(Created page with "<center><font size=3>'''Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank'''</font size><br> Link to this Engineers estimate...") |
m |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | <font size=3>'''Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank'''</font size><br> | |
− | Link to this [[Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank|table]] | + | Link to this [[Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank|table]] |
<table class="sortable"> | <table class="sortable"> | ||
Line 11: | Line 11: | ||
<th>TOTAL COST</th> | <th>TOTAL COST</th> | ||
</tr> | </tr> | ||
− | |||
<tr> | <tr> | ||
<td>RAINWATER HARVESTING PACKAGE: 1,500 GALLON ABOVE GROUND CORRUGATED STEEL TANK AND ASSOCIATED FITTINGS & ACCESSORIES, INCLUDING PUMP AND FILTER SYSTEM. (72" DIA. X 9')</td> | <td>RAINWATER HARVESTING PACKAGE: 1,500 GALLON ABOVE GROUND CORRUGATED STEEL TANK AND ASSOCIATED FITTINGS & ACCESSORIES, INCLUDING PUMP AND FILTER SYSTEM. (72" DIA. X 9')</td> | ||
Line 19: | Line 18: | ||
<td>💲15,000</td> | <td>💲15,000</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>REINFORCED CONCRETE FOUNDATION ON IMPROVED SUBGRADE</td> | <td>REINFORCED CONCRETE FOUNDATION ON IMPROVED SUBGRADE</td> | ||
Line 29: | Line 25: | ||
<td>💲2,500</td> | <td>💲2,500</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>REMOVE EXISTING GUTTER</td> | <td>REMOVE EXISTING GUTTER</td> | ||
Line 39: | Line 32: | ||
<td>💲540</td> | <td>💲540</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>5" BOX GUTTER</td> | <td>5" BOX GUTTER</td> | ||
Line 49: | Line 39: | ||
<td>💲2,220</td> | <td>💲2,220</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>GUTTER DOWNSPOUTS</td> | <td>GUTTER DOWNSPOUTS</td> | ||
Line 59: | Line 46: | ||
<td>💲675</td> | <td>💲675</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>6" HDPE PIPE</td> | <td>6" HDPE PIPE</td> | ||
Line 69: | Line 53: | ||
<td>💲3,300</td> | <td>💲3,300</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>RODENT GUARD</td> | <td>RODENT GUARD</td> | ||
Line 79: | Line 60: | ||
<td>💲350</td> | <td>💲350</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>SCOUR STOP MAT</td> | <td>SCOUR STOP MAT</td> | ||
Line 89: | Line 67: | ||
<td>💲960</td> | <td>💲960</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>EROSION CONTROL BLANKET</td> | <td>EROSION CONTROL BLANKET</td> | ||
Line 99: | Line 74: | ||
<td>💲284</td> | <td>💲284</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>ENGINEER'S REPORT</td> | <td>ENGINEER'S REPORT</td> | ||
Line 109: | Line 81: | ||
<td>💲2,500</td> | <td>💲2,500</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td>O&M GUIDELINES</td> | <td>O&M GUIDELINES</td> | ||
Line 119: | Line 88: | ||
<td>💲1,500</td> | <td>💲1,500</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
<tr> | <tr> | ||
<td colspan=4>Total</td> | <td colspan=4>Total</td> | ||
<td>💲29,829</td> | <td>💲29,829</td> | ||
</tr> | </tr> | ||
− | |||
− | |||
− | |||
− | |||
</table> | </table> | ||
− | + | <noinclude> | |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]] | |
− | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Harvest and reuse]] | |
− | + | </noinclude> | |
− | [[ |
Engineers estimate for installation of one 1,500 gallon aboveground corrugated steel storage tank
Link to this table
ITEM | ESTIMATED QUANTITY | UNIT | UNIT PRICE | TOTAL COST |
---|---|---|---|---|
RAINWATER HARVESTING PACKAGE: 1,500 GALLON ABOVE GROUND CORRUGATED STEEL TANK AND ASSOCIATED FITTINGS & ACCESSORIES, INCLUDING PUMP AND FILTER SYSTEM. (72" DIA. X 9') | 1 | EA | 💲15,000 | 💲15,000 |
REINFORCED CONCRETE FOUNDATION ON IMPROVED SUBGRADE | 1 | EA | 💲2,500 | 💲2,500 |
REMOVE EXISTING GUTTER | 60 | LF | 💲9 | 💲540 |
5" BOX GUTTER | 222 | LF | 💲10 | 💲2,220 |
GUTTER DOWNSPOUTS | 45 | LF | 💲15 | 💲675 |
6" HDPE PIPE | 110 | LF | 💲30 | 💲3,300 |
RODENT GUARD | 1 | EA | 💲350 | 💲350 |
SCOUR STOP MAT | 32 | SF | 💲30 | 💲960 |
EROSION CONTROL BLANKET | 14 | SY | 💲20 | 💲284 |
ENGINEER'S REPORT | 1 | EA | 💲2,500 | 💲2,500 |
O&M GUIDELINES | 1 | EA | 💲1,500 | 💲1,500 |
Total | 💲29,829 |