m
m
 
(24 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{alert|This page is under review through October, 2017|alert-under-review}}
+
[[File:Pdf image.png|100px|thumb|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Overview_for_infiltration_-_Minnesota_Stormwater_Manual_July_2022.pdf Download pdf]</font size>]]
 
+
[[File:General information page image.png|right|100px|alt=image]]
 
[[file:Schematic of practices.png|300px|thumb|alt=schematic of infiltration practices|<font size=3>Schematic illustrating A)infiltration trench, B) underground infiltration, C) infiltration basin, and D) dry well.</font size>]]
 
[[file:Schematic of practices.png|300px|thumb|alt=schematic of infiltration practices|<font size=3>Schematic illustrating A)infiltration trench, B) underground infiltration, C) infiltration basin, and D) dry well.</font size>]]
  
Stormwater [[Glossary#I|infiltration]] practices capture and temporarily store stormwater before allowing it to infiltrate into the soil. Infiltration practices are applicable to sites with naturally permeable soils and a suitable distance to the seasonally high [[Glossary#G|groundwater]] table, bedrock or other impermeable layer. They may be used in residential and other urban settings where elevated [[Glossary#R|runoff]] volumes, pollutant loads, and runoff temperatures are a concern. In applications where the stormwater runoff has a particularly high pollutant load or where the soils have very high infiltration rates, a significant amount of [[Pretreatment|pretreatment]] should be provided to protect the groundwater quality. Sources that include potential stormwater [[Potential stormwater hotspots|hotsposts]] (PSH) should not be introduced to infiltration areas. Infiltration should be avoided in areas with [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_contaminated_soils_and_groundwater contaminated soils or groundwater].
+
Stormwater <span title="Infiltration Best Management Practices (BMPs) treat urban stormwater runoff as it flows through a filtering medium and into underlying soil, where it may eventually percolate into groundwater. The filtering media is typically coarse-textured and may contain organic material, as in the case of bioinfiltration BMPs."> [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices '''infiltration''']</span> practices capture and temporarily store stormwater before allowing it to infiltrate into the soil. Infiltration practices are applicable to sites with naturally permeable soils and a suitable distance to the seasonally high groundwater table, bedrock or other impermeable layer. They may be used in residential and other urban settings where elevated runoff volumes, pollutant loads, and runoff temperatures are a concern. Stormwater runoff having high pollutant loads should receive a significant amount of <span title="Pretreatment reduces maintenance and prolongs the lifespan of structural stormwater BMPs by removing trash, debris, organic materials, coarse sediments, and associated pollutants prior to entering structural stormwater BMPs. Implementing pretreatment devices also improves aesthetics by capturing debris in focused or hidden areas. Pretreatment practices include settling devices, screens, and pretreatment vegetated filter strips."> [https://stormwater.pca.state.mn.us/index.php?title=Pretreatment '''pretreatment''']</span> to protect the groundwater quality, particularly if soil infiltration rates are high (e.g. [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates HSG A soils]). Runoff from potential <span title="Stormwater Hotspots (PSHs) are activities or practices that have the potential to produce relatively high levels of stormwater pollutants"> '''[https://stormwater.pca.state.mn.us/index.php?title=Potential_stormwater_hotspots stormwater hotspots]'''</span> (PSH) should not be introduced to infiltration areas. Infiltration should be avoided in areas with [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_contaminated_soils_and_groundwater contaminated soils or groundwater].
  
Design variants discussed on this page include the infiltration basin, the infiltration trench, the dry well and the underground infiltration system. To see overviews for other infiltration practices, see the following sections.
+
Design variants discussed on this page include the <span title="Infiltration basins, infiltration trenches, dry wells, and underground infiltration systems capture and temporarily store stormwater before allowing it to infiltrate into the soil. As the stormwater penetrates the underlying soil, chemical, biological and physical processes remove pollutants and delay peak stormwater flows."> [https://stormwater.pca.state.mn.us/index.php?title=Infiltration '''infiltration basin''']</span>, the infiltration trench, the dry well and the underground infiltration system. To see overviews for other infiltration practices, see the following sections.
 
*[[Overview for bioretention]]
 
*[[Overview for bioretention]]
 
*[[Overview for permeable pavement]]
 
*[[Overview for permeable pavement]]
Line 15: Line 15:
  
 
==Function within stormwater treatment train==
 
==Function within stormwater treatment train==
The infiltration practices discussed on this page may be located at the end of the [[Using the treatment train approach to BMP selection|treatment train]] or they can be designed as off-line configurations where the [[Glossary#W|water quality volume]] is diverted to the infiltration practice. In any case, the practice may be applied as part of a stormwater management system to achieve one or more of the following objectives:
+
The infiltration practices discussed on this page may be located at the end of the <span title="Multiple BMPs that work together to remove pollutants utilizing combinations of hydraulic, physical, biological, and chemical methods"> [https://stormwater.pca.state.mn.us/index.php?title=Using_the_treatment_train_approach_to_BMP_selection '''treatment train''']</span> or they can be designed as <span title="A stormwater system in which part or all of the stormwater runoff is diverted from the primary treatment practice. Partial diversion is employed for bypass runoff, which is runoff in excess of the designed treatment volume of the practice. Full offline diversion is employed as a temporary means to divert all runoff from a stormwater practice, typically to avoid erosion of exposed soil or establishment of vegetation."> '''offline'''</span> configurations where the <span title="The volume of water that is treated by a BMP."> [https://stormwater.pca.state.mn.us/index.php?title=Water_quality_criteria '''Water Quality Volume''']</span> is diverted to the infiltration practice. In any case, the practice may be applied as part of a stormwater management system to achieve one or more of the following objectives:
 
