{{alert|The anticipated construction period for this page is January through March, 2013|alert-under-construction}}
+
[[File:Pdf image.png|100px|thumb|alt=pdf image|<font size=3>[https://stormwater.pca.state.mn.us/index.php?title=File:Design_criteria_for_permeable_pavement_-_Minnesota_Stormwater_Manual.pdf Download pdf]</font size>]]
 +
[[File:Technical information page image.png|100px|right|alt=image]]
 +
[[File:Pervious concrete cross section.jpg|thumb|300 px|alt=This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.</font size>]]
  
{{alert|The anticipated review period for this page is January through March, 2013|alert-under-review}}
+
[[File:Pervious asphalt cross section.jpg|thumb|300 px|alt=This schematic illustrates typical porous asphalt cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical porous asphalt cross section and basic components of a pervious concrete system.</font size>]]
  
[[File:Pervious concrete cross section.jpg|thumb|500 px|alt=This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.</font size>]]
+
[[File:Permeable interlocking concrete pavement cross section.jpg|thumb|300 px|alt=This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system|<font size>Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.</font size>]]
  
[[File:Pervious asphalt cross section.jpg|thumb|500 px|alt=This schematic illustrates typical porous asphalt cross section and basic components of a pervious concrete system|<font size=3>Schematic illustrating typical porous asphalt cross section and basic components of a pervious concrete system.</font size>]]
+
{{alert|Permeable pavement can be an important tool for retention and detention of stormwater runoff. Permeable pavement may provide additional benefits, including reducing the need for de-icing chemicals, and providing a durable and aesthetically pleasing surface.|alert-success}}
  
[[File:Permeable interlocking concrete pavement cross section.jpg|thumb|500 px|alt=This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system|<font size>Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.</font size>]]
+
This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed.
  
This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed.
+
==Design phase maintenance considerations==
 +
Implicit in the design guidance is the fact that many design elements of infiltration and filtration systems can minimize the maintenance burden and maintain pollutant removal efficiency. Key examples include
 +
*limiting drainage area;
 +
*providing easy site access (''REQUIRED''); and
 +
*providing [[Glossary#P|pretreatment]] (''REQUIRED'').
 +
 
 +
For more information on design information for individual infiltration and filtration practices, [http://stormwater.pca.state.mn.us/index.php/Category:Design_criteria link here].
  
 
==Hydrologic design considerations==
 
==Hydrologic design considerations==
Line 17: Line 25:
 
*Soils – Soil conditions and infiltration rates determine the use of an [[Glossary|underdrain]]. ([http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/home NRCS] [[Glossary|Hydrologic Soil Group]] (HSG) C or D soils usually require an underdrain, whereas HSG A and B soils often do not.) Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on soil surveys should be considered as primary locations for all types of infiltration practices.
 
*Soils – Soil conditions and infiltration rates determine the use of an [[Glossary|underdrain]]. ([http://www.nrcs.usda.gov/wps/portal/nrcs/main/national/home NRCS] [[Glossary|Hydrologic Soil Group]] (HSG) C or D soils usually require an underdrain, whereas HSG A and B soils often do not.) Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on soil surveys should be considered as primary locations for all types of infiltration practices.
  
:Soil surveys and HSG classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per [http://www.astm.org/Standard/index.shtml ASTM] D2487. However, it is best to determine rates using on-site infiltration testing per ASTM D3385 Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring or other available methods. The median rate determined from in-situ measurements should be reduced by a factor of 2.5 and this reduced value used in design calculations. This reduction accounts for incidental compaction during construction and sedimentation of the subgrade over time.  
+
:Soil surveys and HSG classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per [http://www.astm.org/Standard/index.shtml ASTM] D2487. However, it is best to determine rates using on-site infiltration testing per ASTM D3385 Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring or other available methods. The median rate determined from in-situ measurements should be reduced by a factor of 2.5 and this reduced value used in design calculations. This reduction accounts for incidental compaction during construction and sedimentation of the subgrade over time.
 +
 
 +
{{alert|The safety factor of 2.5 is greater than a factor of 2 recommended in most guidance for permeable pavement. This manual utilizes recommended soil infiltration rates for hydrologic soil groups (see [http://stormwater.pca.state.mn.us/index.php/Design_infiltration_rates]). These are not as conservative as infiltration rates based on the [https://www.pca.state.mn.us/sites/default/files/p-gen3-12d.pdf Unified Soil Classification System], particularly for finer textured soils. We therefore recommended the more conservative value of 2.5|alert-info}}
  
 
:In most cases, permeable pavement should not be situated above fill soils. Designs in compacted fill soils may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer.
 
:In most cases, permeable pavement should not be situated above fill soils. Designs in compacted fill soils may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer.
  
*Contributing drainage area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased to no greater than 5:1 if at least one of these conditions exists:
+
*Geotextiles - In the absence of full-depth concrete curbs or impermeable liners, geotextiles are recommended on the (vertical) sides of permeable pavements to separate the reservoir layers from the adjacent soil subgrade. Horizontally placed geotextiles between the aggregate base and soil subgrade are at the option of the designer. Geotextile use should be carefully evaluated and selection should be guided by AASHTO M-288 Geotextile for Highway Applications ([[References for permeable pavement|AASHTO 2010]]). Specific selection guidance is provided under the Subsurface Drainage section. Class II geotextiles are generally used.
**permeable pavement is receiving runoff from roofs as it tends to be very low in sediment;
+
 
**runoff from adjacent impervious surfaces remains unburdened with sediment due to effective pre-treatment prior to entering the permeable pavement; or
+
*Contributing drainage area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. Runoff from permeable areas is not recommended due to potential clogging of the permeable pavement. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased to no greater than 5:1 if at least one of these conditions exists:
**permeable pavement and contributing impervious pavements receive regular vacuuming to reduce and control sediment loads and surface clogging potential.  
+
**permeable pavement is receiving runoff from roofs as it tends to be very low in sediment; or
 +
**runoff from adjacent impervious surfaces remains unburdened with sediment due to effective pretreatment prior to entering the permeable pavement.
 +
 
 +
For more information on contributing area, see [[Contributing drainage area to stormwater BMPs]].
 +
 
 +
{{alert|Permeable pavement and contributing impervious pavements are assumed to receive regular vacuuming to reduce and control sediment loads and surface clogging potential.|alert-warning}}
  
 
*Soil subgrade slope – The slope of the soil subgrade should be as flat as possible (i.e., less than 1 percent longitudinal slope) to enable even distribution and infiltration of stormwater. Lateral slopes should be less than 1 percent. Steep slopes can reduce the stormwater storage capacity of permeable pavement. Designers should consider using a terraced subgrade design for permeable pavement in sloped areas, especially when the subgrade slope exceeds 3 percent.
 
*Soil subgrade slope – The slope of the soil subgrade should be as flat as possible (i.e., less than 1 percent longitudinal slope) to enable even distribution and infiltration of stormwater. Lateral slopes should be less than 1 percent. Steep slopes can reduce the stormwater storage capacity of permeable pavement. Designers should consider using a terraced subgrade design for permeable pavement in sloped areas, especially when the subgrade slope exceeds 3 percent.
Line 30: Line 45:
 
*Soil subgrade compaction – This should be avoided wherever possible to maximize infiltration. In some situations, compaction may be needed for supporting vehicular loads. In such cases, compaction density and subsequent soil infiltration should be assessed in a test pit(s) on the site to determine an acceptable soil density and its contribution to soil strength and infiltration. The measured infiltration rate for use in hydrologic calculations may be reduced by the designer to compensate for long-term sedimentation on the soil subgrade.  
 
*Soil subgrade compaction – This should be avoided wherever possible to maximize infiltration. In some situations, compaction may be needed for supporting vehicular loads. In such cases, compaction density and subsequent soil infiltration should be assessed in a test pit(s) on the site to determine an acceptable soil density and its contribution to soil strength and infiltration. The measured infiltration rate for use in hydrologic calculations may be reduced by the designer to compensate for long-term sedimentation on the soil subgrade.  
  
*Excavation methods - Excavation should be conducted in a manner that minimizes soil subgrade compaction. Tracked rather than wheeled equipment is recommended working from the sides of the excavation. For larger projects, excavation can create cells and berms where equipment removes soil from one area or cell while positioned on higher soil around each cell. This process is further described in Section 4.2. Other techniques include ripping or loosening soils compacted by construction equipment. This can be done with the teeth on excavation equipment buckets. Compaction of the aggregate base into these areas is especially important since scarified soil can settle and be reflected on the surface.  
+
*Excavation methods - Excavation should be conducted in a manner that minimizes soil subgrade compaction. Tracked rather than wheeled equipment is recommended working from the sides of the excavation. For larger projects, excavation can create cells and berms where equipment removes soil from one area or cell while positioned on higher soil around each cell (see [[Construction specifications for permeable pavement]]). Other techniques include ripping or loosening soils compacted by construction equipment. This can be done with the teeth on excavation equipment buckets. Compaction of the aggregate base into these areas is especially important since scarified soil can settle and be reflected on the surface.  
  
 
*Surface slope – Surface slopes for all permeable pavement types should be at least 1 percent to provide an alternate means for drainage should the surface become completely clogged due to lack of maintenance. Designs should provide an alternate means for stormwater to enter the aggregate reservoir if the pavement surface should ever become clogged, or for extreme storm events. For pervious concrete and porous asphalt without curbs, this can be a 2 foot wide stone edge connected to the reservoir. For curbed pavements, inlets may be used.
 
