[[File:Technical information page image.png|100px|left|alt=image]]
 
[[File:Technical information page image.png|100px|left|alt=image]]
 
[[File:Liner example.jpg|300 px|thumb|alt=picture of a liner|<font size=3>Example of an impermeable liner for a stormwater best management practice. Source: [https://www.pwdplanreview.org/manual/chapter-4/4.12-outlet-controls Philadelphia Water (PWD) Stormwater Management Guidance Manual].</font size>]]
 
[[File:Liner example.jpg|300 px|thumb|alt=picture of a liner|<font size=3>Example of an impermeable liner for a stormwater best management practice. Source: [https://www.pwdplanreview.org/manual/chapter-4/4.12-outlet-controls Philadelphia Water (PWD) Stormwater Management Guidance Manual].</font size>]]
 +
[[File:Pdf image.png|100px|thumb|left|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Liners_for_stormwater_management.pdf Download pdf]</font size>]]
 +
  
 
Liners are designed to limit infiltration of water from a stormwater Best Management Practice (BMP) into underlying and adjacent soil.
 
Liners are designed to limit infiltration of water from a stormwater Best Management Practice (BMP) into underlying and adjacent soil.
Line 10: Line 12:
  
 
The following sectors covered under an [http://stormwater.pca.state.mn.us/index.php/Industrial_stormwater_program Industrial Stormwater Permit] are required to have liners for ponds constructed after April 5, 2010.
 
The following sectors covered under an [http://stormwater.pca.state.mn.us/index.php/Industrial_stormwater_program Industrial Stormwater Permit] are required to have liners for ponds constructed after April 5, 2010.
*[http://stormwater.pca.state.mn.us/index.php/Sector_M_-_Automobile_Salvage_Yards Automobile salvage yards] (Sector M)
+
*Automobile salvage yards (Sector M)
*[http://stormwater.pca.state.mn.us/index.php/Sector_S_-_Air_Transportation Air transportation facilities that conduct deicing activities] (Sector S)
+
*Air transportation facilities that conduct deicing activities (Sector S)
*[http://stormwater.pca.state.mn.us/index.php/Sector_K_-_Hazardous_Waste_Treatment,_Storage,_or_Disposal_Facilities Hazardous waste treatment, storage, or disposal facilities operating as a Solid Waste Management Unit] (Sector K)
+
*Hazardous waste treatment, storage, or disposal facilities operating as a Solid Waste Management Unit (Sector K)
*[http://stormwater.pca.state.mn.us/index.php/Sector_A_-_Timber_Products Timber product facilities operating under an SIC code of 2491] (Sector A - wood preserving)
+
*Timber product facilities operating under an SIC code of 2491 (Sector A - wood preserving)
*[http://stormwater.pca.state.mn.us/index.php/Sector_N_-_Scrap_Recycling_and_Waste_Recycling_Facilities Scrap recycling and waste recycling facilities] (Sector N)
+
*Scrap recycling and waste recycling facilities (Sector N)
  
 
==Conditions where liners are recommended==
 
==Conditions where liners are recommended==
Line 21: Line 23:
 
*Permeable pavement designs in compacted fill soils.
 
*Permeable pavement designs in compacted fill soils.
 
*Areas where seepage from a BMP into the groundwater would otherwise occur but should be avoided due to risk of groundwater contamination. These include
 
*Areas where seepage from a BMP into the groundwater would otherwise occur but should be avoided due to risk of groundwater contamination. These include
**[http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots#Determining_if_a_PSH_is_a_hotspot Confirmed stormwater hotspots] in areas where the potential for groundwater pollution is high. Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater. The potential for groundwater pollution can be determined using existing pollution sensitivity maps developed by the [http://www.dnr.state.mn.us/waters/groundwater_section/mapping/atlases.html Minnesota Department of Natural Resources]. Note these maps cover large geographic areas and should be used for initial screening at a site.
+
**[http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots#Determining_if_a_PSH_is_a_hotspot Confirmed stormwater hotspots] in areas where the potential for groundwater pollution is high. Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater. The potential for groundwater pollution can be determined using existing pollution sensitivity maps developed by the [https://www.dnr.state.mn.us/waters/groundwater_section/mapping/index.html Minnesota Department of Natural Resources]. Note these maps cover large geographic areas and should be used for initial screening at a site.
 
