[[file:Construction 1.jpg|300px|thumb|alt=construction stormwater image</alt>]]
+
[[file:Construction 1.jpg|300px|left|thumb|alt=construction stormwater image</alt>]]
  
[[file:Permit icon.png|200px|thumb|alt=image of permit|<font size=3>[http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit Link to 2013 Construction Stormwater General permit]</font size>]]
+
[[file:Permit icon.png|200px|thumb|alt=image of permit|<font size=3>[https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf 2023 Minnesota Construction Stormwater Permit]</font size>]]
  
[[file:online logo.jpg|300px|thumb|alt=MPCA online logo|<font size=3>[https://netweb.pca.state.mn.us/private/ Link to online permit application]</font size>]]
+
[[file:online logo.jpg|300px|thumb|alt=MPCA online logo|<font size=3>[https://rsp.pca.state.mn.us/TEMPO_RSP/ Link to online permit application]</font size>]]
 +
 
 +
[[File:CSW reporting.png|thumb|150 px|alt=image of phone|<font size=3>[https://www.pca.state.mn.us/sites/default/files/wq-strm2-105.pdf Reporting construction site stormwater discharges]</font size>]]
  
 
When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency estimates that 20 to 150 tons of soil per acre are lost every year to stormwater runoff from construction sites.
 
When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency estimates that 20 to 150 tons of soil per acre are lost every year to stormwater runoff from construction sites.
Line 11: Line 13:
 
This page provides links to pages that address topics related to construction stormwater.
 
This page provides links to pages that address topics related to construction stormwater.
  
*Construction Stormwater permit
+
==Construction Stormwater permit==
**[http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit 2013 permit]
+
*[https://stormwater.pca.state.mn.us/index.php?title=2023_Minnesota_Construction_Stormwater_Permit 2023 permit]
**[[Construction stormwater permit overview and permit application]]
+
*[[Construction stormwater permit overview and permit application]]
**[[Construction stormwater permit and program forms]]
+
*[[Construction stormwater permit and program forms]]
**[[Construction stormwater permit fact sheets]]
+
*[[Construction stormwater permit general information]]
**[[Construction stormwater permit general information]]
+
 
*[[Sediment control practices]] - Links to a page that provides a portal to information on individual sediment control practices
+
==Previous Construction Stormwater General permits==
<!--**[[Sediment control practices - Temporary Construction Entrance]]
+
*2018 permit - [[File:Wq-strm2-80a.pdf]]
**[[Sediment control practices - Cofferdams]]
+
*2013 permit - [[File:Wq-strm2-68a.pdf]]
**[[Sediment control practices - Perimeter Control]]
+
*2008 permit - [[File:CSW permit 2008 wq-strm2-51.pdf]]
**[[Sediment control practices - Check Dams]]
+
*2003 permit - [[File:CSW permit 2003 wq-strm2-51a.pdf]]
**[[Sediment control practices - Storm Drain Inlet Protection]]-->
+
*1998 permit - [[File:CSW permit 1998 sw-cpermit.pdf]]
*[[Erosion prevention practices]] - Links to a page that provides a portal to information on individual erosion prevention practices
+
 
<!--**[[Erosion prevention practices - Temporary Seeding and Stabilization]]-->
+
==Compliance guidance==
 +
*[[Construction stormwater best management practice – Homeowner fact sheet]]
 +
*[[How to use the Notice of Termination/Permit Modification Form]]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-09.pdf Stormwater Compliance Assistance Toolkit for Small Construction Operators]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-10.pdf Stormwater Construction Inspection Guide]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-11.pdf Stormwater Construction Inspector's Field Guide]
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-36.doc Construction Stormwater Inspection Checklist]
 +
 
 +
==Guidance, tools, and resources for construction stormwater==
 +
*[[Who needs a Construction Stormwater Permit?]]
 +
*[[Construction Stormwater Permit timelines]]
 +
*[[Construction stormwater permit fact sheets]]
 +
*[[Planning, scheduling, and sequencing for construction]]
 +
 
 +
==Best Management Practices==
 +
*[[Erosion prevention practices]] - Links to a page that provides a portal to information on individual erosion prevention practices.
 +
*[[Sediment control practices]] - Links to a page that provides a portal to information on individual sediment control practices.
 +
*[[Construction stormwater treatment]]
 +
*[[Construction practices to minimize sediment discharge]]
 +
*[[Winter construction practices for site stabilization, erosion prevention and sediment control]]
 +
*[[General principles for erosion prevention and sediment control at construction sites in Minnesota]]
 +
*[[10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]]: An interactive image illustrating stormwater practices at small construction sites.
 +
*[[Links for construction stormwater]]
 +
*[[Construction stormwater inspection checklist wq-strm2-36|Construction stormwater inspection checklist]]
 +
 