*reduce stormwater pollutants
 
*reduce stormwater pollutants
 
*increase groundwater recharge
 
*increase groundwater recharge
 
*decrease runoff peak flow rates
 
*decrease runoff peak flow rates
 
*decrease the volume of stormwater runoff
 
*decrease the volume of stormwater runoff
*preserve base flow in streams
+
*preserve <span title="Baseflow (also called drought flow, groundwater recession flow, low flow, low-water flow, low-water discharge and sustained or fair-weather runoff) is the portion of streamflow delayed shallow subsurface flow".> '''baseflow'''</span> in streams
*reduce [[Glossary#T|thermal impacts]] of runoff
+
*reduce thermal impacts of runoff
  
 
==MPCA permit applicability==
 
==MPCA permit applicability==
One of the goals of this Manual is to facilitate understanding of and compliance with the [http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit MPCA General Stormwater Permit for Construction Activity (MN R100001)], commonly called the Construction General Permit (CGP), which includes design and performance standards for permanent stormwater management systems. These standards must be applied in all projects in which at least 1 acre of new impervious area is being created, and the permit stipulates certain standards for various categories of stormwater management practices.
+
One of the goals of this Manual is to facilitate understanding of and compliance with the [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program General Stormwater Permit for Construction Activity (MN R100001)], commonly called the Construction General Permit (CGP), which includes design and performance standards for permanent stormwater management systems. These standards must be applied in all projects in which at least 1 acre of new impervious area is being created, and the permit stipulates certain standards for various categories of stormwater management practices.
  
For regulatory purposes, infiltration practices fall under the “Infiltration / Filtration” category described in Part III.D.1. of [http://stormwater.pca.state.mn.us/index.php/Construction_stormwater_permit the permit]. If used in combination with other practices, credit for combined stormwater treatment can be given. Due to the statewide prevalence of the MPCA permit, design guidance in this section is presented with the assumption that the permit does apply. Also, although it is expected that in many cases infiltration will be used in combination with other practices, standards are described for the case in which it is a stand alone practice.
+
For regulatory purposes, infiltration practices fall under Infiltration systems in the permit. If used in combination with other practices, credit for combined stormwater treatment can be given. Due to the statewide prevalence of the MPCA permit, design guidance in this section is presented with the assumption that the permit does apply. Also, although it is expected that in many cases infiltration will be used in combination with other practices, standards are described for the case in which it is a stand alone practice.
  
 
The following terms are thus used in the text to distinguish various levels of stormwater pond design guidance.
 
The following terms are thus used in the text to distinguish various levels of stormwater pond design guidance.
Line 36: Line 36:
 
'''RECOMMENDED:''' Indicates design guidance that is helpful for infiltration performance but not critical to the design.
 
'''RECOMMENDED:''' Indicates design guidance that is helpful for infiltration performance but not critical to the design.
  
Of course, there are situations, particularly retrofit projects, in which an infiltration facility is constructed without being subject to the conditions of the MPCA permit. While compliance with the permit is not required in these cases, the standards it establishes can provide valuable design guidance to the user. It is also important to note that additional and potentially more stringent design requirements may apply for a particular [[Glossary#I|infiltration]] facility, depending on where it is situated both jurisdictionally and within the surrounding landscape.
+
Of course, there are situations, particularly retrofit projects, in which an infiltration facility is constructed without being subject to the conditions of the MPCA permit. While compliance with the permit is not required in these cases, the standards it establishes can provide valuable design guidance to the user. It is also important to note that additional and potentially more stringent design requirements may apply for a particular infiltration facility, depending on where it is situated both jurisdictionally and within the surrounding landscape.
  
 
{{alert|There is some concern that underground infiltration systems and dry wells meet the U.S. Environmental Protection Agency (EPA) definition of a [http://water.epa.gov/type/groundwater/uic/class5/index.cfm Class V injection well]. Class V injection wells are defined as any bored, drilled, or driven shaft, or dug hole that is deeper than its widest surface dimension, or an improved sinkhole, or a subsurface fluid distribution system (from U.S. Environmental Protection Agency, June 2003). Please consult [https://www.epa.gov/uic/class-v-wells-injection-non-hazardous-fluids-or-above-underground-sources-drinking-water EPA] with questions on the applicability of Class V injection well rules.|alert-info}}
 
{{alert|There is some concern that underground infiltration systems and dry wells meet the U.S. Environmental Protection Agency (EPA) definition of a [http://water.epa.gov/type/groundwater/uic/class5/index.cfm Class V injection well]. Class V injection wells are defined as any bored, drilled, or driven shaft, or dug hole that is deeper than its widest surface dimension, or an improved sinkhole, or a subsurface fluid distribution system (from U.S. Environmental Protection Agency, June 2003). Please consult [https://www.epa.gov/uic/class-v-wells-injection-non-hazardous-fluids-or-above-underground-sources-drinking-water EPA] with questions on the applicability of Class V injection well rules.|alert-info}}
Line 76: Line 76:
  
 
==Special receiving waters suitability==
 
==Special receiving waters suitability==
The BMP design restrictions for special watersheds table below provides guidance regarding the use of infiltration practices in areas upstream of [[Special waters and other sensitive receiving waters|special receiving waters]]. This table is an abbreviated version of a larger table in which other BMP groups are similarly evaluated. The corresponding information about other BMPs is presented in the respective sections of this Manual.
+
The BMP design restrictions for special watersheds table below provides guidance regarding the use of infiltration practices in areas upstream of <span title="Waters with qualities that warrant extra protection"> [https://stormwater.pca.state.mn.us/index.php?title=Construction_stormwater_program#Special_Waters_and_Impaired_Waters '''special receiving waters''']</span>.
  
