(Created page with "<font size=3>'''Relative cost and effectiveness for common construction BMPs. Source: Kentucky Division of Water.'''</font size><br> Link to this Relative cost and effective...") |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 34: | Line 34: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | |||
+ | <noinclude> | ||
+ | [[category:Level 3 - General information, reference, tables, images, and archives/Tables/Construction stormwater]] | ||
+ | </noinclude> |
Relative cost and effectiveness for common construction BMPs. Source: Kentucky Division of Water.
Link to this table
Practice | Cost | Effectiveness |
---|---|---|
Limiting disturbed areas through phasing | Low | High |
Protected disturbed areas through mulching and revegetation | Low to moderate | Moderate to high |
Installing diversion around disturbed areas | Moderate | Moderate |
Sediment removal through detention of all site drainage | Moderate to high | Low to moderate |
Other structural controls to treat sediment-laden flow | High | Low |
This page was last edited on 3 August 2022, at 14:46.