==Stormwater pond assessment procedure==
 
==Stormwater pond assessment procedure==
[[File:Picture of a wet pond 2.jpg|right|400 px|alt=This photo shows a wet detention pond]]
+
[[File:Picture of a wet pond 2.jpg|right|thumb|300 px|alt=This photo shows a wet detention pond|<font size=2>Photo of a wet detention pond</font size>]]
[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_ponds Stormwater ponds] are common treatment practices that have been installed in communities for years. The municipal separate storm sewer system [https://stormwater.pca.state.mn.us/index.php?title=MS4_General_Permit (MS4) General Permit] requires permittees to develop procedures and a schedule to determining the total suspended solids (TSS) and total phosphorus (TP) treatment effectiveness of all municipally owned/operated stormwater ponds ([https://stormwater.pca.state.mn.us/index.php?title=MS4_PART_III.STORMWATER_POLLUTION_PREVENTION_PROGRAM_(SWPPP) MS4 General Permit Part III.D.6.d.]). The schedule to assess ponds can extend beyond the current [https://stormwater.pca.state.mn.us/index.php?title=MS4_General_Permit MS4 General Permit] term. The schedule must be based on measurable goals and priorities that you have established for your community.  
+
[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_ponds Stormwater ponds] are common treatment practices that have been installed in communities for years. The municipal separate storm sewer system [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_Program_for_Municipal_Separate_Storm_Sewer_Systems_(MS4) (MS4) General Permit] requires permittees to develop procedures and a schedule to determining the total suspended solids (TSS) and total phosphorus (TP) treatment effectiveness of all municipally owned/operated stormwater ponds (MS4 General Permit Part III.D.6.d.). The schedule to assess ponds can extend beyond the current MS4 General Permit term. The schedule must be based on measurable goals and priorities that you have established for your community.  
  
 
==Stormwater pond sediment excavation and removal activities==
 
==Stormwater pond sediment excavation and removal activities==
[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_ponds Maintenance] is required to keep the ponds operating as originally designed. Sometimes, the maintenance conducted involves sediment excavation and removal activities. MCM 6 f the [https://stormwater.pca.state.mn.us/index.php?title=MS4_PART_III.STORMWATER_POLLUTION_PREVENTION_PROGRAM_(SWPPP) The MS4 General Permit] requires specific documentation of these activities.
+
[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_ponds Maintenance] is required to keep the ponds operating as originally designed. Sometimes, the maintenance conducted involves sediment excavation and removal activities. MCM 6 f the [https://stormwater.pca.state.mn.us/index.php?title=Stormwater_Program_for_Municipal_Separate_Storm_Sewer_Systems_(MS4) The MS4 General Permit] requires specific documentation of these activities.
  
 
==Resources==
 
==Resources==
Line 13: Line 13:
  
 
===Example procedures===
 
===Example procedures===
*[[File:Stormwater Pond TP-TSS Effectiveness Procedures - West St. Paul.pdf]] - City of West St. Paul's procedures for determining the effectiveness of TSS and TP removal
+
*[[media:Stormwater Pond TP-TSS Effectiveness Procedures - West St. Paul.pdf|Pond TSS and TP removal effectiveness procedure]] - City of West St. Paul's procedures for determining the effectiveness of TSS and TP removal
*[[File:Stormwater Pond TP-TSS Effectiveness Procedures - Oakdale.docx]] - City of Oakdale's procedures for determining the effectiveness of TSS and TP removal
+
*[[media:Stormwater Pond TP-TSS Effectiveness Procedures - Oakdale.docx|Pond TSS and TP removal effectiveness procedure]] - City of Oakdale's procedures for determining the effectiveness of TSS and TP removal
  
 
===Documentation and tracking templates===
 
===Documentation and tracking templates===
[[File:PondExcavationTrackingTemplate.xlsx]] - MPCA's template to track sediment removal and excavation activities
+
*[[media:Pond Excavation Tracking.xlsx|Pond sediment excavation activity tracking template]] - MPCA template to document all required information related to pond sediment excavation activities at municipally owned or operated stormwater ponds
 +
 
 +
[[Category:Level 3 - Best management practices/Structural practices/Wet pond]]
 +
[[Category:Level 2 - Regulatory/Municipal (MS4)]]

Latest revision as of 17:39, 2 February 2023

Stormwater pond assessment procedure

This photo shows a wet detention pond
Photo of a wet detention pond

Stormwater ponds are common treatment practices that have been installed in communities for years. The municipal separate storm sewer system (MS4) General Permit requires permittees to develop procedures and a schedule to determining the total suspended solids (TSS) and total phosphorus (TP) treatment effectiveness of all municipally owned/operated stormwater ponds (MS4 General Permit Part III.D.6.d.). The schedule to assess ponds can extend beyond the current MS4 General Permit term. The schedule must be based on measurable goals and priorities that you have established for your community.

Stormwater pond sediment excavation and removal activities

Maintenance is required to keep the ponds operating as originally designed. Sometimes, the maintenance conducted involves sediment excavation and removal activities. MCM 6 f the The MS4 General Permit requires specific documentation of these activities.