if the default is changed. Changing the default EMC will result in changes to the total pounds of pollutant reduced.
A biofiltration basin can be routed to any other BMP, except for a green roof, a swale side slope, or any BMP that would cause stormwater to be rerouted back to the biofiltration basin already in the sequence. All BMPs can be routed to a biofiltration, except for a swale side slope BMP.
The following general assumptions apply in calculating the credit for a biofiltration basin. If these assumptions are not followed the volume and pollutant reduction credits cannot be applied.
This example was completed using Version 2 of the Calculator.
An unlined biofiltration basin with an elevated underdrain is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP area). All of the runoff from the watershed will be treated by the biofiltration basin. The soils across the area have a unified soils classification of SM (HSG type B soil). The surface overflow is located 1 ft above the media surface. The surface area of the biofiltration basin at the overflow point will be 6534 square feet. The area is 5600 square feet at the media surface. The surface area at the invert of the underdrain will be 3948 square feet. The area at the media-soil interface is 3320 square feet. The total media depth will be 3 feet with 1 foot of media between the underdrain and the native soils. Following the MPCA Construction Stormwater General Permit requirement, the water below the underdrain in the biofiltration basin needs to drawdown in a 48 hour time period. The media will be Media Mix C, which is mostly sand resulting in a difference between the media wilting point and field capacity of 0.11 cubic feet per cubic foot and a difference between the media porosity and field capacity of 0.26 cubic feet per cubic foot. The P content of the media is less than 30 mg/kg (milligrams per kilogram) and no soil amendments will be used to attenuate phosphorus. The following steps detail how this system would be set up in the MIDS calculator.
Step 1: Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious area in type B soils. The pervious area includes the turf area and the area of the biofiltration basin.
Step 2: Fill in the site specific information into the Site Information tab. This includes entering a ZIP Code (55414 for this example) and the watershed information from Step 1. The Managed turf area includes the turf area and the area of the bioretention basin. ZIP code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional.
Step 3: Go to the Schematic tab and drag and drop the Bioretention basin (with underdrain) icon into the Schematic window.
Step 4: Open the BMP properties for the bioretention basin by right clicking on the Bioretention basin (with underdrain) icon and selecting Edit BMP Properties, or by double clicking on the Bioretention basin (with underdrain) icon.
Step 5: If help is needed click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculations specific to the Bioretention basin (with underdrain) BMP.
Step 6: Determine the watershed characteristics for the Bioretention basin. For this example the entire site is draining to the bioretention basin. The watershed parameters therefore include a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious turf area in type B soils. There is no routing for this BMP. Fill in the BMP specific watershed information in the Watershed tab (1.4 acres on impervious cover and 0.8 acres of Managed turf in B soils).
Step 7: Enter the BMP design parameters into the BMP parameters tab. This bioretention basin with an elevated underdrain example would require the following entries:
Step 8: Click on BMP Summary tab to view results for this BMP.
Step 9: Click on the OK button to exit the BMP Properties screen.
Step 10: Click on Results tab to see overall results for the site.
An unlined biofiltration basin with an underdrain at the bottom is to be constructed in a watershed that contains a 1.4 acre parking lot surrounded by 0.8 acres of pervious area (turf area and the bioretention BMP area). All of the runoff from the watershed will be treated by the biofiltration basin. The soils across the area have a unified soils classification of SM (HSG type B soil). The surface overflow is located 1 ft above the media surface. The surface area of the biofiltration basin at the overflow point will be 6534 square feet. The area is 5600 square feet at the media surface. The area at the media-soil interface is 3320 square feet. The total media depth will be 3 feet. The media will be Media Mix C, which is mostly sand resulting in a difference between the media wilting point and field capacity of 0.11 cubic feet per cubic foot and a difference between the media porosity and field capacity of 0.26 cubic feet per cubic foot. The P content of the media is less than 30 mg/kg (milligrams per kilogram) and no soil amendments will be used to attenuate phosphorus. The following steps detail how this system would be set up in the MIDS calculator.
Step 1: Determine the watershed characteristics of your entire site. For this example we have a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious area in type B soils. The pervious area includes the turf area and the area of the biofiltration basin.
Step 2: Fill in the site specific information into the Site Information tab. This includes entering a Zip Code (55414 for this example) and the watershed information from Step 1. The Managed turf area includes the turf area and the area of the bioretention basin. Zip code and impervious area must be filled in or an error message will be generated. Other fields on this screen are optional.
Step 3: Go to the Schematic tab and drag and drop the Bioretention basin (with underdrain) icon into the Schematic window.
Step 4: Open the BMP properties for the bioretention basin by right clicking on the “Bioretention basin (with underdrain)” icon and selecting Edit BMP Properties, or by double clicking on the Bioretention basin (with underdrain) icon.
Step 5: If help is needed click on the Minnesota Stormwater Manual Wiki link or the Help button to review input parameter specifications and calculations pertinent to the “Bioretention basin (with underdrain)” BMP.
Step 6: Determine the watershed characteristics for the biofiltration basin. For this example the entire site is draining to the biofiltration basin. The watershed parameters therefore include a 2.2 acre site with 1.4 acres of impervious area and 0.8 acres of pervious turf area in type B soils. There is no routing for this BMP. Fill in the BMP specific watershed information in the Watershed tab (1.4 acres on impervious cover and 0.8 acres of Managed turf in B soils).
Step 7: Enter in the BMP design parameters into the BMP Parameters tab. This bioretention basin example with an underdrain at the bottom of the media requires the following entries:
Step 8: Click on BMP Summary tab to view results for this BMP.
Step 9: Click on the OK button to exit the BMP properties screen.
Step 10: Click on Results tab to see overall results for the site.
This page was last edited on 29 January 2023, at 13:27.