m |
m |
||
(6 intermediate revisions by the same user not shown) | |||
Line 32: | Line 32: | ||
<td></td> | <td></td> | ||
<td>Vacuum/JetVac combination vehicle [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td> | <td>Vacuum/JetVac combination vehicle [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>[https://www.prinsco.com/wp-content/uploads/2015/03/HydroStor-HS180-Sediment-Row-A-D-7-202.pdf Prinsco HydroStor Sediment Row]</td> | ||
+ | <td></td> | ||
+ | <td>More frequent during first year of operation, then varies by location</td> | ||
+ | <td></td> | ||
+ | <td></td> | ||
+ | <td>Clean-out when average depth of sediment ranges from 1-3 inches</td> | ||
+ | <td></td> | ||
+ | <td>Vacuum/JetVac combination vehicle</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 66: | Line 76: | ||
<td>Suntree Nutrient Separating Baffle Box (NSBB)</td> | <td>Suntree Nutrient Separating Baffle Box (NSBB)</td> | ||
<td></td> | <td></td> | ||
− | <td>After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days [https:// | + | <td>After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days [https://oldcastleinfrastructure.com/brands/nutrient-separating-baffle-box-nsbb/]</td> |
− | <td>[https:// | + | <td>[https://oldcastleinfrastructure.com/brands/nutrient-separating-baffle-box-nsbb/ Inspection and maintenance checklist]; [https://oldcastleinfrastructure.com/brands/nutrient-separating-baffle-box-nsbb/]</td> |
<td></td> | <td></td> | ||
− | <td>Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume [https:// | + | <td>Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume [https://oldcastleinfrastructure.com/brands/nutrient-separating-baffle-box-nsbb/]</td> |
<td></td> | <td></td> | ||
<td>Vacuum truck</td> | <td>Vacuum truck</td> | ||
Line 89: | Line 99: | ||
<td>[https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf Maintenance data sheet]</td> | <td>[https://www.njstormwater.org/pdf/StormPro_Certification_20150120.pdf Maintenance data sheet]</td> | ||
<td></td> | <td></td> | ||
− | <td>Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year [https:// | + | <td>Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year [https://env21.com/products/stormpro/]</td> |
<td></td> | <td></td> | ||
− | <td>Truck-mounted sewer and catch basin cleaner with vacuum pump [https:// | + | <td>Truck-mounted sewer and catch basin cleaner with vacuum pump [https://env21.com/products/stormpro/]</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>BaySeparator by BaySaver </td> | <td>BaySeparator by BaySaver </td> | ||
<td></td> | <td></td> | ||
− | <td>At least every 6 months initially, then site specific [https:// | + | <td>At least every 6 months initially, then site specific [https://www.adspipe.com/water-management-solutions/water-quality/separators/bayseparator-stormwater-treatment-system]</td> |
− | <td>[https:// | + | <td>[https://www.adspipe.com/water-management-solutions/water-quality/separators/bayseparator-stormwater-treatment-system Maintenance instructions]</td> |
<td></td> | <td></td> | ||
− | <td>Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated [https:// | + | <td>Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated [https://www.adspipe.com/water-management-solutions/water-quality/separators/bayseparator-stormwater-treatment-system]</td> |
<td></td> | <td></td> | ||
− | <td>Vacuum truck [https://www. | + | <td>Vacuum truck [https://www.adspipe.com/water-management-solutions/water-quality/separators/bayseparator-stormwater-treatment-system]</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 112: | Line 122: | ||
<td></td> | <td></td> | ||
<td>Vacuum truck [https://upstreamtechnologies.us/docs/SAFL-Baffle-Design-Guide.pdf]</td> | <td>Vacuum truck [https://upstreamtechnologies.us/docs/SAFL-Baffle-Design-Guide.pdf]</td> | ||
+ | </tr> | ||
+ | <tr> | ||
+ | <td>[https://www.prinsco.com/wp-content/uploads/2021/03/ThePreserver%E2%84%A2_Dissipator-InstallationGuide.pdf Prinsco Preserver Dissipator]</td> | ||
+ | <td>15 minute installation.</td> | ||
+ | <td>Spring and fall inspections recommended. More frequent inspections are recommended following installation until a routine maintenance frequency is be determined.</td> | ||
+ | <td>[https://www.momentumenv.com/wp-content/uploads/2020/04/Preserver-Inspection-Manual-Log.pdf]</td> | ||
+ | <td>Yes</td> | ||
+ | <td>Sediment removed when average depth reaches 1x pipe dia. below the outlet.</td> | ||