{{:Infiltration BMP design restrictions for special watersheds}}
+
{{:Infiltration and filtration bmp design restrictions for special waters and watersheds}}
  
 
==Cold climate suitability==
 
==Cold climate suitability==
Infiltration practices should remain effective water quality improvement systems for many years, even during winter conditions, if designed and constructed properly and it has been shown that hydraulic efficiency and infiltration rates can remain at levels used for design sizing. However, in cold climates, some special considerations are HIGHLY RECOMMENDED for surface systems to ensure sustained functionality and limit the damage freezing temperatures and snow and ice removal may cause.
+
[[File:Snow plowed and piled in parking lot.jpg|thumb|300px|alt=Photo showing Snow plowed and piled in parking lot|<font size=3>Snow plowed and piled in parking lot. Consideration should be given in locating these "snow dumps", since they will contribute a significant amount of stormwater runoff.]]</font size>
  
One concern with infiltration in cold weather is the ice that forms both over the top of the practice and within the soil structure and can completely stop infiltration. To limit the effect of this problem, it is HIGHLY RECOMMENDED that the facility be actively inspected to ensure that it is properly drawing down before it freezes in the late fall. Adequate drawdown can be determined using one of the several field assessment techniques such as those recommended by the University of Minnesota Extension ([http://stormwaterbook.safl.umn.edu/infiltration-practices see section on Assessment]). If it is determined that stormwater runoff is not infiltrating prior to hard freeze, the BMP should be placed offline for correction in the spring.
+
Infiltration practices should remain effective water quality improvement systems for many years, even during winter conditions, if designed and constructed properly and it has been shown that hydraulic efficiency and <span title="The infiltration rate is the velocity or speed at which water enters into the soil"> '''infiltration rates'''</span> can remain at levels used for design sizing. However, in cold climates, some special considerations are HIGHLY RECOMMENDED for surface systems to ensure sustained functionality and limit the damage freezing temperatures and snow and ice removal may cause.
 +
 
 +
One concern with infiltration in cold weather is the ice that forms both over the top of the practice and within the soil structure, which can completely stop infiltration. To limit the effect of this problem, it is HIGHLY RECOMMENDED that the facility be actively inspected to ensure that it is properly drawing down before it freezes in the late fall. Adequate drawdown can be determined using one of the several field assessment techniques such as those recommended by the University of Minnesota Extension ([http://stormwaterbook.safl.umn.edu/infiltration-practices see section on Assessment]). If it is determined that stormwater runoff is not infiltrating prior to hard freeze, the BMP should be placed offline for correction in the spring.
  
 
Even if the infiltration properties of an infiltration practice are marginal for snowmelt runoff during the period of deep frost in the winter, the storage available in the facility will provide water quality benefit if it is dry entering the melt season. Routing the first highly-soluble portions of snowmelt (first flush) to an infiltration facility provides the opportunity for soil treatment (such as filtration, adsorption, microbial activity) of these soluble pollutants. Again, however, flow originating in an industrial area, a high traffic area where large amounts of salt are added, or another PSH should be diverted away from infiltration systems if pretreatment features have not been properly designed to handle such an increase in loading.
 
Even if the infiltration properties of an infiltration practice are marginal for snowmelt runoff during the period of deep frost in the winter, the storage available in the facility will provide water quality benefit if it is dry entering the melt season. Routing the first highly-soluble portions of snowmelt (first flush) to an infiltration facility provides the opportunity for soil treatment (such as filtration, adsorption, microbial activity) of these soluble pollutants. Again, however, flow originating in an industrial area, a high traffic area where large amounts of salt are added, or another PSH should be diverted away from infiltration systems if pretreatment features have not been properly designed to handle such an increase in loading.
 
Proprietary, sub-grade infiltration systems provide an alternative to standard surface based systems. Essentially, these systems provide an insulated location for pre-treated snowmelt to be stored and slowly infiltrated, or simply filtered and drained away if groundwater sensitivity is an issue. The insulating value of these systems adds to their appeal as low land consumption alternatives to ponds and surface infiltration basins.
 
Proprietary, sub-grade infiltration systems provide an alternative to standard surface based systems. Essentially, these systems provide an insulated location for pre-treated snowmelt to be stored and slowly infiltrated, or simply filtered and drained away if groundwater sensitivity is an issue. The insulating value of these systems adds to their appeal as low land consumption alternatives to ponds and surface infiltration basins.
  
For all BMP’s it is HIGHLY RECOMMENDED that snow and ice removal plans including predetermined locations for stockpiling be determined prior to or during the design process. Infiltration features cannot be used for significant snow storage areas as debris build-up, plant damage, and lower infiltration rates are likely to occur. Some snow storage unavoidable when BMP’s are adjacent to areas where snow removal is required but it is critical that the property owner and snow and ice removal contractor have identified other areas for large scale snow storage.
+
For all BMPs it is HIGHLY RECOMMENDED that snow and ice removal plans including predetermined locations for stockpiling be determined prior to or during the design process. Infiltration features cannot be used for significant snow storage areas as debris build-up, plant damage, and lower infiltration rates are likely to occur. Some snow storage unavoidable when BMPs are adjacent to areas where snow removal is required but it is critical that the property owner and snow and ice removal contractor have identified other areas for large scale snow storage.
  