**Areas where infiltrating water will mobilize contaminants in soil or groundwater
 
**Areas where infiltrating water will mobilize contaminants in soil or groundwater
 
*Locations where recommended horizontal or vertical [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances separation distances] cannot be achieved
 
*Locations where recommended horizontal or vertical [http://stormwater.pca.state.mn.us/index.php/Stormwater_infiltration_and_setback_%28separation%29_distances separation distances] cannot be achieved
Line 33: Line 35:
 
**HDPE (high density polyethylene) liner criteria:
 
**HDPE (high density polyethylene) liner criteria:
 
***Minimum thickness shall be 60 mils.
 
***Minimum thickness shall be 60 mils.
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard].
+
***Design according to the criteria in Table 3 of the [https://efotg.sc.egov.usda.gov/api/CPSFile/20940/313_OH_CPS_Waste_Storage_Facility_2017 NRCS 313, Waste Storage Facility technical standard].
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining (You can also access the specification here - [[File:WI Liner spec 202.pptx]]).
+
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining (You can also access the specification here - [[File:000 WI CS-202 Polyethylene Geomembrane Lining MAR-2019.pdf]]).
**PVC (Polyvinyl chloride) - follow specifications in MPCA's [http://www.pca.state.mn.us/index.php/view-document.html?gid=16187 PVC liner guidance]. '''NOTE: 30 mil smooth polyvinyl chloride geomembrane is functionally equivalent to 60 mil textured high density polyethylene.'''
+
**PVC (Polyvinyl chloride) - follow specifications in MPCA's [https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-32.pdf PVC liner guidance]. '''NOTE: 30 mil smooth polyvinyl chloride geomembrane is functionally equivalent to 60 mil textured high density polyethylene.'''
 
**GCL (geosynthetic clay liner) liner criteria:
 
**GCL (geosynthetic clay liner) liner criteria:
***Design according to the criteria in [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf Table 4 of NRCS 313, Waste Storage Facility technical standard].
+
***Design according to the criteria in [https://efotg.sc.egov.usda.gov/api/CPSFile/20940/313_OH_CPS_Waste_Storage_Facility_2017 Table 4 of NRCS 313, Waste Storage Facility technical standard].
*** Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5426/000_WI_CS-203_Geosynthetic_Clay_Liner_OCT-2019 NRCS Wisconsin Construction Specification 203], Geosynthetic Clay Liner. (You can also access the specification here - [[File:Clay liner spec.pptx]]
+
*** Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5426/000_WI_CS-203_Geosynthetic_Clay_Liner_OCT-2019 NRCS Wisconsin Construction Specification 203], Geosynthetic Clay Liner. (You can download the document here - [[File:000 WI CS-203 Geosynthetic Clay Liner OCT-2019.pdf]]
 
**Clay liner criteria (essentially the same as the clay below landfills but not as thick):
 
**Clay liner criteria (essentially the same as the clay below landfills but not as thick):
 
***50 percent fines (200 sieve) or more
 
***50 percent fines (200 sieve) or more
Line 45: Line 47:
 
***Average PI of 12 or more, with no values less than 10
 
***Average PI of 12 or more, with no values less than 10
 
***Clay installed wet of optimum if using standard Proctor, and 2 percent wet of optimum if using modified Proctor
 
***Clay installed wet of optimum if using standard Proctor, and 2 percent wet of optimum if using modified Proctor
***Clay compaction and documentation as specified in  [https://efotg.sc.egov.usda.gov/references/public/WI/WCS-300-(2018-04).pdf NRCS Wisconsin Construction Specification 300], Clay Liners (or upload here - [[https://stormwater.pca.state.mn.us/index.php?title=File:WCS-300-(2018-04).pdf]])
+
***Clay compaction and documentation as specified in  [https://efotg.sc.egov.usda.gov/references/Delete/2016-3-26/WCS-300-Final.pdf NRCS Wisconsin Construction Specification 300], Clay Liners (or download here - [[File:WCS-300-(2018-04).pdf]])
 
***Minimum thickness of two feet
 
***Minimum thickness of two feet
 
***Specify method for keeping the pool full or use of composite soils below liner
 
***Specify method for keeping the pool full or use of composite soils below liner
Line 51: Line 53:
 
**HDPE liner criteria:
 
**HDPE liner criteria:
 
***Minimum thickness shall be 40 mils or greater
 
***Minimum thickness shall be 40 mils or greater
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard]
+
***Design according to the criteria in Table 3 of the [https://efotg.sc.egov.usda.gov/api/CPSFile/20940/313_OH_CPS_Waste_Storage_Facility_2017 NRCS 313, Waste Storage Facility technical standard]
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining
+
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining (You can download the document here - [[File:000 WI CS-202 Polyethylene Geomembrane Lining MAR-2019.pdf]]
 