+ | <td>na</td> | ||
+ | <td>Vacuum truck</td> | ||
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 136: | Line 156: | ||
<noinclude> | <noinclude> | ||
− | [[Category:Pretreatment | + | [[Category:Level 3 - Best management practices/Pretreatment practices/Tables]] |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Pretreatment]] | ||
</noinclude> | </noinclude> |
Above ground and below grade storage and settling - installation and maintenance recommendations
Link to this table
Device | Installation notes | Frequency of inspections | Maintenance checklist (link) | Permitted on private land/ Maintenance agreement recommended | Practices for minimizing sediment and trash buildup | Practices for minimizing erosion | Cost considerations (equipment needed and man hours) |
---|---|---|---|---|---|---|---|
Pretreatment row on underground storage/filtration | no data | At least every 6 months for first year of operation, then varies by location | Periodically remove sediment by back-flushing water and vacuuming manhole sump [1] | Vacuum truck | |||
StormTech Isolator Row | Installation instructions available here. | At least every 6 months for first year of operation, then varies by location [2] | Step by step maintenance procedures | Clean-out when average depth of sediment exceeds 3 inches [3] | Vacuum/JetVac combination vehicle [4] | ||
Prinsco HydroStor Sediment Row | More frequent during first year of operation, then varies by location | Clean-out when average depth of sediment ranges from 1-3 inches | Vacuum/JetVac combination vehicle | ||||
Settling chamber/vault | Remove sediment once depth reaches 6 inches or more [5] | ||||||
Oil/water/grit separators | After every major storm but at least once per month [6] | Clean out at least twice per year [7] | |||||
Hydro Dry Screen | Every 3-6 months during first year, then site specific [8] | Maintenance and inspection checklist [9] | Remove sediment once depth exceeds maximum clean-out depth [10] | Vacuum truck | |||
Suntree Nutrient Separating Baffle Box (NSBB) | After each runoff event initially, then at least quarterly. Local and State regulation may require every 90 days [11] | Inspection and maintenance checklist; [12] | Vacuum out sediment chambers when sediment accumulation exceeds 50% storage volume [13] | Vacuum truck | |||
Manhole Baffle Box | Frequently for first two years following installation, then site specific [14] | Fully cleaned at least once per year [15] | Vacuum truck; One half day; Average cost $450 [16] | ||||
Environment 21 StormPro | At least quarterly until a more accurate schedule can be determined [17] | Maintenance data sheet | Sediment should be removed when sediment depth in first chamber is 50% of design sediment storage depth or at least once per year [18] | Truck-mounted sewer and catch basin cleaner with vacuum pump [19] | |||
BaySeparator by BaySaver | At least every 6 months initially, then site specific [20] | Maintenance instructions | Cleaning recommended every 12-36 months or when 2 feet of sediment have accumulated [21] | Vacuum truck [22] | |||
Sump Manhole with SAFL Baffle | 45 minute installation [23] | Three times per year for first two years | Sediment removed before it reaches the bottom of the SAFL baffle | Vacuum truck [24] | |||
Prinsco Preserver Dissipator | 15 minute installation. | Spring and fall inspections recommended. More frequent inspections are recommended following installation until a routine maintenance frequency is be determined. | [25] | Yes | Sediment removed when average depth reaches 1x pipe dia. below the outlet. | na | Vacuum truck |
Deep sump catch basin | Four times per year and at the end of foliage and snow- removal seasons [26] | Four times per year or when deposit depth is greater than ½ depth from bottom of invert to lowest pipe [27] | Hood required | Vacuum truck or clamshell bucket [28] | |||
Forebay/pre-settling basin | Hard floor (concrete or grouted stone) allows definition of bottom and ease of maintenance. Provide appropriate stabilized maintenance access for heavier equipment at no more than 2% cross slope and no more than 10% longitudinal slope | Monthly [29] | Four times per year or when sediment depth is >3 ft. A hard bottom such as concrete facilitates removal, during design ensure forebay is vehicle accessible [30]; [31] | Forebay should be designed to withstand 2-yr and 10-yr velocities without scouring [32] | Vacuum truck skid-loader, or backhoe |