 
Excessive deicing agents have the potential to create a [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots hot spot] in some locations that could lead to reduced infiltration rates or concentrations that exceed surface water or groundwater standards. Locations such as busy intersections on slopes, parking garage ramps or on walkways near the entrances of commercial buildings are likely to be heavily treated with deicing agents to avoid slip and falls or vehicle collisions.  This should be taken into consideration when siting any infiltration BMP.
 
Excessive deicing agents have the potential to create a [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots hot spot] in some locations that could lead to reduced infiltration rates or concentrations that exceed surface water or groundwater standards. Locations such as busy intersections on slopes, parking garage ramps or on walkways near the entrances of commercial buildings are likely to be heavily treated with deicing agents to avoid slip and falls or vehicle collisions.  This should be taken into consideration when siting any infiltration BMP.
Line 95: Line 97:
  
 
==Water quantity treatment==
 
==Water quantity treatment==
The amount of stormwater volume infiltrated depends on the design variant selected. Smaller infiltration practices (e.g. infiltration trenches) should either be designed off-line using a flow diversion, or designed to safely pass large storm flows while still protecting the infiltration area. In limited cases (e.g. extremely permeable soils), these smaller infiltration practices can accommodate the [[Glossary#C|channel protection volume]], V<sub>cp</sub>, in either an off- or on-line configuration.
+
The amount of stormwater volume infiltrated depends on the design variant selected. Smaller infiltration practices (e.g. infiltration trenches) should either be designed off-line using a flow diversion, or designed to safely pass large storm flows while still protecting the infiltration area. In limited cases (e.g. extremely permeable soils), these smaller infiltration practices can accommodate the [https://stormwater.pca.state.mn.us/index.php?title=Unified_sizing_criteria channel protection volume], V<sub>cp</sub>, in either an off- or on-line configuration.
<p>In general, supplemental stormwater practices will be necessary to satisfy channel and flood protection requirements when smaller infiltration practices are used. However, these practices can help reduce detention requirements for a site through volume reduction. </p>
+
 
<p>Due to their size, the larger infiltration practices (e.g. infiltration basins and underground infiltration systems) have the potential to provide greater water quantity benefits. Surcharge storage above the practice bottom is available for detention. Outlet structures can be sized to partially or fully accommodate larger storm peak discharge control while allowing the volume below the outlet to infiltrate.</p>
+
In general, supplemental stormwater practices will be necessary to satisfy channel and flood protection requirements when smaller infiltration practices are used. However, these practices can help reduce detention requirements for a site through volume reduction.
 +
 
 +
Due to their size, the larger infiltration practices (e.g. infiltration basins and underground infiltration systems) have the potential to provide greater water quantity benefits. Surcharge storage above the practice bottom is available for detention. Outlet structures can be sized to partially or fully accommodate larger storm peak discharge control while allowing the volume below the outlet to infiltrate.
  
 
==Water quality treatment==
 
==Water quality treatment==
 
Infiltration practices can remove a wide variety of stormwater pollutants through chemical and bacterial degradation, sorption, and filtering. Surface water load reductions are also realized by virtue of the reduction in runoff volume.
 
Infiltration practices can remove a wide variety of stormwater pollutants through chemical and bacterial degradation, sorption, and filtering. Surface water load reductions are also realized by virtue of the reduction in runoff volume.
<p>There are few data available demonstrating the load reductions or outflow concentrations of larger-scale infiltration practices such as infiltration trenches. Similarly, few sampling programs collect infiltrating water that flows through an infiltration system.</p>
 
<p>For properly designed, operated, and maintained infiltration systems, all water routed into them should be “removed” from stormwater flow, resulting in 100 percent efficiency relative to volume and pollutant reduction. For this reason, any infiltration BMP performance table should show all 100 percent entries for that portion of stormwater entering the infiltration system. This logic assumes that stormwater is the beneficiary of any infiltration system, but ignores the fact that pollution, if any remains after the internal workings of the infiltration BMP itself (see later discussion in this section), is being transferred into the shallow groundwater system. Good monitoring data on the groundwater impact of infiltrating stormwater are rare, but there are efforts underway today to document this, so future Manual revisions should be able to include some data updates.</p>
 
  
Properly designed infiltration systems discussed later in this section will accommodate a design volume based on the required [[Glossary#W|water quality volume]]. Excess water must be by-passed and diverted to another BMP so that the design infiltration occurs within 48 hours if under state regulation, or generally within 72 hours under certain local and watershed regulations. In no case should the by-passed volume be included in the pollutant removal calculation.
+
There are few data available demonstrating the load reductions or outflow concentrations of larger-scale infiltration practices such as infiltration trenches. Similarly, few sampling programs collect infiltrating water that flows through an infiltration system.
<p>Data that are reported in performance literature for infiltration systems, unless reporting 100 percent effectiveness for surface water or documenting outflow water downward, are not accurately representing behavior, or are representing the excess flow (overflow) from a system. Design specifications in the following sections should prevent putting contaminated runoff and excess water beyond that which will infiltrate within the given time frame. Any runoff containing toxic material or excess volume that cannot infiltrate should be diverted away from the infiltration system and reported as inflow to another treatment device.</p>
+
 