*Surface slope – Surface slopes for all permeable pavement types should be at least 1 percent to provide an alternate means for drainage should the surface become completely clogged due to lack of maintenance. Designs should provide an alternate means for stormwater to enter the aggregate reservoir if the pavement surface should ever become clogged, or for extreme storm events. For pervious concrete and porous asphalt without curbs, this can be a 2 foot wide stone edge connected to the reservoir. For curbed pavements, inlets may be used.
Line 36: Line 51:
 
*Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged.
 
*Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged.
  
*Minimum depth to seasonal high water table – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is required between the liner and the seasonal high water table.
+
*Minimum depth to [[Glossary#S|seasonal high water table]] – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is Highly recommended between the liner and the seasonal high water table.
  
*Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” [http://www.cleanwatermn.org/Documents/MS4%20toolkit%20files/Good%20Housekeeping/Porous%20Pavement/porouspa.pdf EPA 832-F-99-023]). Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases.
+
*Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” [https://nepis.epa.gov/Exe/ZyNET.exe/91018M1N.TXT?ZyActionD=ZyDocument&Client=EPA&Index=1995+Thru+1999&Docs=&Query=&Time=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex%20Data%5C95thru99%5CTxt%5C00000032%5C91018M1N.txt&User=ANONYMOUS&Password=anonymous&SortMethod=h%7C-&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g8/x150y150g16/i425&Display=hpfr&DefSeekPage=x&SearchBack=ZyActionL&Back=ZyActionS&BackDesc=Results%20page&MaximumPages=1&ZyEntry=1&SeekPage=x&ZyPURL EPA 832-F-99-023]). Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases.
  
 
:Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners.
 
:Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners.
Line 46: Line 61:
 
{{alert|Permeable pavement can be used at highly developed urban sites that have little or no space retention.|alert-success}}
 
{{alert|Permeable pavement can be used at highly developed urban sites that have little or no space retention.|alert-success}}
  
{{alert|Permeable pavements should be at least a minimum horizontal distance of 100 feet from any municipal water supply well|alert-danger}}
+
{{alert|The required setback distance to a municipal water supply well is 50 feet, but it is recommended that permeable pavements be a minimum horizontal distance of 100 feet from any municipal water supply well|alert-warning}}
  
{{alert|A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table.|alert-danger}}
+
{{alert|A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table ([[Glossary#S|saturated soil]]) or the top of bedrock (i.e. there must be a minimum of 3 feet of undisturbed soil beneath the infiltration practice and the seasonally high water table or top of bedrock).|alert-danger}}
  
 
*Limitations – There are several limitations for use of permeable pavement, as summarized below.
 
*Limitations – There are several limitations for use of permeable pavement, as summarized below.
Line 59: Line 74:
 
Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.  
 
Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.  
  
===Structural Design===
+
===Structural design===
The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association ([http://www.pavement.com/ ACPA] 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association [http://www.nrmca.org/ NRMCA] and the Portland Cement Association ([http://www.rmc-foundation.org/images/PCRC%20Files/Hydrological%20&%20Environmental%20Design/PC_DesignManual.pdf Leming] 2007).
+
The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association ([http://www.pavement.com/ ACPA] 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association [http://www.nrmca.org/ NRMCA] and the [https://www.cement.org/ Portland Cement Association].
<p>Porous asphalt (Hansen 2008) and permeable interlocking pavements (Smith 2011) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of Pavement Structures'' (AASHTO 1993). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.</p>
+
<p>Porous asphalt ([[References for permeable pavement|Hansen 2008]]) and permeable interlocking pavements ([[References for permeable pavement|Smith 2011]]) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of Pavement Structures'' ([[References for permeable pavement|AASHTO 1993]]). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.</p>
 
<p>There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.</p>
 
<p>There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.</p>
 
<p>Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:
 
<p>Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:
*pavement life and total anticipated traffic loads expressed as 18,000 lb equivalent single axle loads or ESALs (This method of assessing loads accounts for the additional pavement wear caused by trucks.);
+
*pavement life and total anticipated traffic loads expressed as 18,000 pounds equivalent single axle loads or ESALs (This method of assessing loads accounts for the additional pavement wear caused by trucks.);
 
*soil strength expressed as the soaked California Bearing Ratio (CBR), R-value or resilient modulus (Mr);
 
*soil strength expressed as the soaked California Bearing Ratio (CBR), R-value or resilient modulus (Mr);
 
*strength of the surfacing, base and subbase materials; and
 
*strength of the surfacing, base and subbase materials; and
 
*environmental factors including freezing climates and extended saturation of the soil subgrade.</p>
 
*environmental factors including freezing climates and extended saturation of the soil subgrade.</p>
<p>Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values under saturated conditions used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4%, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 psi (45 MPa) per AASHTO T-307. Soils with lower strengths typically require thickened permeable bases or those using cement or asphalt stabilized open-graded aggregates per Mn/DOT Pavement Manual, Section 3-3.01.02 Treated Base.</p>
+
<p>Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values under saturated conditions used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4 percent, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 pounds per square inch (45 Mega Pascals) per AASHTO T-307. Soils with lower strengths typically require thickened permeable bases or those using cement or asphalt stabilized open-graded aggregates per [http://www.dot.state.mn.us/materials/pvmtdesign/ Mn/DOT Pavement Manual], Section 3-3.01.02 Treated Base.</p>
 
<p>Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including
 
<p>Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including
 
*underdrains;
 
*underdrains;
Line 76: Line 91:
 
These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
<p>Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
<p>Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
+
<!--===Hydrologic Sizing===
===Hydrologic Sizing===
 
 
The soil subgrade infiltration rate typically is far lower than the flow rate through the pavement, so some reservoir storage will usually be required to maximize the stormwater benefit of permeable pavement. Often times permeable pavement is designed to store a given design storm. For instance, Minnesota’s Minimal Impact Design Standards ([[Performance goals for new development, re-development and linear projects|MIDS]]) require a performance goal of managing 1.1 inches of runoff from the tributary impervious surfaces. For this design standard, the volume of the reservoir layer will be required to store 1.1 inches of stormwater runoff entering from the impervious area plus rainfall directly into the permeable pavement itself.  
 
The soil subgrade infiltration rate typically is far lower than the flow rate through the pavement, so some reservoir storage will usually be required to maximize the stormwater benefit of permeable pavement. Often times permeable pavement is designed to store a given design storm. For instance, Minnesota’s Minimal Impact Design Standards ([[Performance goals for new development, re-development and linear projects|MIDS]]) require a performance goal of managing 1.1 inches of runoff from the tributary impervious surfaces. For this design standard, the volume of the reservoir layer will be required to store 1.1 inches of stormwater runoff entering from the impervious area plus rainfall directly into the permeable pavement itself.  
  
Line 95: Line 109:
 
The maximum allowable depth of the reservoir layer is constrained by the maximum allowable drain time, which is calculated using the following equation.
 
The maximum allowable depth of the reservoir layer is constrained by the maximum allowable drain time, which is calculated using the following equation.
  
<font size=4><math>d_{p-max} = (i/2 t_d) / V_r</math></font size>
+
<math>d_{p-max} = (i/2 t_d) / V_r</math>
  
 
where
 
where
Line 101: Line 115:
 
:''t<sub>d</sub>'' = the maximum allowable time to drain the reservoir layer, typically 1 to 2 days
 
:''t<sub>d</sub>'' = the maximum allowable time to drain the reservoir layer, typically 1 to 2 days
  
<p>The following design assumptions apply to the previous equations:
+
The following design assumptions apply to the previous equations:
 
*The contributing drainage area (''A''<sub>''c''</sub>) does not contain pervious areas.
 
*The contributing drainage area (''A''<sub>''c''</sub>) does not contain pervious areas.
 
*Compacted pervious areas that contribute runoff are included as a portion of the contributing drainage area (''A<sub>c</sub>'')
 
*Compacted pervious areas that contribute runoff are included as a portion of the contributing drainage area (''A<sub>c</sub>'')
Line 107: Line 121:
 
*The void ratio (V<sub>''r''</sub>) for the base and subbase stone layers = 0.4.
 
*The void ratio (V<sub>''r''</sub>) for the base and subbase stone layers = 0.4.
 
*The maximum drain time for the reservoir layer should be not less than 24 hours or greater than 48 hours after the initial 24-hour storm event.</p>
 
*The maximum drain time for the reservoir layer should be not less than 24 hours or greater than 48 hours after the initial 24-hour storm event.</p>
<p>If the depth of crushed stone below the pavement (depth of reservoir, d<sub>p</sub>) is greater than the maximum allowable depth of reservoir, d<sub>p-max</sub> an underdrain should be added at the elevation of d<sub>p-max</sub> to provide an overflow. The storage volume in the pavements must account for the underlying infiltration rate and outflow through the underdrain. In this case, the design storm should be routed through the pavement to accurately determine the required reservoir depth.</p>
+
<p>If the depth of crushed stone below the pavement (depth of reservoir, d<sub>p</sub>) is greater than the maximum allowable depth of reservoir, d<sub>p-max</sub> an underdrain should be added at the elevation of d<sub>p-max</sub> to provide an overflow. The storage volume in the pavements must account for the underlying infiltration rate and outflow through the underdrain. In this case, the design storm should be routed through the pavement to accurately determine the required reservoir depth.-->
  
===Outflow Rate and Volume Through Underdrains===
+
===Outflow rate and volume through underdrains===
If the depth of the base/subbase for the full infiltration system is excessive, (i.e. d<sub>p</sub> exceeds d<sub>max</sub>) because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains). The same symbols apply, but with the following additions:
+
If the depth of the base/subbase for the full infiltration system is excessive, because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains).
  