**Silt/Clay liner criteria:
 
**Silt/Clay liner criteria:
 
***50 percent fines (200 sieve), or 20 percent fines and a PI of 7
 
***50 percent fines (200 sieve), or 20 percent fines and a PI of 7
 
***An in-place hydraulic conductivity of 1 x 10<sup>-5</sup> centimeters per second or less
 
***An in-place hydraulic conductivity of 1 x 10<sup>-5</sup> centimeters per second or less
***Soil compaction and documentation as specified in [https://efotg.sc.egov.usda.gov/api/CPSFile/5454/000_WI_CS-204_-Earthfill_for_Waste_Storage_Facilities_SEP-2018 NRCS Wisconsin Construction Specification 204], Earthfill for Waste Storage Facilities
+
***Soil compaction and documentation as specified in [https://efotg.sc.egov.usda.gov/api/CPSFile/5454/000_WI_CS-204_-Earthfill_for_Waste_Storage_Facilities_SEP-2018 NRCS Wisconsin Construction Specification 204], Earthfill for Waste Storage Facilities (You can download the document here - [[File:000 WI CS-204 -Earthfill for Waste Storage Facilities SEP-2018.pdf]])
 
***Minimum thickness of two feet
 
***Minimum thickness of two feet
 
***Specify method for keeping the pool full or use of composite soils below liner
 
***Specify method for keeping the pool full or use of composite soils below liner
 
*Liners for facilities covered by an Industrial Stormwater Permit and where ponds are allowed with a constructed liner
 
*Liners for facilities covered by an Industrial Stormwater Permit and where ponds are allowed with a constructed liner
 
**The industrial stormwater pond must be lined with a synthetic liner that is chemically compatible with materials expected to enter the pond, must be Ultra Violet (UV) stable, and must be designed to restrict infiltration to less than 500 gallons per acre per day (5.41 x 10<sup>-7</sup> centimeters per second).
 
**The industrial stormwater pond must be lined with a synthetic liner that is chemically compatible with materials expected to enter the pond, must be Ultra Violet (UV) stable, and must be designed to restrict infiltration to less than 500 gallons per acre per day (5.41 x 10<sup>-7</sup> centimeters per second).
**The industrial stormwater pond must be designed in accordance with accepted engineering practices. (See MPCA [http://www.pca.state.mn.us/index.php/view-document.html?gid=11503 Recommended Pond Design Criteria], [http://www.pca.state.mn.us/index.php/view-document.html?gid=16187 Polyvinyl Chloride Liner guidelines], and [http://www.pca.state.mn.us/index.php/view-document.html?gid=16186 High Density Polyethylene Liner Guidance])
+
**The industrial stormwater pond must be designed in accordance with accepted engineering practices. (See MPCA [https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-53.pdf Recommended Pond Design Criteria], [https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-60.pdf Polyvinyl Chloride Liner guidelines], and [https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-32.pdf High Density Polyethylene Liner Guidance])
  
 
==Decision process for selecting liner level==
 
==Decision process for selecting liner level==
Line 69: Line 71:
  
 
==Additional information==
 
==Additional information==
*[http://dnr.wi.gov/topic/stormwater/documents/wetpondstd1001.pdf Wisconsin guidance] for wet detention pond
+
*[https://dnr.wi.gov/topic/stormwater/documents/1001WetDetentionPond.pdf Wisconsin guidance] for wet detention pond
 
*[http://doee.dc.gov/sites/default/files/dc/sites/ddoe/publication/attachments/Ch3.9StormwaterPonds_0.pdf Washington D.C. guidance] for ponds
 
*[http://doee.dc.gov/sites/default/files/dc/sites/ddoe/publication/attachments/Ch3.9StormwaterPonds_0.pdf Washington D.C. guidance] for ponds
 
*[https://fortress.wa.gov/ecy/publications/parts/1210030part6.pdf State of Washington] guidance. See section 4.4.
 
*[https://fortress.wa.gov/ecy/publications/parts/1210030part6.pdf State of Washington] guidance. See section 4.4.
*[http://www.vwrrc.vt.edu/swc/NonPBMPSpecsMarch11/DCR%20BMP%20Spec%20No%2014_WET%20PONDS_Final%20Draft_v1-9_03012011.pdf Virginia guidance] for wet ponds. See section 6.8.
+
*[https://swbmpvwrrc.wp.prod.es.cloud.vt.edu/wp-content/uploads/2018/07/BMP_Spec_No_14_WET_PONDS.pdf Virginia guidance] for wet ponds. See section 6.8.
*[http://www.tceq.state.tx.us/publications/rg/rg-348/chapter3.html/at_download/file Texas guidance]. See section 3.4.2.
+
*[https://www.seattle.gov/util/cs/groups/public/@spuweb/@policy/documents/webcontent/1_046871.pdf Seattle guidance]. See section E-7, page E-18.
*[http://www.seattle.gov/dpd/cs/groups/pan/@pan/documents/web_informational/p2145421.pdf Seattle guidance]. See section E-7, page E-18.
 