 +
==Other links==
 +
*[[Construction stormwater photo gallery]]
 
*[http://stormwater.pca.state.mn.us/index.php/Alleviating_compaction_from_construction_activities Alleviating compaction from construction activities]
 
*[http://stormwater.pca.state.mn.us/index.php/Alleviating_compaction_from_construction_activities Alleviating compaction from construction activities]
*[[Miscellaneous guidance for construction stormwater]]
+
<!--*[[Miscellaneous guidance for construction stormwater]]-->
 
*[[Links for construction stormwater]]
 
*[[Links for construction stormwater]]
 +
*[[Definitions and terminology for construction stormwater]]
 +
*[[Construction stormwater technical support documents for manual updates]]
 +
*[[Construction Program FAQ]]
 +
*[[Information on soil]]
  
===Construction Stormwater Permit Application===
+
==Construction Stormwater Permit Application==
Click [https://rsp.pca.state.mn.us/TEMPO_RSP/Orchestrate.do?initiate=true '''here'''] to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application
+
Click [https://rsp.pca.state.mn.us/TEMPO_RSP '''here'''] to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application
 
[[file:online logo.jpg|thumb|none|alt=MPCA online logo|[https://rsp.pca.state.mn.us/TEMPO_RSP/Orchestrate.do?initiate=true/ '''Online Services''']]]
 
[[file:online logo.jpg|thumb|none|alt=MPCA online logo|[https://rsp.pca.state.mn.us/TEMPO_RSP/Orchestrate.do?initiate=true/ '''Online Services''']]]
  
 
Visa, Master cards or checks are accepted for the $400 fee payment.
 
Visa, Master cards or checks are accepted for the $400 fee payment.
  
'''A project is NOT eligible for online processing and must complete a paper form if''':
+
[[Construction stormwater permit application - FAQ]]
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.
+
 
 +
==Special Waters and Impaired Waters==
 +
{{alert|When searching for special or imapired waters, we recommend using the Construction Stormwater Special Waters Search tool (see link below). Mapping layers in this tool include Special Waters, Drinking Water Supply Management Areas (DWSMAs), location of active construction sites, Municipal Separate Storm Sewer System (MS4) areas, and Environmental Justice areas.|alert-info}}
 +
 
 +
[https://mpca.maps.arcgis.com/apps/webappviewer/index.html?id=e03ef170fa3e41f6be92f9fafec100cc Construction Stormwater Special Waters Search tool link]
 +
 
 +
NPDES/SDS permits for construction sites near specially-protected and impaired waters require additional controls, conditions or an individual permit:
 +
*Sites that discharge near waters with qualities that warrant extra protection (special waters) must use additional best management practices and enhanced runoff controls.
 +
*Sites within one mile (aerial radius measurement) of and that discharge to a water impaired for phosphorus, turbidity, dissolved oxygen, and biotic impairment, must meet [http://stormwater.pca.state.mn.us/index.php/APPENDIX_A#B._REQUIREMENTS_FOR_DISCHARGES_TO_SPECIAL_WATERS_AND_IMPAIRED_WATERS special conditions] (Appendix A, Section B.10). There are no additional requirements for waters impaired for other pollutants.
 +
*Sites that discharge to calcareous fens, need a letter of approval from the Department of Natural Resources.
 +
The MPCA has several documents and an interactive map called Special Waters Search to help project planners identify those waters near their site that may require extra protections or an individual permit. The specific requirements are outlined in the General Stormwater Permit.
 +
*[[file:CSW Special waters as of 4-15-2013.pdf]] - Special Waters List (wq-strm1-05)
 +
*[https://files.dnr.state.mn.us/eco/wetlands/calcareous_fen_list.pdf Known Calcareous Fens List] (wq-strm1-06). For access to maps and a shapefile, see [https://gisdata.mn.gov/dataset/biota-nhis-calcareous-fens Calcareous Fens - Source Feature Points]. For access to the list in an Excel format [https://www.pca.state.mn.us/sites/default/files/wq-strm1-06.xls link here].
 +
*General Information about [https://www.pca.state.mn.us/water/total-maximum-daily-load-tmdl-projects Impaired Waters and the Current TMDL List] of Impaired Waters
 +
*[https://www.pca.state.mn.us/water/special-and-impaired-waters-search-tool Special and Impaired Waters Search]: This is an electronic map tool using Geographic Information Systems (GIS) technology. Find the construction site location, draw the site boundaries and create a list of special waters.
 +
 