 +
The outflow rate from underdrain(s) can be approximated by
 +
 +
<math>q_u = k m</math>
 +
 +
where
 
:''q<sub>u</sub>'' = outflow through underdrain, feet/hour
 
:''q<sub>u</sub>'' = outflow through underdrain, feet/hour
 
:''k'' = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour
 
:''k'' = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour
 
:''m'' = underdrain pipe slope, feet/feet
 
:''m'' = underdrain pipe slope, feet/feet
:''n'' = number of underdrain pipes
 
:''T<sub>fill</sub>'' = effective filling time of the base/subbase which is at or above the underdrain(s), hours.
 
:''T<sub>1</sub>'' = the storage time during which the water is at or above the underdrain(s), hours.
 
:''d<sub>below</sub>'' = depth of the subbase below the underdrains, feet
 
  
The outflow rate from underdrain(s) can be approximated by
+
This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet per day or 8,500 inches per hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet per day per pipe can be used to approximate the average underdrain outflow rate.
  
<math>q_u = k x m</math>
+
Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by
  
This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately17,000 feet/day or 8,500 inches/hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet/day per pipe can be used to approximate the average underdrain outflow rate.
+
<math>d_p = ((0.95 * RP) (i/2)t_f)) / n</math>
  
Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by
+
where
 +
:0.95 is the runoff coefficient for impermeable surfaces;
 +
:''d<sub>p</sub>'' = the depth of the reservoir layer (feet);
 +
:''R'' = ''A''<sub>''c''</sub>/''A''<sub>''p''</sub> The ratio of the contributing drainage area (''A''<sub>''c''</sub>, including the permeable paving surface), to the permeable pavement surface area (''A''<sub>''p''</sub>);
 +
:''t<sub>f</sub>'' = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day;
 +
:''P'' = the rainfall depth for the design storm (feet);
 +
:''i'' = field-verified infiltration rate (ft/day); and
 +
:''n'' = porosity (cubic feet/cubic feet)
 +
<!--:''V<sub>r</sub>'' = the void ratio for the reservoir layer (typically 0.4).-->
  
<math>d_p = D Q_u R + (P – fT) – q_u (T_{fil})n / V_r</math>
+
To estimate the number of underdrain pipes (N), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes round down to the nearest whole number.
  
To estimate the number of underdrain pipes (n), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number.
+
With full infiltration systems, the maximum allowable drain time (''t''<sub>''d''</sub>) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade.
  
''T<sub>fill</sub>'' = ''T'' when the underdrains are at the bottom of the subbase. ''T<sub>fil</sub>'' = ½''T'' (approximation) when the underdrains are raised.
+
<math>t{d} = (d_pn) / (0.5i) </math>
  
With full infiltration systems, the maximum allowable drain time (''d''<sub>''max''</sub>) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade. However, for partial infiltration systems, there is a second method of storage water discharge, namely the underdrains. The depth and number of underdrains are variables that can be adjusted (unlike the infiltration rate into the soil subgrade) so that the actual drain time equals or is less than the maximum allowable drain time. If the discharge of the underdrains is included, then
+
The total storage in the permeable pavement system, V<sub>s</sub>, is given by
  
<math>d_{max} = fT_s+ q_uT_1 n / V_r = d_p</math>
+
<math> V_{s} = A_{p} (d_pn + 0.5it_{f}) </math>
  
Rearranging the previous equation, the storage time during which the water is at or above the underdrain(s) (hours) is given by
+
where
 +
:''A<sub>p</sub>'' is the surface area of the permeable pavement (ft<sup>2</sup>).
  
<math>T_1 = ((V_rd_p) – (fT_s)) / (q_u n)</math>
+
When calculating the storage volume for compliance with the Construction Stormwater Permit, only the instantaneous storage volume is considered
  
The elevation of the pipe above the soil subgrade is then given by
+
<math> V_{s} = A_{p} (d_pn) </math>
 
 
<math>d_{below} = f(T_s – T_1) / V_r</math>
 
  
 
Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design.  
 
Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design.  
Line 150: Line 172:
 
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
 
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
  
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
+
===Design for nutrient and TSS reductions===
 +
Permeable pavements can be designed to reduce nutrient loadings to the ground or surface waters. The design needs to be specifically designed to capture phosphorus. The permeable pavement system can also be designed to capture nitrogen, although it is important to note that nitrogen and phosphorus each require specific designs to facilitate their removal from stormwater. The following paragraphs describe the design characteristics necessary for the removal of phosphorus and nitrogen.
  
===Design for Nutrient and TSS Reductions===
+
A study by ([[References for permeable pavement|Bean, 2007a]]) showed higher nitrate concentrations in the exfiltrate compared to the infiltrate. Nitrogen reduction capabilities of permeable pavement can be enhanced in partial infiltration designs that detain water in the base/subbase for over 24 hours. This time is required to ensure complete de-nitrification occurs.
Permeable pavements can be designed to reduce nutrient loadings to the ground or surface waters. The design needs to be specifically designed to capture nitrogen and/or phosphorus. It is important to note that nitrogen and phosphorus each require specific designs to facilitate their removal from stormwater. The following paragraphs describe the design characteristics necessary for the removal of phosphorus and nitrogen.
 
  
Permeable pavement nitrate reduction capabilities can be enhanced in partial infiltration designs that detain water in the base/subbase for over 24 hours. This duration of time is required to ensure de-nitrification occurs. However, a study by Bean et al. (2007a) showed higher nitrate concentrations in the exfiltrate which was possibly due to the nitrification process.  
+
PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce phosphorous. Coated aggregates (sometimes called “engineered aggregates”) have an effective life of seven to ten years and target the removal of dissolved phosphorous, according to manufacturer’s literature.  
  
PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce phosphorous. Coated aggregates (sometimes called “engineered aggregates”) have an effective life of seven to ten years and target the removal of dissolved phosphorous.
+
A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction ([[References for permeable pavement|Erickson 2010]]). Their effectiveness, initial cost, reduction in flow rates, and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration if continued phosphorus reduction credit is desired. Concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions.  
  
A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction ([http://conservancy.umn.edu/bitstream/115602/1/pr549.pdf Erickson] 2010). Their effectiveness, initial cost, and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration if continued phosphorus reduction credit is desired. Concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions.  
+
A second approach useful for nutrient and TSS reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification if appropriately designed. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.
  
A second approach useful for nutrient and TSS reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification if appropriately designed. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.
+
===Soil infiltration rate testing===
 +
Prior to infiltration testing, soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Guidance for conducting infiltration tests and for determining the number of borings can be found [http://stormwater.pca.state.mn.us/index.php/Design_criteria_for_bioretention#Determine_site_infiltration_rates_.28for_facilities_with_infiltration_and.2For_recharge.29 here].
 +
<!--
 +
Boring depths should be at least 2 feet deeper than the anticipated depth of the permeable pavement. At least one soil boring must be taken to confirm the underlying soil properties at the depth where infiltration is designed to occur (i.e., to ensure that the depth to water table, depth to bedrock, or karst is defined). The depth to bedrock can be highly variable over small areas, so multiple borings should be conducted in areas having shallow bedrock.  
  
===Soil Infiltration Rate Testing===
+
For sites with a consistent soil type, a minimum of one soil permeability test per ASTM D3385 or D5093 must be taken per 25,000 square feet of planned permeable pavement surface area. In most cases where the soil type is consistent throughout the site, a single soil test is sufficient for applications less than 25,000 square feet. Additional infiltration tests are required per 25,000 square feet of planned permeable pavement area if the soil borings reveal changes in soil type. The median test result from all infiltration test values should be used as the design infiltration rate. Soil infiltration testing should be conducted within any confining layers that are found within 5 feet of the bottom of a proposed permeable pavement system.-->
Prior to infiltration testing, several soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Boring depths should be at least 2 feet deeper than the anticipated depth of the permeable pavement. At least one soil boring must be taken to confirm the underlying soil properties at the depth where infiltration is designed to occur (i.e., to ensure that the [[Shallow groundwater|depth to water table]], [[Shallow soils and shallow depth to bedrock |depth to bedrock]], or [[Karst|karst]] is defined). The depth to bedrock can be highly variable over small areas, so soil borings should be conducted where the permeable pavement will be constructed. For sites with a consistent soil type, a minimum of one soil permeability test per ASTM D3385 or D5093 must be taken per 25,000 square feet of planned permeable pavement surface area. In most cases where the soil type is consistent throughout the site, a single soil test is sufficient for applications less than 25,000 sf. Additional infiltration tests are required per 25,000 square feet of planned permeable pavement area if the soil borings reveal changes in soil type. The median test result from all infiltration test values should be used as the design infiltration rate. Soil infiltration testing should be conducted within any confining layers that are found within five feet of the bottom of a proposed permeable pavement system.
 
  
===Conveyance and Overflow===
+
===Conveyance and overflow===
Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that accomplish this:
+
Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that accomplish this.
 
*Place a perforated pipe horizontally near the top of the reservoir layer to pass excess flows after water has filled the base. The placement and/or design should be such that the incoming runoff is not captured (e.g., placing the perforations on the underside only). Pipe placement should be away from wheel loads to prevent damage.
 
*Place a perforated pipe horizontally near the top of the reservoir layer to pass excess flows after water has filled the base. The placement and/or design should be such that the incoming runoff is not captured (e.g., placing the perforations on the underside only). Pipe placement should be away from wheel loads to prevent damage.
 
*Increase the thickness of the top of the reservoir layer.
 
*Increase the thickness of the top of the reservoir layer.
Line 174: Line 198:
 
*Set the storm drain inlets level with the elevation of the permeable pavement surface to effectively convey excess stormwater runoff past the system. The design should also make allowances for relief of unacceptable ponding depths during larger rainfall events.
 