 
*Minnesota Pollution Control Agency
 
*Minnesota Pollution Control Agency
**[http://www.pca.state.mn.us/index.php/view-document.html?gid=16186 HPDE liner guidance]
+
**[https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-32.pdf HPDE liner guidance]
**[http://www.pca.state.mn.us/index.php/view-document.html?gid=16187 PVC liner guidance]
+
**[https://www.pca.state.mn.us/sites/default/files/wq-wwtp5-60.pdf PVC liner guidance]
 +
 
 +
[[Category:Level 2 - Best management practices/Guidance and information]]
 +
[[Category:Level 2 - Technical and specific topic information/Miscellaneous technical information]]

Latest revision as of 01:18, 7 December 2022

image
picture of a liner
Example of an impermeable liner for a stormwater best management practice. Source: Philadelphia Water (PWD) Stormwater Management Guidance Manual.


Liners are designed to limit infiltration of water from a stormwater Best Management Practice (BMP) into underlying and adjacent soil.

Conditions where liners are required

Under the Construction Stormwater General Permit:

  • The Permittee(s) must ensure filtration systems with less than three (3) feet of separation from seasonally saturated soils or from bedrock are constructed with an impermeable liner;
  • Permittees must design basins using an impermeable liner if located within active karst terrain.

The following sectors covered under an Industrial Stormwater Permit are required to have liners for ponds constructed after April 5, 2010.

  • Automobile salvage yards (Sector M)
  • Air transportation facilities that conduct deicing activities (Sector S)
  • Hazardous waste treatment, storage, or disposal facilities operating as a Solid Waste Management Unit (Sector K)
  • Timber product facilities operating under an SIC code of 2491 (Sector A - wood preserving)
  • Scrap recycling and waste recycling facilities (Sector N)

Conditions where liners are recommended

Liners are recommended for the following conditions.

  • Circumstances where a permanent pool is needed but difficult to maintain due to site conditions. Examples include constructed wet detention ponds or constructed wetlands requiring a permanent pool and underlain by areas with Hydrologic Soil Group A soils, gravel, or fractured bedrock
  • Permeable pavement designs in compacted fill soils.
  • Areas where seepage from a BMP into the groundwater would otherwise occur but should be avoided due to risk of groundwater contamination. These include
    • Confirmed stormwater hotspots in areas where the potential for groundwater pollution is high. Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater. The potential for groundwater pollution can be determined using existing pollution sensitivity maps developed by the Minnesota Department of Natural Resources. Note these maps cover large geographic areas and should be used for initial screening at a site.
    • Areas where infiltrating water will mobilize contaminants in soil or groundwater
  • Locations where recommended horizontal or vertical separation distances cannot be achieved
  • Use impermeable liner as needed to separate tree BMPs from road, parking lot, sidewalk or adjacent walls or building foundation

Liner specifications

Specifications are provided for different levels of liners. Although specifications for clay liners are included with Levels 1 and 2, clay liners are generally not recommended. Links to information on design and installation is recommended. For additional information see additional information.

Decision process for selecting liner level

The following table summarizes the process for selecting a liner.

Design process for selecting the appropriate liner level.
Link to this table

Condition Design level Note
Filtration practices with less than 3 feet of separation to seasonal saturated soil or bedrock 1 Required under the Construction Stormwater permit
BMP in confirmed potential stormwater hotspot with high or very high groundwater pollution potential or areas where infiltrating water will mobilize contaminants in soil or groundwater 1 Applies to all post-construction BMPs. See section on Potential stormwater hotspots for more information
Constructed ponds with less than 3 feet separation from seasonally high water table in a potential hotspot 1
Constructed wet ponds underlain by soils with an infiltration rate of 0.3 inches per hour or greater (HSG A or B soils) 1 To maintain a permanent pool
Karst terrain with high or very high groundwater pollution potential1 1 See section on karst for more information
Prevent groundwater intrusion into a BMP requiring aerobic conditions, such as iron-enhanced media 1
Maintain permanent pool in constructed ponds or constructed wetlands in areas underlain by geologic material that is fractured or has a high infiltration rate 2
Separation distance from a BMP cannot be achieved 2
Separate tree BMP from road, parking lot, sidewalk or adjacent walls or building foundation 2 To prevent tree root intrusion. See link

1 Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater.