Relative cost and effectiveness for common construction BMPs. Source: Kentucky Division of Water.
Link to this table
Practice | Cost | Effectiveness |
---|---|---|
Limiting disturbed areas through phasing | Low | High |
Protected disturbed areas through mulching and revegetation | Low to moderate | Moderate to high |
Installing diversion around disturbed areas | Moderate | Moderate |
Sediment removal through detention of all site drainage | Moderate to high | Low to moderate |
Other structural controls to treat sediment-laden flow | High | Low |
This page was last edited on 3 August 2022, at 14:46.