<p>Follow guidance and carefully use of infiltration BMPs to make sure they are not transporting highly loaded or toxic contaminants into the groundwater system. These sections address the pollution remediation processes at work in infiltration systems to reduce or totally remove pollutants that move through them. However, extreme caution must be exercised and serious planning undertaken to assure that no highly contaminating material is routed into these BMPs. Of particular concern are toxic organics (gasoline, solvents) and high levels of chloride.</p>
+
For properly designed, operated, and maintained infiltration systems, all water routed into them should be “removed” from stormwater flow, resulting in 100 percent efficiency relative to volume and pollutant reduction. For this reason, any infiltration BMP performance table should show all 100 percent entries for that portion of stormwater entering the infiltration system. This logic assumes that stormwater is the beneficiary of any infiltration system, but ignores the fact that pollution, if any remains after the internal workings of the infiltration BMP itself (see later discussion in this section), is being transferred into the shallow groundwater system. See [[Surface water and groundwater quality impacts from stormwater infiltration]].
<p>The [[CADD images for individual best management practices|drawings]] section contains details on how design and operations can either raise or lower the expected level of performance for infiltration BMPs.</p>
+
 
 +
Properly designed infiltration systems discussed later in this section will accommodate a design volume based on the required water quality volume. Excess water must be <span title="Stormwater runoff in excess of the design flow, which is diverted around a stormwater structure"> '''bypassed'''</span> and diverted to another BMP so that the design infiltration occurs within 48 hours if under state regulation, or generally within 72 hours under certain local and watershed regulations. In no case should the bypassed volume be included in the pollutant removal calculation.
 +
 
 +
Data that are reported in performance literature for infiltration systems, unless reporting 100 percent effectiveness for surface water or documenting outflow water downward, are not accurately representing behavior, or are representing the excess flow (overflow) from a system. Design specifications should prevent putting contaminated runoff and excess water beyond that which will infiltrate within the given time frame. Any runoff containing toxic material or excess volume that cannot infiltrate should be diverted away from the infiltration system and reported as inflow to another treatment device.
 +
 
 +
{{:Median pollutant removal percentages for BMPs}}
  
 
==Limitations==
 
==Limitations==
Line 121: Line 128:
 
<p>As noted in various sections, discussion of BMP selection, the benefits associated with infiltration BMPs should only be accrued based on the amount of water actually passing through the BMP. Excess runoff beyond that designed for the BMP should not be routed through the system because of the potential for hydraulic and particulate over-loading, both of which will adversely impact the life and operation of the BMP. For example, an infiltration device designed to treat the first 0.5 inch of runoff from a fully impervious surface will catch about 30 percent of the volume of runoff in the Twin Cities. This means that 70 percent of the runoff volume should be routed around the filtration system and will not be subject to the removals reflected in the above tables. Attributing removal to all runoff just because a BMP is in place in a drainage system is not a legitimate claim.</p>
 
<p>As noted in various sections, discussion of BMP selection, the benefits associated with infiltration BMPs should only be accrued based on the amount of water actually passing through the BMP. Excess runoff beyond that designed for the BMP should not be routed through the system because of the potential for hydraulic and particulate over-loading, both of which will adversely impact the life and operation of the BMP. For example, an infiltration device designed to treat the first 0.5 inch of runoff from a fully impervious surface will catch about 30 percent of the volume of runoff in the Twin Cities. This means that 70 percent of the runoff volume should be routed around the filtration system and will not be subject to the removals reflected in the above tables. Attributing removal to all runoff just because a BMP is in place in a drainage system is not a legitimate claim.</p>
  
{{alert|It is ''REQUIRED'' that some form of pre-treatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.|alert-danger}}
+
{{alert|It is ''REQUIRED'' that some form of pretreatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.|alert-danger}}
  
 
<noinclude>
 
<noinclude>
 +
 
==Related pages==
 
==Related pages==
 +
*[http://stormwater.pca.state.mn.us/index.php/Infiltration Infiltration portal]
 +
 
*[[Overview for infiltration]]
 
*[[Overview for infiltration]]
 
*[[BMPs for stormwater infiltration|Types of infiltration]]  
 
*[[BMPs for stormwater infiltration|Types of infiltration]]  
 
*[[Design criteria for infiltration]]
 
*[[Design criteria for infiltration]]
 
*[[Construction specifications for infiltration]]  
 
*[[Construction specifications for infiltration]]  
*[[Operation and maintenance of infiltration]]
+
*[[Operation and maintenance of stormwater infiltration practices]]
 
*[[Assessing the performance of infiltration]]
 
*[[Assessing the performance of infiltration]]
 
*[[Calculating credits for infiltration]]
 
*[[Calculating credits for infiltration]]
Line 142: Line 152:
 
*Cold climate considerations for infiltration practices - See [http://stormwater.pca.state.mn.us/index.php/Cold_climate_impact_on_runoff_management#Infiltration], [http://stormwater.pca.state.mn.us/index.php/Cold_climate_impact_on_runoff_management#Infiltration_practices]
 
*Cold climate considerations for infiltration practices - See [http://stormwater.pca.state.mn.us/index.php/Cold_climate_impact_on_runoff_management#Infiltration], [http://stormwater.pca.state.mn.us/index.php/Cold_climate_impact_on_runoff_management#Infiltration_practices]
  
[[Category:BMP overview]]
+
[[Category:Level 3 - Best management practices/Guidance and information/BMP overview]]
[[Category:Infiltration practices]]
 
 
</noinclude>
 
</noinclude>

Latest revision as of 19:29, 11 August 2022

image
schematic of infiltration practices
Schematic illustrating A)infiltration trench, B) underground infiltration, C) infiltration basin, and D) dry well.

Stormwater infiltration practices capture and temporarily store stormwater before allowing it to infiltrate into the soil. Infiltration practices are applicable to sites with naturally permeable soils and a suitable distance to the seasonally high groundwater table, bedrock or other impermeable layer. They may be used in residential and other urban settings where elevated runoff volumes, pollutant loads, and runoff temperatures are a concern. Stormwater runoff having high pollutant loads should receive a significant amount of pretreatment to protect the groundwater quality, particularly if soil infiltration rates are high (e.g. HSG A soils). Runoff from potential stormwater hotspots (PSH) should not be introduced to infiltration areas. Infiltration should be avoided in areas with contaminated soils or groundwater.

Design variants discussed on this page include the infiltration basin, the infiltration trench, the dry well and the underground infiltration system. To see overviews for other infiltration practices, see the following sections.

For discussions of how these practices differ or are similar to other infiltration practices, see Bioretention terminology and BMPs for stormwater infiltration.

Green Infrastructure: infiltration systems are designed to mimic a site's natural hydrology

Function within stormwater treatment train

The infiltration practices discussed on this page may be located at the end of the treatment train or they can be designed as offline configurations where the Water Quality Volume is diverted to the infiltration practice. In any case, the practice may be applied as part of a stormwater management system to achieve one or more of the following objectives:

  • reduce stormwater pollutants
  • increase groundwater recharge
  • decrease runoff peak flow rates
  • decrease the volume of stormwater runoff
  • preserve baseflow in streams
  • reduce thermal impacts of runoff

MPCA permit applicability

One of the goals of this Manual is to facilitate understanding of and compliance with the General Stormwater Permit for Construction Activity (MN R100001), commonly called the Construction General Permit (CGP), which includes design and performance standards for permanent stormwater management systems. These standards must be applied in all projects in which at least 1 acre of new impervious area is being created, and the permit stipulates certain standards for various categories of stormwater management practices.

For regulatory purposes, infiltration practices fall under Infiltration systems in the permit. If used in combination with other practices, credit for combined stormwater treatment can be given. Due to the statewide prevalence of the MPCA permit, design guidance in this section is presented with the assumption that the permit does apply. Also, although it is expected that in many cases infiltration will be used in combination with other practices, standards are described for the case in which it is a stand alone practice.

The following terms are thus used in the text to distinguish various levels of stormwater pond design guidance.

REQUIRED: Indicates design standards stipulated by the MPCA Permit (or other consistently applicable regulations).

HIGHLY RECOMMENDED: Indicates design guidance that is extremely beneficial or necessary for proper functioning of the infiltration practice, but is not specifically required by the MPCA permit.

RECOMMENDED: Indicates design guidance that is helpful for infiltration performance but not critical to the design.

Of course, there are situations, particularly retrofit projects, in which an infiltration facility is constructed without being subject to the conditions of the MPCA permit. While compliance with the permit is not required in these cases, the standards it establishes can provide valuable design guidance to the user. It is also important to note that additional and potentially more stringent design requirements may apply for a particular infiltration facility, depending on where it is situated both jurisdictionally and within the surrounding landscape.

Information: There is some concern that underground infiltration systems and dry wells meet the U.S. Environmental Protection Agency (EPA) definition of a Class V injection well. Class V injection wells are defined as any bored, drilled, or driven shaft, or dug hole that is deeper than its widest surface dimension, or an improved sinkhole, or a subsurface fluid distribution system (from U.S. Environmental Protection Agency, June 2003). Please consult EPA with questions on the applicability of Class V injection well rules.

Retrofit suitability

Applications for infiltration trenches, dry well, underground infiltration, and infiltration basins
Residential Yes
Commercial Yes
Ultra-urban Yes except for infiltration basins, which are limited
Industrial Yes1
Highway/road 2
Recreational Yes
1 Unless the infiltration practice is located in an industrial area with exposed significant materials or from vehicle fuelling and maintenance areas. Infiltration BMPs are PROHIBITED in these areas; 2 Yes for infiltration trench, limited for underground infiltration and infiltration basin, no for dry well
  • Infiltration trench: The narrow and versatile shape of infiltration trenches makes them well suited for retrofit projects. For example, infiltration trenches can be situated along the margin or perimeter of a developed site or roadway in many cases. They are particularly desirable as retrofit practices in watersheds or catchments that are targeting volume reduction practices to help minimize channel erosion.
  • Dry well: Similar to infiltration trenches, the narrow and versatile shape of dry wells makes them well suited for most retrofit projects. However, dry wells are not well suited as retrofits for highway/road applications because of their small size and accessibility concerns.
  • Underground infiltration systems: In settings where underground infiltration systems can be easily accessed for maintenance, they are ideal for retrofit situations. Another potential concern is fitting these systems, which can require significant space, into land uses where underground utilities are encountered.
  • Infiltration basins: If adequate space exists, infiltration basins are suitable for retrofit applications. However, space considerations often limit their use in ultra-urban and highway/road settings.
Warning: Use of infiltration practices is PROHIBITED in the CGP for treatment of runoff from industrial areas with exposed significant materials or from vehicle fueling and maintenance areas.

Generally, infiltration should not be used to treat runoff from manufacturing or industrial sites or other areas with high pollutant concentrations unless correspondingly high levels of pretreatment are provided.

Special receiving waters suitability

The BMP design restrictions for special watersheds table below provides guidance regarding the use of infiltration practices in areas upstream of special receiving waters.

Infiltration and filtration bmp1 design restrictions for special waters and watersheds. See also Sensitive waters and other receiving waters.
Link to this table

BMP Group receiving water
A Lakes B Trout Waters C Drinking Water2 D Wetlands E Impaired Waters
Infiltration RECOMMENDED RECOMMENDED NOT RECOMMENDED if potential stormwater pollution sources evident RECOMMENDED RECOMMENDED unless target TMDL pollutant is a soluble nutrient or chloride
Filtration Some variations NOT RECOMMENDED due to poor phosphorus removal, combined with other treatments RECOMMENDED RECOMMENDED ACCEPTABLE RECOMMENDED for non-nutrient impairments

1Filtration practices include green roofs, bmps with an underdrain, or other practices that do not infiltrate water and rely primarily on filtration for treatment.
2 Applies to groundwater drinking water source areas only; use the lakes category to define BMP design restrictions for surface water drinking supplies


Cold climate suitability

Photo showing Snow plowed and piled in parking lot
Snow plowed and piled in parking lot. Consideration should be given in locating these "snow dumps", since they will contribute a significant amount of stormwater runoff.

Infiltration practices should remain effective water quality improvement systems for many years, even during winter conditions, if designed and constructed properly and it has been shown that hydraulic efficiency and infiltration rates can remain at levels used for design sizing. However, in cold climates, some special considerations are HIGHLY RECOMMENDED for surface systems to ensure sustained functionality and limit the damage freezing temperatures and snow and ice removal may cause.

One concern with infiltration in cold weather is the ice that forms both over the top of the practice and within the soil structure, which can completely stop infiltration. To limit the effect of this problem, it is HIGHLY RECOMMENDED that the facility be actively inspected to ensure that it is properly drawing down before it freezes in the late fall. Adequate drawdown can be determined using one of the several field assessment techniques such as those recommended by the University of Minnesota Extension (see section on Assessment). If it is determined that stormwater runoff is not infiltrating prior to hard freeze, the BMP should be placed offline for correction in the spring.

Even if the infiltration properties of an infiltration practice are marginal for snowmelt runoff during the period of deep frost in the winter, the storage available in the facility will provide water quality benefit if it is dry entering the melt season. Routing the first highly-soluble portions of snowmelt (first flush) to an infiltration facility provides the opportunity for soil treatment (such as filtration, adsorption, microbial activity) of these soluble pollutants. Again, however, flow originating in an industrial area, a high traffic area where large amounts of salt are added, or another PSH should be diverted away from infiltration systems if pretreatment features have not been properly designed to handle such an increase in loading. Proprietary, sub-grade infiltration systems provide an alternative to standard surface based systems. Essentially, these systems provide an insulated location for pre-treated snowmelt to be stored and slowly infiltrated, or simply filtered and drained away if groundwater sensitivity is an issue. The insulating value of these systems adds to their appeal as low land consumption alternatives to ponds and surface infiltration basins.

For all BMPs it is HIGHLY RECOMMENDED that snow and ice removal plans including predetermined locations for stockpiling be determined prior to or during the design process. Infiltration features cannot be used for significant snow storage areas as debris build-up, plant damage, and lower infiltration rates are likely to occur. Some snow storage unavoidable when BMPs are adjacent to areas where snow removal is required but it is critical that the property owner and snow and ice removal contractor have identified other areas for large scale snow storage.

Excessive deicing agents have the potential to create a hot spot in some locations that could lead to reduced infiltration rates or concentrations that exceed surface water or groundwater standards. Locations such as busy intersections on slopes, parking garage ramps or on walkways near the entrances of commercial buildings are likely to be heavily treated with deicing agents to avoid slip and falls or vehicle collisions. This should be taken into consideration when siting any infiltration BMP.

For bioinfiltration features, dry swales with check dams, and tree trenches, special considerations regarding snow and ice storage and plant maintenance are required. Plant selection is critical to ensure that the damaging effects of snow and ice removal do not severely impact plantings or seedings. Even a small amount of snow storage can break and uproot plants requiring additional maintenance in the spring. Woody trees and shrubs should be selected that can tolerate some salt spray from plowing operations.

Water quantity treatment

The amount of stormwater volume infiltrated depends on the design variant selected. Smaller infiltration practices (e.g. infiltration trenches) should either be designed off-line using a flow diversion, or designed to safely pass large storm flows while still protecting the infiltration area. In limited cases (e.g. extremely permeable soils), these smaller infiltration practices can accommodate the channel protection volume, Vcp, in either an off- or on-line configuration.

In general, supplemental stormwater practices will be necessary to satisfy channel and flood protection requirements when smaller infiltration practices are used. However, these practices can help reduce detention requirements for a site through volume reduction.

Due to their size, the larger infiltration practices (e.g. infiltration basins and underground infiltration systems) have the potential to provide greater water quantity benefits. Surcharge storage above the practice bottom is available for detention. Outlet structures can be sized to partially or fully accommodate larger storm peak discharge control while allowing the volume below the outlet to infiltrate.