*Set the storm drain inlets level with the elevation of the permeable pavement surface to effectively convey excess stormwater runoff past the system. The design should also make allowances for relief of unacceptable ponding depths during larger rainfall events.
  
===Reservoir Layer===
+
===Reservoir layer===
The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40% per [http://www.astm.org/ ASTM] C29. Reservoir base layers for pervious concrete are typically washed AASHTO No. 57 stone and those for porous asphalt are [http://www.transportation.org/Pages/default.aspx AASHTO] No. 2, 3, or 5. PICP uses AASHTO No. 2, 3, or 4 stone.
+
The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40 percent per [http://www.astm.org/ ASTM] C29. Reservoir base layers for pervious concrete are typically washed AASHTO No. 57 stone and those for porous asphalt are [http://www.transportation.org/Pages/default.aspx AASHTO] No. 2, 3, or 5. PICP uses AASHTO No. 2, 3, or 4 stone.
  
If exposed to vehicular loads, all crushed stone should be Minnesota Department of Transportation (MnDOT) Class A or B coarse aggregate, minimum 80% crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro, or similar material. The maximum [http://www.dot.state.mn.us/materials/manuals/laboratory/1210.pdf Los Angeles Rattler Loss] should be 35% per AASHTO T-96 and no greater loss than 10% per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the [http://www.dot.state.mn.us/materials/labmanual.html MnDOT Laboratory Manual] (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.
+
If exposed to vehicular loads, all crushed stone should be Minnesota Department of Transportation (MnDOT) Class A or B coarse aggregate, minimum 80 percent crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro, or similar material. The maximum [http://www.dot.state.mn.us/materials/manuals/laboratory/1210.pdf Los Angeles Rattler Loss] should be 35 percent per AASHTO T-96 and no greater loss than 10 percent per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the [http://www.dot.state.mn.us/materials/labmanual.html MnDOT Laboratory Manual] (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.
  
 
===Underdrains===
 
===Underdrains===
Line 185: Line 209:
 
Proper maintenance of permeable pavement is crucial for ensuring its longevity and functionality. Some portions of the maintenance plan require planning during the design stages. These items are noted below.
 
Proper maintenance of permeable pavement is crucial for ensuring its longevity and functionality. Some portions of the maintenance plan require planning during the design stages. These items are noted below.
 
*Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm.
 
*Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm.
*Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface.
+
*Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface. Prior to construction, owners should commit to a vacuuming plan that includes vacuuming frequency and equipment needs. The vacuuming frequency typically depends on the time of year. In the spring, tree buds and seeds necessitate frequent vacuuming. In the fall, tree leaves and acorns necessitate frequent vacuuming. In the summer, vacuuming frequency depends on permeable pavement exposure to organic material from trees and nearby vegetated areas. Vacuum equipment and methods for sediment removal are provided in the section addressing [[Operation and maintenance of permeable pavement|operation and maintenance.]]
 
 
==Materials specifications==
 
Permeable pavement material specifications vary according to the specific pavement product selected. The following table describes general material specifications for the components installed beneath the permeable pavement. Note that the size of stone materials used in the reservoir and filter layers differ depending whether the system is pervious concrete, porous asphalt or permeable interlocking concrete pavement.
 
 
 
{{:Specifications for materials under permeable pavement surface}}
 
 
 
A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.
 
{{:Summary of specifications for permeable pavement}}
 
 
 
==Other design considerations==
 
There are additional design considerations for permeable pavement, including use of permeable pavement in karst terrain and winter considerations.
 
 
 
===Karst terrain===
 
A detailed geotechnical investigation may be required for any kind of stormwater design in [[Glossary|karst]] terrain. Permeable pavements, as with other infiltration practices, are not recommended at sites with known karst features as they can cause the formation of sinkholes and can provide a direct link for stormwater to access groundwater without providing any treatment.
 
 
 
===Winter considerations===
 
Plowed snow piles should be located in adjacent grassy areas so that sediments and pollutants in snowmelt are partially treated before they reach all permeable pavements. Sand is not recommended for winter traction over permeable pavements. If sand is applied, it must be removed with vacuum cleaning in the spring. Traction can be accomplished on PICP using jointing stone materials, some of which will find its way into the joints by springtime. A significant winter advantage of permeable pavements is that they require less deicing materials than their impervious counterparts. Use of deicing material on permeable pavement is therefore not recommended.
 
 
 
===Signage===
 
Permeable pavements can be used as opportunities for public education with signs explaining how they work.  Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type.
 
 
 
[[category: Design criteria]]
 
 
 
 
 
 
 
*runoff from adjacent impervious surfaces remains unburdened with sediment due to effective pre-treatment prior to entering the permeable pavement; or
 
*permeable pavement and contributing impervious pavements receive regular vacuuming to reduce and control sediment loads and surface clogging potential.
 
 
 
*Soil Subgrade Slope – The slope of the soil subgrade should be as flat as possible (i.e., less than 1 percent longitudinal slope) to enable even distribution and infiltration of stormwater. Lateral slopes should be less than 1 percent. Steep slopes can reduce the stormwater storage capacity of permeable pavement. Designers should consider using a terraced subgrade design for permeable pavement in sloped areas, especially when the subgrade slope exceeds 3 percent.
 
 
 
*Soil subgrade compaction – This should be avoided wherever possible to maximize infiltration. In some situations, compaction may be needed for supporting vehicular loads. In such cases, compaction density and subsequent soil infiltration should be assessed in a test pit(s) on the site to determine an acceptable soil density and its contribution to soil strength and infiltration. The measured infiltration rate for use in hydrologic calculations may be reduced by the designer to compensate for long-term sedimentation on the soil subgrade.
 
 
 
*Excavation methods - Excavation should be conducted in a manner that minimizes soil subgrade compaction.  Tracked rather than wheeled equipment is recommended working from the sides of the excavation. For larger projects, excavation can create cells and berms where equipment removes soil from one area or cell while positioned on higher soil around each cell. This process is further described in Section 4.2. Other techniques include ripping or loosening soils compacted by construction equipment. This can be done with the teeth on excavation equipment buckets. Compaction of the aggregate base into these areas is especially important since scarified soil can settle and be reflected on the surface.
 
 
 
*Surface slope – Surface slopes for all permeable pavement types should be at least 1 percent to provide an alternate means for drainage should the surface become completely clogged due to lack of maintenance. Designs should provide an alternate means for stormwater to enter the aggregate reservoir if the pavement surface should ever become clogged, or for extreme storm events. For pervious concrete and porous asphalt without curbs, this can be a 2 foot wide stone edge connected to the reservoir. For curbed pavements, inlets may be used.
 
 
 
*Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged.
 
 
 
*Minimum depth to seasonal high water table – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is required between the liner and the seasonal high water table.
 
 
 
*Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” [http://www.cleanwatermn.org/Documents/MS4%20toolkit%20files/Good%20Housekeeping/Porous%20Pavement/porouspa.pdf EPA 832-F-99-023]). Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases.
 
 
 
:Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners.
 
 
 
*Informed Owner – The property owner should clearly understand the unique maintenance responsibilities inherent with permeable pavement, particularly for parking lot applications. The owner should be capable of performing routine and long-term actions (e.g., vacuuming) to maintain the pavement’s hydrologic functions, and avoid future practices (e.g., winter sanding, seal coating or repaving) that diminish or eliminate them. For porous asphalt a diluted emulsion fog can be used as needed. Maintenance agreements, covenants, maintenance easements or performance bonds are encouraged between the local authority and the property owner.
 
 
 
{{alert|Permeable pavement can be used at highly developed urban sites that have little or no space retention.|alert-success}}
 
 
 
{{alert|Permeable pavements should be at least a minimum horizontal distance of 100 feet from any municipal water supply well|alert-danger}}
 
 
 
{{alert|A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table.|alert-danger}}
 
 
 
*Limitations – There are several limitations for use of permeable pavement, as summarized below.
 
**Permeable pavements should not be used in high pollutant loading sites. High pollutant loading sites are those that receive constant sediment or trash and/or debris. Places where fuels and chemicals are stored or handled can be potential stormwater hotspots and permeable pavement should not be constructed in these places. Likewise, areas subject to wind borne dust and sediment should not use permeable pavement unless the pavement can be vacuumed regularly. The following limitations should be considered before utilizing permeable pavements in any design.
 
**Permeable pavement is suitable for pedestrian-only areas, low-volume roads, low speed areas, overflow parking areas, residential driveways, alleys, and parking stalls. These can be residential collector roads or other applications with similar traffic loads.
 
**Permeable pavement can be prone to clogging from sand and fine sediments that fill void spaces and the joints between pavers. As a result, it should be used carefully where frequent winter sanding is necessary because the sand may clog the surface of the material. Periodic maintenance is critical, and surfaces should be cleaned with a vacuum sweeper at least two times a year.
 
**Fuel may leak from vehicles and toxic chemicals may leach from asphalt and/or binder surface. Porous pavement systems are not designed to treat these pollutants.
 
 
 
==Design criteria==
 
Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.
 
 
 
===Structural Design===
 
The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association ([http://www.pavement.com/ ACPA] 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association [http://www.nrmca.org/ NRMCA] and the Portland Cement Association ([http://www.rmc-foundation.org/images/PCRC%20Files/Hydrological%20&%20Environmental%20Design/PC_DesignManual.pdf Leming] 2007).
 
