m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
<td>[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration]</td> | <td>[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration]</td> | ||
<td> | <td> | ||
− | *https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration BMPs are preferred practices | + | *[https://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltration_Best_Management_Practices Infiltration BMPs are preferred practices] |
*Provide a minimum 3-foot separation from the seasonally-high water table, bedrock or impervious soil layer</td> | *Provide a minimum 3-foot separation from the seasonally-high water table, bedrock or impervious soil layer</td> | ||
</tr> | </tr> | ||
Line 50: | Line 50: | ||
<noinclude> | <noinclude> | ||
− | [[ | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Pollutant removal]] |
+ | [[Category:Level 2 - Pollutants/Phosphorus]] | ||
+ | [[Category:Level 3 - Best management practices/Specifications and details/Design criteria]] | ||
</noinclude> | </noinclude> |
Summary of stormwater design recommendations to enhance phosphorus removal.
Link to this table
BMP Design | Design recommendations |
---|---|
Infiltration |
|
Filtration (includes practices with an underdrain) |
|
Stormwater ponds1 |
|
Constructed Stormwater wetlands |
|
1The recommendations for constructed ponds are from the original Minnesota Stormwater Manual. MPCA anticipates updating this information in the near future.
This page was last edited on 7 August 2022, at 11:58.