Water quality treatment

Infiltration practices can remove a wide variety of stormwater pollutants through chemical and bacterial degradation, sorption, and filtering. Surface water load reductions are also realized by virtue of the reduction in runoff volume.

There are few data available demonstrating the load reductions or outflow concentrations of larger-scale infiltration practices such as infiltration trenches. Similarly, few sampling programs collect infiltrating water that flows through an infiltration system.

For properly designed, operated, and maintained infiltration systems, all water routed into them should be “removed” from stormwater flow, resulting in 100 percent efficiency relative to volume and pollutant reduction. For this reason, any infiltration BMP performance table should show all 100 percent entries for that portion of stormwater entering the infiltration system. This logic assumes that stormwater is the beneficiary of any infiltration system, but ignores the fact that pollution, if any remains after the internal workings of the infiltration BMP itself (see later discussion in this section), is being transferred into the shallow groundwater system. See Surface water and groundwater quality impacts from stormwater infiltration.

Properly designed infiltration systems discussed later in this section will accommodate a design volume based on the required water quality volume. Excess water must be bypassed and diverted to another BMP so that the design infiltration occurs within 48 hours if under state regulation, or generally within 72 hours under certain local and watershed regulations. In no case should the bypassed volume be included in the pollutant removal calculation.

Data that are reported in performance literature for infiltration systems, unless reporting 100 percent effectiveness for surface water or documenting outflow water downward, are not accurately representing behavior, or are representing the excess flow (overflow) from a system. Design specifications should prevent putting contaminated runoff and excess water beyond that which will infiltrate within the given time frame. Any runoff containing toxic material or excess volume that cannot infiltrate should be diverted away from the infiltration system and reported as inflow to another treatment device.

Median pollutant removal percentages for several stormwater BMPs. Sources. More detailed information and ranges of values can be found in other locations in this manual, as indicated in the table. NSD - not sufficient data. NOTE: Some filtration bmps, such as biofiltration, provide some infiltration. The values for filtration practices in this table are for filtered water.
Link to this table

Practice TSS TP PP DP TN Metals1 Bacteria Hydrocarbons
Infiltration2 3 3 3 3 3 3 3 3
Biofiltration and Tree trench/tree box with underdrain 80 link to table link to table link to table 50 35 95 80
Sand filter 85 50 85 0 35 80 50 80
Iron enhanced sand filter 85 65 or 746 85 40 or 606 35 80 50 80
Dry swale (no check dams) 68 link to table link to table link to table 35 80 0 80
Wet swale (no check dams) 35 0 0 0 15 35 35 NSD
Constructed wet ponds4, 5 84 50 or 685 84 8 or 485 30 60 70 80
Constructed wetlands 73 38 69 0 30 60 70 80
Permeable pavement (with underdrain) 74 41 74 0 NSD NSD NSD NSD
Green roofs 85 0 0 0 NSD NSD NSD NSD
Vegetated (grass) filter 68 0 0 0 NSD NSD NSD NSD
Harvest and reuse Removal is 100% for captured water that is infiltrated. For water captured and routed to another practice, use the removal values for that practice.

TSS=Total suspended solids, TP=Total phosphorus, PP=Particulate phosphorus, DP=Dissolved phosphorus, TN=Total nitrogen
1Data for metals is based on the average of data for zinc and copper
2BMPs designed to infiltrate stormwater runoff, such as infiltration basin/trench, bioinfiltration, permeable pavement with no underdrain, tree trenches with no underdrain, and BMPs with raised underdrains.
3Pollutant removal is 100 percent for the volume infiltrated, 0 for water bypassing the BMP. For filtered water, see values for other BMPs in the table.
4Dry ponds do not receive credit for volume or pollutant removal
5Removal is for Design Level 2. If an iron-enhanced pond bench is included, an additional 40 percent credit is given for dissolved phosphorus. Use the lower values if no iron bench exists and the higher value if an iron bench exists.
6Lower values are for Tier 1 design. Higher values are for Tier 2 design.


Limitations

The following general limitations should be recognized when considering installation of infiltration practices.

  • Limited monitoring data are available and field longevity is not well documented.
  • Failure can occur due to improper siting, design, construction and maintenance.
  • Systems are susceptible to clogging by sediment and organic debris
  • There is a risk of groundwater contamination depending on subsurface conditions, land use and aquifer susceptibility.
  • They are not ideal for stormwater runoff from land uses or activities with the potential for high sediment or pollutant loads.
  • They are not recommended for areas with steep slopes.

Please note that even though there are potential pollution and physical clogging problems with infiltration, it is one of the most important elements in the stormwater runoff treatment train. Fear of the limitations should not prevent well designed systems from being used.

As noted in various sections, discussion of BMP selection, the benefits associated with infiltration BMPs should only be accrued based on the amount of water actually passing through the BMP. Excess runoff beyond that designed for the BMP should not be routed through the system because of the potential for hydraulic and particulate over-loading, both of which will adversely impact the life and operation of the BMP. For example, an infiltration device designed to treat the first 0.5 inch of runoff from a fully impervious surface will catch about 30 percent of the volume of runoff in the Twin Cities. This means that 70 percent of the runoff volume should be routed around the filtration system and will not be subject to the removals reflected in the above tables. Attributing removal to all runoff just because a BMP is in place in a drainage system is not a legitimate claim.

Warning: It is REQUIRED that some form of pretreatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.


Related pages

This page was last edited on 11 August 2022, at 19:29.