<p>Porous asphalt (Hansen 2008) and permeable interlocking pavements (Smith 2011) use flexible pavement design methods adopted from the 1993 AASHTO ''Guide for Design of Pavement Structures'' (AASHTO 1993). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.</p>
 
<p>There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.</p>
 
<p>Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:
 
*Pavement life and total anticipated traffic loads expressed as 18,000 lb equivalent single axle loads or ESALs (This method of assessing loads accounts for the additional pavement wear caused by trucks.)
 
*Soil strength expressed as the soaked California Bearing Ratio (CBR), R-value or resilient modulus (Mr)
 
*Strength of the surfacing, base and subbase materials
 
*Environmental factors including freezing climates and extended saturation of the soil subgrade</p>
 
<p>Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values under saturated conditions used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4%, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 psi (45 MPa) per AASHTO T-307. Soils with lower strengths typically require thickened permeable bases or those using cement or asphalt stabilized open-graded aggregates per Mn/DOT Pavement Manual, Section 3-3.01.02 Treated Base.</p>
 
<p>Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including
 
*use underdrains
 
*thicken the base/subbase layer(s)
 
*stabilize the base layers with cement or asphalt, and
 
*stabilize the soil with lime or cement.
 
These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
<p>Pedestrian applications can be placed on lower strength soils than those noted.</p>
 
 
 
===Hydrologic Sizing===
 
The soil subgrade infiltration rate typically is far lower than the flow rate through the pavement, so some reservoir storage will usually be required to maximize the stormwater benefit of permeable pavement. Often times permeable pavement is designed to store a given design storm. For instance, Minnesota’s Minimal Impact Design Standards ([[Performance goals for new development, re-development and linear projects|MIDS]]) require a performance goal of managing 1.1 inches of runoff from the tributary impervious surfaces. For this design standard, the volume of the reservoir layer will be required to store 1.1 inches of stormwater runoff entering from the impervious area plus rainfall directly into the permeable pavement itself.
 
 
 
Infiltration of runoff into the subgrade provides more stormwater treatment benefit than filtering through the base and exiting via underdrains. For this reason, adding and underdrain at the bottom of the storage reservoir (on top of the subgrade soil) at sites with HSG A or B subgrade soil is typically not recommended. This is sometimes done to provide a “factor of safety.” This is often unnecessary and reduces the overall effectiveness of permeable pavement as a BMP.
 
 
 
<math>d_p = ((d_c R) + P – (i/2 t_f)) / V_r</math>
 
 
 
where
 
:''d<sub>p</sub>'' = the depth of the reservoir layer (feet);
 
:''d<sub>c</sub>'' = the depth of runoff from the contributing drainage area (not including the permeable paving surface) for the design storm (feet);
 
:''R'' = ''A''<sub>''c''</sub>/''A''<sub>''p''</sub> The ratio of the contributing drainage area (''A''<sub>''c''</sub>, not including the permeable paving surface) to the permeable pavement surface area (''A''<sub>''p''</sub>);
 
:''P'' = the rainfall depth for the Treatment Volume (1.1 inch), or other design storm (feet);
 
:''i'' = the field-verified infiltration rate for native soils (feet per day);
 
:''t<sub>f</sub>'' = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day; and
 
:''V<sub>r</sub>'' = the void ratio for the reservoir layer (typically 0.4).
 
 
 
The maximum allowable depth of the reservoir layer is constrained by the maximum allowable drain time, which is calculated using the following equation.
 
 
 
<math>d_{p-max} = (i/2 t_d) / V_r</math>
 
 
 
where
 
:''d<sub>p-max</sub>'' = the maximum depth of the reservoir layer (feet); and
 
:''t<sub>d</sub>'' = the maximum allowable time to drain the reservoir layer, typically 1 to 2 days
 
 
 
<p>The following design assumptions apply to the previous equations:
 
*The contributing drainage area (''A''<sub>''c''</sub>) does not contain pervious areas.
 
*Compacted pervious areas that contribute runoff are included as a portion of the contributing drainage area (''A<sub>c</sub>'')
 
*For design purposes, the subgrade soil infiltration rate (''i'') should be the lesser of either (1) a field-tested soil infiltration rate with a correction factor applied as recommended by the MN Stormwater Manual or (2) the typical infiltration rate for the given HSG as stated in the MN Stormwater Manual
 
*The void ratio (V<sub>''r''</sub>) for the base and subbase stone layers = 0.4.
 
*The maximum drain time for the reservoir layer should be not less than 24 hours or greater than 48 hours after the initial 24-hour storm event.</p>
 
<p>If the depth of crushed stone below the pavement (depth of reservoir, d<sub>p</sub>) is greater than the maximum allowable depth of reservoir, d<sub>p-max</sub> an underdrain should be added at the elevation of d<sub>p-max</sub> to provide an overflow. The storage volume in the pavements must account for the underlying infiltration rate and outflow through the underdrain. In this case, the design storm should be routed through the pavement to accurately determine the required reservoir depth.</p>
 
 
 
===Outflow Rate and Volume Through Underdrains===
 
If the depth of the base/subbase for the full infiltration system is excessive, (i.e. d<sub>p</sub> exceeds d<sub>max</sub>) because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains). The same symbols apply, but with the following additions:
 
 
 
:''q<sub>u</sub>'' = outflow through underdrain, feet/hour
 
:''k'' = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour
 
:''m'' = underdrain pipe slope, feet/feet
 
:''n'' = number of underdrain pipes
 
:''T<sub>fill</sub>'' = effective filling time of the base/subbase which is at or above the underdrain(s), hours.
 
:''T<sub>1</sub>'' = the storage time during which the water is at or above the underdrain(s), hours.
 
:''d<sub>below</sub>'' = depth of the subbase below the underdrains, feet
 
 
 
The outflow rate from underdrain(s) can be approximated by
 
 
 
<math>q_u = k x m</math>
 
  
This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately17,000 feet/day or 8,500 inches/hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet/day per pipe can be used to approximate the average underdrain outflow rate.
+
==Major design elements==
 +
The following design elements apply to permeable pavement.
  
Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by
+
===Minimum separation distance===
 +
{{alert|It is ''REQUIRED'' that infiltration practices be designed with a minimum vertical distance of 3 feet between the bottom of the infiltration practice and the seasonally high water table or bedrock layer. See also Step 8 under the Design procedures section.|alert-danger}}
  
<math>d_p = D Q_u R + (P – fT) – q_u (T_{fil})n / V_r</math>
+
Local authorities may require greater separation depths.
 +
<p>It is ''HIGHLY RECOMMENDED'' that infiltration practices not be hydraulically connected to structure foundations or pavement, to avoid seepage and frost heave concerns, respectively. If groundwater contamination is a concern, it is ''RECOMMENDED'' that [[Glossary#G|groundwater]] mapping be conducted to determine possible connections to adjacent groundwater wells. </p>
  
To estimate the number of underdrain pipes (n), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number.
+
===Setback distances===
 +
{{alert|The minimum setback distance from a stormwater infiltration system to a public water-supply well is 100 feet for wells classified as sensitive and 50 feet for all other public supply wells, as ''REQUIRED'' by the Minnesota Department of Health. See [http://www.health.state.mn.us/divs/eh/wells/construction/isolate.html MDH isolation distances]  (pollutant or contaminant that may drain into the soil)|alert-danger}}
  
''T<sub>fill</sub>'' = ''T'' when the underdrains are at the bottom of the subbase. ''T<sub>fil</sub>'' = ½''T'' (approximation) when the underdrains are raised.
+
{{alert|The minimum setbacks in the table below are ''HIGHLY RECOMMENDED'' for the design and location of infiltration practices. It will be necessary to consult local ordinances for further guidance on siting infiltration practices.|alert-warning}}
  
With full infiltration systems, the maximum allowable drain time (''d''<sub>''max''</sub>) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade. However, for partial infiltration systems, there is a second method of storage water discharge, namely the underdrains. The depth and number of underdrains are variables that can be adjusted (unlike the infiltration rate into the soil subgrade) so that the actual drain time equals or is less than the maximum allowable drain time. If the discharge of the underdrains is included, then
+
{{:Summary of horizontal and vertical setback distances}}
  
<math>d_{max} = fT_s+ q_uT_1 n / V_r = d_p</math>
+
'''Karst:''' It is ''HIGHLY RECOMMENDED'' that infiltration practices not be used in active karst formations without adequate geotechnical testing.
  
Rearranging the previous equation, the storage time during which the water is at or above the underdrain(s) (hours) is given by
+
'''Wellhead Protection Areas''': It is ''HIGHLY RECOMMENDED'' to review the [https://www.health.state.mn.us/communities/environment/water/swp/index.htm Minnesota Department of Health guidance] on stormwater infiltration in Wellhead Protection Areas.
  
<math>T_1 = ((V_rd_p) – (fT_s)) / (q_u n)</math>
+
===Pretreatment===
 +
{{alert|It is ''REQUIRED'' that some form of pretreatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.|alert-danger}}
  
The elevation of the pipe above the soil subgrade is then given by
+
It is ''HIGHLY RECOMMENDED'' that the following pretreatment sizing guidelines be followed:
 +
*Before entering an infiltration practice, stormwater should first enter a pretreatment practice sized to treat a minimum volume of 25 percent of the V<sub>wq</sub>.
 +
*If the infiltration rate of the native soils exceeds 2 inches per hour a pretreatment practice capable of treating a minimum volume of 50 percent of the V<sub>wq</sub> should be installed.
 +
*If the infiltration rate of the native soils exceeds 5 inches per hour a pretreatment practice capable of treating a minimum volume of 100 percent of the V<sub>wq</sub> should be installed.
 +
<p>It is ''HIGHLY RECOMMENDED'' that pretreatment practices be designed such that exit velocities from the pretreatment systems are non-erosive (less than 3 feet per second) and flows are evenly distributed across the width of the practice (e.g., by using a level spreader).</p>
  
<math>d_{below} = f(T_s – T_1) / V_r</math>
+
===Depth===
 +
The depth of an infiltration practice is a function of the maximum drawdown time and the design infiltration rate.
  
Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design.  
+
{{alert|The REQUIRED drawdown time for infiltration practices is 48 hours or less, and so the depth of the practice should be determined accordingly.|alert-danger}}
  
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
+
{{alert|'''Groundwater Protection:''' It is ''REQUIRED'' that runoff from potential stormwater hotspots (PSHs) not be infiltrated unless adequate pretreatment has been provided. Infiltration of runoff from confirmed hotspot areas, industrial areas with exposed significant materials, or vehicle fueling and maintenance areas is ''PROHIBITED''.|alert-danger}}
 
 
Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.
 
 
 
===Design for Nutrient and TSS Reductions===
 
Permeable pavements can be designed to reduce nutrient loadings to the ground or surface waters. The design needs to be specifically designed to capture nitrogen and/or phosphorus. It is important to note that nitrogen and phosphorus each require specific designs to facilitate their removal from stormwater. The following paragraphs describe the design characteristics necessary for the removal of phosphorus and nitrogen.
 
 
 
Permeable pavement nitrate reduction capabilities can be enhanced in partial infiltration designs that detain water in the base/subbase for over 24 hours. This duration of time is required to ensure de-nitrification occurs. However, a study by Bean et al. (2007a) showed higher nitrate concentrations in the exfiltrate which was possibly due to the nitrification process.
 
 
 
PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce phosphorous. Coated aggregates (sometimes called “engineered aggregates”) have an effective life of seven to ten years and target the removal of dissolved phosphorous.
 
 
 
A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction ([http://conservancy.umn.edu/bitstream/115602/1/pr549.pdf Erickson] 2010). Their effectiveness, initial cost, and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration if continued phosphorus reduction credit is desired. Concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions.  
 
 
 
A second approach useful for nutrient and TSS reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification if appropriately designed. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.
 
 
 
===Soil Infiltration Rate Testing===
 
Prior to infiltration testing, several soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Boring depths should be at least 2 feet deeper than the anticipated depth of the permeable pavement. At least one soil boring must be taken to confirm the underlying soil properties at the depth where infiltration is designed to occur (i.e., to ensure that the [[Shallow groundwater|depth to water table]], [[Shallow soils and shallow depth to bedrock |depth to bedrock]], or [[Karst|karst]] is defined). The depth to bedrock can be highly variable over small areas, so soil borings should be conducted where the permeable pavement will be constructed. For sites with a consistent soil type, a minimum of one soil permeability test per ASTM D3385 or D5093 must be taken per 25,000 square feet of planned permeable pavement surface area. In most cases where the soil type is consistent throughout the site, a single soil test is sufficient for applications less than 25,000 sf. Additional infiltration tests are required per 25,000 square feet of planned permeable pavement area if the soil borings reveal changes in soil type. The median test result from all infiltration test values should be used as the design infiltration rate. Soil infiltration testing should be conducted within any confining layers that are found within five feet of the bottom of a proposed permeable pavement system.
 
 
 
===Conveyance and Overflow===
 
Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that accomplish this:
 
*Place a perforated pipe horizontally near the top of the reservoir layer to pass excess flows after water has filled the base. The placement and/or design should be such that the incoming runoff is not captured (e.g., placing the perforations on the underside only). Pipe placement should be away from wheel loads to prevent damage.
 
*Increase the thickness of the top of the reservoir layer.
 
*Create underground detention within the reservoir layer of the permeable pavement system. Reservoir storage may be augmented by corrugated metal pipes, plastic or concrete arch structures, etc.
 
*Route excess flows to another detention or conveyance system that is designed for management of extreme event flows.
 
*Set the storm drain inlets level with the elevation of the permeable pavement surface to effectively convey excess stormwater runoff past the system. The design should also make allowances for relief of unacceptable ponding depths during larger rainfall events.
 
 
 
===Reservoir Layer===
 
The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40% per [http://www.astm.org/ ASTM] C29. Reservoir base layers for pervious concrete are typically washed AASHTO No. 57 stone and those for porous asphalt are [http://www.transportation.org/Pages/default.aspx AASHTO] No. 2, 3, or 5. PICP uses AASHTO No. 2, 3, or 4 stone.
 
 
 
If exposed to vehicular loads, all crushed stone should be Minnesota Department of Transportation (MnDOT) Class A or B coarse aggregate, minimum 80% crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro, or similar material. The maximum [http://www.dot.state.mn.us/materials/manuals/laboratory/1210.pdf Los Angeles Rattler Loss] should be 35% per AASHTO T-96 and no greater loss than 10% per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the [http://www.dot.state.mn.us/materials/labmanual.html MnDOT Laboratory Manual] (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.
 
 
 
===Underdrains===
 
Underdrains install quickly when placed on or in the soil subgrade, surrounded by stone base materials. The outflow portion at the end is not perforated and is raised to a designed height that allows for some water detention prior to outflow. Placement at this elevation also protects the pipe with aggregate during base compaction. For permeable pavement bases/subbases using 2 or 3 inch maximum size aggregates, underdrain pipes with them should be surrounded with at least 4 inches of ASTM No. 57 (maximum 1 inch size aggregate) to protect the pipes during compaction. An underdrain(s) can also be installed and capped at a downstream structure as an option for future use if maintenance observations indicate a reduction in the soil permeability.
 
 
 
===Maintenance===
 
Proper maintenance of permeable pavement is crucial for ensuring its longevity and functionality. Some portions of the maintenance plan require planning during the design stages. These items are noted below.
 
*Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm.
 
*Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface. Prior to construction, owners should commit to a vacuuming plan that includes vacuuming frequency and equipment needs. The vacuuming frequency typically depends on the time of year. In the spring, tree buds and seeds necessitate frequent vacuuming.  In the fall, tree leaves and acorns necessitate frequent vacuuming. In the summer, vacuuming frequency depends on permeable pavement exposure to organic material from trees and nearby vegetated areas. Vacuum equipment and methods for sediment removal are provided in Section 5.
 
  
 
==Materials specifications==
 
==Materials specifications==
Line 381: Line 253:
  
 
A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.
 
A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.
 +
 
{{:Summary of specifications for permeable pavement}}
 
{{:Summary of specifications for permeable pavement}}
  
Line 393: Line 266:
  
 
===Signage===
 
===Signage===
Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type.  
+
Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type.
 +
 
 +
==Design checklists==
 +
Design checklists have not been developed for the Minnesota Stormwater Manual. Below are links to checklists developed by other organizations.
 +
 
 +
*[https://secureservercdn.net/166.62.110.232/e6d.7d8.myftpupload.com/wp-content/uploads/2020/07/Permeable-Pavement-Check-List-July2019.pdf Iowa Stormwater Education Partnership, Permeable Paver Design Review Checklist]
 +
*[https://www.slideshare.net/Cartegraph/permeable-pavement-check-list Cartegraph, Permeable Pavement Design Review checklist]
 +
 
 +
<noinclude>
 +
 
 +
==Related articles==
 +
*[[Overview for permeable pavement]]
 +
*[[Types of permeable pavement]]
 +
*[[Design criteria for permeable pavement]]
 +
*[[Construction specifications for permeable pavement]]
 +
<!--[[Construction observations for permeable pavement]]-->
 +
*[[Assessing the performance of permeable pavement]]
 +
*[[Operation and maintenance of permeable pavement]]
 +
*[[Calculating credits for permeable pavement]]
 +
<!--[[Cost-benefit considerations for permeable pavement]]-->
 +
*[[Case studies for permeable pavement]]
 +
*[[Green Infrastructure benefits of permeable pavement]]
 +
*[[Summary of permit requirements for infiltration]]
 +
*[[Permeable pavement photo gallery]]
 +
*[[Additional considerations for permeable pavement]]
 +
*[[Links for permeable pavement]]
 +
<!--*[[External resources for permeable pavement]]-->
 +
*[[References for permeable pavement]]
 +
<!--*[[Supporting material for permeable pavement]]-->
 +
*[[Fact sheets for permeable pavement]]
 +
*[[Requirements, recommendations and information for using permeable pavement BMPs in the MIDS calculator]]
 +
<!--#[[Permeable pavement credits]]-->
  
 +
[https://stormwater.pca.state.mn.us/index.php?title=Permeable_pavement Permeable pavement main page]
  
[[category: Design criteria]]
+
[[Category:Level 3 - Best management practices/Specifications and details/Design criteria]]
 +
</noinclude>

Latest revision as of 17:30, 29 December 2022

image
This schematic illustrates typical pervious concrete cross section and basic components of a pervious concrete system
Schematic illustrating typical pervious concrete cross section and basic components of a pervious concrete system.
This schematic illustrates typical porous asphalt cross section and basic components of a pervious concrete system
Schematic illustrating typical porous asphalt cross section and basic components of a pervious concrete system.
This schematic illustrates typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system
Schematic illustrating typical permeable interlocking concrete pavement cross section and basic components of a pervious concrete system.
Green Infrastructure: Permeable pavement can be an important tool for retention and detention of stormwater runoff. Permeable pavement may provide additional benefits, including reducing the need for de-icing chemicals, and providing a durable and aesthetically pleasing surface.

This section provides information on design considerations, criteria and specifications for permeable pavement. Base/subbase thickness is determined for water storage using hydrologic sizing and/or dynamic modeling over time. Base/subbases thickness for supporting traffic is determined using structural design methods. The thicker of the two resulting designs is employed.