 +
==[https://webapp.pca.state.mn.us/csw/permits Construction stormwater search]==
 +
 
 +
==[[CSW EAW worksheet]]==
  
 +
<!--'''A project is NOT eligible for online processing and must complete a paper form if''':
 +
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.-->
  
 
<!--[[File:Construction stormwater icon.jpg|thumb|300px|alt=icon for construction stormwater]]
 
<!--[[File:Construction stormwater icon.jpg|thumb|300px|alt=icon for construction stormwater]]
Line 109: Line 161:
 
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.-->
 
*The project will disturb 50 or more acres AND has a discharge point within one mile of an impaired or [[Special Waters and Impaired Waters|special water]] listed in [[APPENDIX A|Appendix A]] of the construction stormwater general permit AND the discharge flows to these waters. Applications are due 30-days before the anticipated construction start date.-->
  
<!--===[[Construction Program FAQ]]===
+
<noinclude>
<p>If your project must complete a paper form or if you are unable to use the online application, contact the MPCA at CSW.pca@State.mn.us or call the MPCA Stormwater Hotline at 651-757-2119 or 800-657-3804. For instructions on how attain a copy of the paper form.</p>
+
[[Category:Level 2 - Regulatory/Construction (CSW)]]
[http://www.pca.state.mn.us/index.php/view-document.html?gid=7389 Notice of Termination/Permit Modification Form]
+
</noinclude>
<p>Use the Notice of Termination application to terminate permit coverage of the original Stormwater Permit number or the Subdivision Registration permit number.</p>
 
<p>How to Use the [[How to use the CSW Notice of Termination/Permit Modification Form|Notice of Termination/ Permit Modification Form]] (wq-strm2-60i)</p>-->
 
 
 
[[Special Waters and Impaired Waters]]
 
 
 
[[CSW EAW worksheet]]
 

Latest revision as of 19:51, 15 August 2023

construction stormwater image</alt>

When stormwater drains off a construction site, it carries sediment and other pollutants that harm lakes, streams and wetlands. According to the 1996 National Water Quality Inventory, stormwater runoff is a leading source of water pollution. The U.S. Environmental Protection Agency estimates that 20 to 150 tons of soil per acre are lost every year to stormwater runoff from construction sites.

Controlling erosion can significantly reduce the amount of sedimentation and other pollutants transported by runoff from construction sites. To keep Minnesota’s valuable water resources clean the Minnesota Pollution Control Agency (MPCA) issues permits to construction site owners and their operators to prevent stormwater pollution during and after construction.

This page provides links to pages that address topics related to construction stormwater.

Construction Stormwater permit

Previous Construction Stormwater General permits

Compliance guidance

Guidance, tools, and resources for construction stormwater

Best Management Practices

Other links

Construction Stormwater Permit Application

Click here to log into the e-Services then once logged in, click on Construction Stormwater General Permit Application

Visa, Master cards or checks are accepted for the $400 fee payment.

Construction stormwater permit application - FAQ

Special Waters and Impaired Waters

Information: When searching for special or imapired waters, we recommend using the Construction Stormwater Special Waters Search tool (see link below). Mapping layers in this tool include Special Waters, Drinking Water Supply Management Areas (DWSMAs), location of active construction sites, Municipal Separate Storm Sewer System (MS4) areas, and Environmental Justice areas.

Construction Stormwater Special Waters Search tool link

NPDES/SDS permits for construction sites near specially-protected and impaired waters require additional controls, conditions or an individual permit:

  • Sites that discharge near waters with qualities that warrant extra protection (special waters) must use additional best management practices and enhanced runoff controls.
  • Sites within one mile (aerial radius measurement) of and that discharge to a water impaired for phosphorus, turbidity, dissolved oxygen, and biotic impairment, must meet special conditions (Appendix A, Section B.10). There are no additional requirements for waters impaired for other pollutants.
  • Sites that discharge to calcareous fens, need a letter of approval from the Department of Natural Resources.

The MPCA has several documents and an interactive map called Special Waters Search to help project planners identify those waters near their site that may require extra protections or an individual permit. The specific requirements are outlined in the General Stormwater Permit.

Construction stormwater search

CSW EAW worksheet