Design phase maintenance considerations

Implicit in the design guidance is the fact that many design elements of infiltration and filtration systems can minimize the maintenance burden and maintain pollutant removal efficiency. Key examples include

  • limiting drainage area;
  • providing easy site access (REQUIRED); and
  • providing pretreatment (REQUIRED).

For more information on design information for individual infiltration and filtration practices, link here.

Hydrologic design considerations

Permeable pavement is subject to the following design considerations, including benefits and constraints.

  • Available space – A significant advantage of permeable pavement is its ability to combine detention/ infiltration and pavement, thereby reducing or eliminating land required for detention facilities. This is especially important in urban areas with high land prices and highly developed sites with little or no space for stormwater detention.
  • Soils – Soil conditions and infiltration rates determine the use of an underdrain. (NRCS Hydrologic Soil Group (HSG) C or D soils usually require an underdrain, whereas HSG A and B soils often do not.) Designers should evaluate existing soil properties during initial site layout with the goal of configuring permeable pavement that conserves and protects soils with the highest infiltration rates. In particular, areas of HSG A or B soils shown on soil surveys should be considered as primary locations for all types of infiltration practices.
Soil surveys and HSG classifications provide a general estimate of the soil's infiltration rate. Soil infiltration rates can also be estimated from soil classifications per ASTM D2487. However, it is best to determine rates using on-site infiltration testing per ASTM D3385 Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer, D5093 Standard Test Method for Field Measurement of Infiltration Rate Using Double-Ring Infiltrometer with Sealed-Inner Ring or other available methods. The median rate determined from in-situ measurements should be reduced by a factor of 2.5 and this reduced value used in design calculations. This reduction accounts for incidental compaction during construction and sedimentation of the subgrade over time.
Information: The safety factor of 2.5 is greater than a factor of 2 recommended in most guidance for permeable pavement. This manual utilizes recommended soil infiltration rates for hydrologic soil groups (see [1]). These are not as conservative as infiltration rates based on the Unified Soil Classification System, particularly for finer textured soils. We therefore recommended the more conservative value of 2.5
In most cases, permeable pavement should not be situated above fill soils. Designs in compacted fill soils may require an impermeable liner and an underdrain. Permeable pavements should only be placed on fill soils when laboratory tests indicate the compacted fill will be stable when saturated and that slope stability of deep fills has been verified by a geotechnical engineer.
  • Geotextiles - In the absence of full-depth concrete curbs or impermeable liners, geotextiles are recommended on the (vertical) sides of permeable pavements to separate the reservoir layers from the adjacent soil subgrade. Horizontally placed geotextiles between the aggregate base and soil subgrade are at the option of the designer. Geotextile use should be carefully evaluated and selection should be guided by AASHTO M-288 Geotextile for Highway Applications (AASHTO 2010). Specific selection guidance is provided under the Subsurface Drainage section. Class II geotextiles are generally used.
  • Contributing drainage area – Permeable pavements sometimes capture runoff from adjacent areas, pavements, and roofs. Runoff from permeable areas is not recommended due to potential clogging of the permeable pavement. The at-grade contributing drainage area into permeable pavement should generally not exceed twice the surface area of the permeable pavement. This guideline helps reduce the rate of surface sedimentation. The 2:1 ratio can be increased to no greater than 5:1 if at least one of these conditions exists:
    • permeable pavement is receiving runoff from roofs as it tends to be very low in sediment; or
    • runoff from adjacent impervious surfaces remains unburdened with sediment due to effective pretreatment prior to entering the permeable pavement.

For more information on contributing area, see Contributing drainage area to stormwater BMPs.

Caution: Permeable pavement and contributing impervious pavements are assumed to receive regular vacuuming to reduce and control sediment loads and surface clogging potential.
  • Soil subgrade slope – The slope of the soil subgrade should be as flat as possible (i.e., less than 1 percent longitudinal slope) to enable even distribution and infiltration of stormwater. Lateral slopes should be less than 1 percent. Steep slopes can reduce the stormwater storage capacity of permeable pavement. Designers should consider using a terraced subgrade design for permeable pavement in sloped areas, especially when the subgrade slope exceeds 3 percent.
  • Soil subgrade compaction – This should be avoided wherever possible to maximize infiltration. In some situations, compaction may be needed for supporting vehicular loads. In such cases, compaction density and subsequent soil infiltration should be assessed in a test pit(s) on the site to determine an acceptable soil density and its contribution to soil strength and infiltration. The measured infiltration rate for use in hydrologic calculations may be reduced by the designer to compensate for long-term sedimentation on the soil subgrade.
  • Excavation methods - Excavation should be conducted in a manner that minimizes soil subgrade compaction. Tracked rather than wheeled equipment is recommended working from the sides of the excavation. For larger projects, excavation can create cells and berms where equipment removes soil from one area or cell while positioned on higher soil around each cell (see Construction specifications for permeable pavement). Other techniques include ripping or loosening soils compacted by construction equipment. This can be done with the teeth on excavation equipment buckets. Compaction of the aggregate base into these areas is especially important since scarified soil can settle and be reflected on the surface.
  • Surface slope – Surface slopes for all permeable pavement types should be at least 1 percent to provide an alternate means for drainage should the surface become completely clogged due to lack of maintenance. Designs should provide an alternate means for stormwater to enter the aggregate reservoir if the pavement surface should ever become clogged, or for extreme storm events. For pervious concrete and porous asphalt without curbs, this can be a 2 foot wide stone edge connected to the reservoir. For curbed pavements, inlets may be used.
  • Overflow structures – Permeable pavements are not designed to store and infiltrate all stormwater from all storms. Therefore, an outlet or outlets are required to prevent water from rising into and over the surface. One type of outlet control would be a catch basin with an internal weir and low-flow orifice. The catch basin can also handle runoff from the surface should it become clogged.
  • Minimum depth to seasonal high water table – A high groundwater table may cause seepage into the bottom of permeable pavement and prevent complete drainage. Also, soil acts as a filter for pollutants between the bottom of the pavement base and the water table. Therefore, a minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table. For systems with impermeable liners, a minimum of one foot clearance is Highly recommended between the liner and the seasonal high water table.
  • Setbacks – To avoid harmful seepage, permeable pavement should not be hydraulically connected to building foundations unless an impermeable liner is placed against the foundation or basement wall. Even under these circumstances, great care should be taken to avoid creating a wet basement problem. If there is no liner, the permeable pavement base should be 10 feet or greater from structures (EPA recommends a minimum setback from building foundations of 10 feet down-gradient and 100 feet up-gradient. See EPA factsheet “Storm Water Technology Fact Sheet: Porous Pavement,” EPA 832-F-99-023). Again, it is the designer’s responsibility to avoid creating a wet basement problem. Likewise, permeable pavement bases should be hydraulically separated from adjacent road bases.
Permeable pavements without underdrains infiltrate stormwater and should follow requirements for wellhead protection (EPA recommends a minimum setback of 100 feet from water supply wells). Underground utility lines are best located away from permeable pavement bases. However, if they need to penetrate the base, consideration should be given to waterproofing (depending on the utility) or possible encasement using low-strength flowable concrete fill. Setbacks can be reduced at the discretion of the local authority for designs that use underdrains and/or liners.
  • Informed Owner – The property owner should clearly understand the unique maintenance responsibilities inherent with permeable pavement, particularly for parking lot applications. The owner should be capable of performing routine and long-term actions (e.g., vacuuming) to maintain the pavement’s hydrologic functions, and avoid future practices (e.g., winter sanding, seal coating or repaving) that diminish or eliminate them. For porous asphalt a diluted emulsion fog can be used as needed. Maintenance agreements, covenants, maintenance easements or performance bonds are encouraged between the local authority and the property owner.
Green Infrastructure: Permeable pavement can be used at highly developed urban sites that have little or no space retention.
Caution: The required setback distance to a municipal water supply well is 50 feet, but it is recommended that permeable pavements be a minimum horizontal distance of 100 feet from any municipal water supply well
Warning: A minimum vertical separation of 3 feet is required between the bottom of the permeable pavement reservoir layer and the seasonal high groundwater table (saturated soil) or the top of bedrock (i.e. there must be a minimum of 3 feet of undisturbed soil beneath the infiltration practice and the seasonally high water table or top of bedrock).
  • Limitations – There are several limitations for use of permeable pavement, as summarized below.
    • Permeable pavements should not be used in high pollutant loading sites. High pollutant loading sites are those that receive constant sediment or trash and/or debris. Places where fuels and chemicals are stored or handled can be potential stormwater hotspots and permeable pavement should not be constructed in these places. Likewise, areas subject to wind borne dust and sediment should not use permeable pavement unless the pavement can be vacuumed regularly. The following limitations should be considered before utilizing permeable pavements in any design.
    • Permeable pavement is suitable for pedestrian-only areas, low-volume roads, low speed areas, overflow parking areas, residential driveways, alleys, and parking stalls. These can be residential collector roads or other applications with similar traffic loads.
    • Permeable pavement can be prone to clogging from sand and fine sediments that fill void spaces and the joints between pavers. As a result, it should be used carefully where frequent winter sanding is necessary because the sand may clog the surface of the material. Periodic maintenance is critical, and surfaces should be cleaned with a vacuum sweeper at least two times a year.
    • Fuel may leak from vehicles and toxic chemicals may leach from asphalt and/or binder surface. Porous pavement systems are not designed to treat these pollutants.

Design criteria

Base/subbase thickness is determined for support traffic using structural design methods and for water storage using hydrologic sizing and/or dynamic modeling over time. The thicker of the two resulting designs is used.

Structural design

The structural design process for supporting vehicles varies according to the type of pavement selected. The pervious concrete industry is in the process of developing ASTM test methods for characterizing compressive or flexural strengths of pervious concrete. These tests are needed to model fatigue under loads. As an interim step, fatigue equations published by the American Concrete Pavement Association (ACPA 2010) assume such inputs to be comparable in nature (but not magnitude) to those used for conventional concrete pavements. The ACPA design method should be consulted for further information as well as pervious concrete industry software. General guidelines for pervious concrete surface thickness are published by the National Ready Mix Concrete Association NRMCA and the Portland Cement Association.

Porous asphalt (Hansen 2008) and permeable interlocking pavements (Smith 2011) use flexible pavement design methods adopted from the 1993 AASHTO Guide for Design of Pavement Structures (AASHTO 1993). In addition, MnDOT design methods, approved mechanistic principles, and manufacturer’s specific recommendations should be consulted.

There has been limited research on full-scale testing of the structural behavior of open-graded bases used under permeable pavements to better characterizing relationships between loads and deformation. Therefore, conservative values (i.e., AASHTO layer coefficients) should be assumed for open-graded base and subbase aggregates in permeable pavement design.

Regardless of type of permeable pavement, structural design methods consider the following in determining surface and base thicknesses to support vehicular traffic:

  • pavement life and total anticipated traffic loads expressed as 18,000 pounds equivalent single axle loads or ESALs (This method of assessing loads accounts for the additional pavement wear caused by trucks.);
  • soil strength expressed as the soaked California Bearing Ratio (CBR), R-value or resilient modulus (Mr);
  • strength of the surfacing, base and subbase materials; and
  • environmental factors including freezing climates and extended saturation of the soil subgrade.

Soil stability under traffic should be carefully reviewed for each application by a qualified geotechnical or civil engineer and lowest anticipated soil strength or stiffness values under saturated conditions used for design. Structural design for vehicular applications should generally be on soil subgrades with a CBR (96-hour soaked per ASTM D 1883 or AASHTO T 193) of 4 percent, or a minimum R-value = 9 per ASTM D 2844 or AASHTO T-190, or a minimum Mr of 6,500 pounds per square inch (45 Mega Pascals) per AASHTO T-307. Soils with lower strengths typically require thickened permeable bases or those using cement or asphalt stabilized open-graded aggregates per Mn/DOT Pavement Manual, Section 3-3.01.02 Treated Base.

Soil compaction required to achieve these soil strengths will reduce the infiltration rate of the soil. Therefore, the permeability or infiltration rate of soil should be assessed at the density required to achieve one of these values. If soils under vehicular traffic have lower strengths than those noted above, or are expansive when wet, there are several options, including

  • underdrains;
  • thickened base/subbase layer(s);
  • cement or asphalt stabilized base layers; and
  • lime or cement stabilized (with design consideration given to practically no infiltration in such cases).

These options are typically used in combination. Pedestrian applications can be placed on lower strength soils than those noted.

Pedestrian applications can be placed on lower strength soils than those noted.

Outflow rate and volume through underdrains

If the depth of the base/subbase for the full infiltration system is excessive, because, as an example, the design subgrade soil infiltration rate is not adequate to remove the water from the design storm within the designated period of time, then the design should include underdrains. The following procedure is for sizing the base/subbase for partial infiltration designs (i.e. contains underdrains).

The outflow rate from underdrain(s) can be approximated by

\(q_u = k m\)

where

qu = outflow through underdrain, feet/hour
k = Coefficient of permeability for each 6 inch diameter underdrain, feet/hour
m = underdrain pipe slope, feet/feet

This equation is based on Darcy’s Law, which summarizes several properties that groundwater exhibits while flowing in aquifers. Although the hydraulic conductivity (measure of the ease with which water can move through pore spaces of a material) of the aggregate subbase is very high (approximately 17,000 feet per day or 8,500 inches per hour), the discharge rate through underdrains is limited by the cross sectional area of the pipe. As the storage volume above/around the underdrain(s) decreases (i.e., the hydraulic head or water pressure decreases), the base/subbase and in turn the underdrain(s) will drain increasingly slower. To account for this change in flow conditions within the subbase and underdrain(s) over time, a very conservative coefficient of permeability (k) of 100 feet per day per pipe can be used to approximate the average underdrain outflow rate.

Once the outflow rate through each underdrain has been approximated, the depth of the base/subbase needed to store the design storm can be determined by

\(d_p = ((0.95 * RP) – (i/2)t_f)) / n\)

where

0.95 is the runoff coefficient for impermeable surfaces;
dp = the depth of the reservoir layer (feet);
R = Ac/Ap The ratio of the contributing drainage area (Ac, including the permeable paving surface), to the permeable pavement surface area (Ap);
tf = the time to fill the reservoir layer (day) – typically 2 hours or 0.083 day;
P = the rainfall depth for the design storm (feet);
i = field-verified infiltration rate (ft/day); and
n = porosity (cubic feet/cubic feet)

To estimate the number of underdrain pipes (N), take the dimension of the parking lot in the direction the pipes are to be placed and divide by the desired spacing between pipes – round down to the nearest whole number.

With full infiltration systems, the maximum allowable drain time (td) needs to be calculated to make sure the stored water within the base/subbase does not take too long to infiltrate into the soil subgrade.

\(t{d} = (d_pn) / (0.5i) \)

The total storage in the permeable pavement system, Vs, is given by

\( V_{s} = A_{p} (d_pn + 0.5it_{f}) \)

where

Ap is the surface area of the permeable pavement (ft2).

When calculating the storage volume for compliance with the Construction Stormwater Permit, only the instantaneous storage volume is considered

\( V_{s} = A_{p} (d_pn) \)

Permeable pavement can also be designed to augment detention storage needed for channel protection and/or flood control. The designer can model various approaches by factoring in storage within the base/subbase, expected infiltration and any outlet structures used as part of the design.

Once runoff passes through the surface of the permeable pavement system, designers should calculate outflow pathways to handle subsurface flows. Subsurface flows can be regulated using underdrains, the volume of storage in the reservoir layer, the bed slope of the reservoir layer, and/or a control structure at the outlet.

Design for nutrient and TSS reductions

Permeable pavements can be designed to reduce nutrient loadings to the ground or surface waters. The design needs to be specifically designed to capture phosphorus. The permeable pavement system can also be designed to capture nitrogen, although it is important to note that nitrogen and phosphorus each require specific designs to facilitate their removal from stormwater. The following paragraphs describe the design characteristics necessary for the removal of phosphorus and nitrogen.

A study by (Bean, 2007a) showed higher nitrate concentrations in the exfiltrate compared to the infiltrate. Nitrogen reduction capabilities of permeable pavement can be enhanced in partial infiltration designs that detain water in the base/subbase for over 24 hours. This time is required to ensure complete de-nitrification occurs.

PICP can use specially coated aggregates in the joints and bedding and all systems can use them in the base to reduce phosphorous. Coated aggregates (sometimes called “engineered aggregates”) have an effective life of seven to ten years and target the removal of dissolved phosphorous, according to manufacturer’s literature.

A filter layer made of sand or fine aggregate placed under or sandwiched within permeable pavement bases are occasionally used as a means to reduce nutrients. This layer can be enhanced with iron filings for phosphorous reduction (Erickson 2010). Their effectiveness, initial cost, reduction in flow rates, and maintenance costs should be weighed against other design options for nutrient reductions. Sand filters will incur additional construction expense and this can be reduced by placing sand filters under the subbase at the down slope end of a permeable pavement. The disadvantage of sand filters is that they will eventually require removal and restoration if continued phosphorus reduction credit is desired. Concentrating their location in the down slope areas of the site can help reduce future maintenance costs and site disruptions.

A second approach useful for nutrient and TSS reduction can occur on sloping sites by creating intermittent berms in the soil subgrade. These enable settlement of suspended solids and encourage de-nitrification if appropriately designed. A third alternative is using a “treatment train” approach where a permeable pavement initially filters runoff and the remaining water outflows to bioswales or rain gardens adjacent to the pavement for additional processing and nutrient reduction. There may be additional BMPs used to remove nutrients as the water moves through the watershed.

Soil infiltration rate testing

Prior to infiltration testing, soil borings should be taken with an auger to assess the consistency of the soil type and horizons. Guidance for conducting infiltration tests and for determining the number of borings can be found here.

Conveyance and overflow

Permeable pavement designs should include methods to convey larger storms (e.g., 2-year, 10-year) to the storm drain system. The following is a list of methods that accomplish this.

  • Place a perforated pipe horizontally near the top of the reservoir layer to pass excess flows after water has filled the base. The placement and/or design should be such that the incoming runoff is not captured (e.g., placing the perforations on the underside only). Pipe placement should be away from wheel loads to prevent damage.
  • Increase the thickness of the top of the reservoir layer.
  • Create underground detention within the reservoir layer of the permeable pavement system. Reservoir storage may be augmented by corrugated metal pipes, plastic or concrete arch structures, etc.
  • Route excess flows to another detention or conveyance system that is designed for management of extreme event flows.
  • Set the storm drain inlets level with the elevation of the permeable pavement surface to effectively convey excess stormwater runoff past the system. The design should also make allowances for relief of unacceptable ponding depths during larger rainfall events.

Reservoir layer

The reservoir below the permeable pavement surface should be composed of clean, washed crushed stone aggregate and thickness sized for both the storm event to be stored and the structural requirements of the expected traffic loading. The recommended minimum void ratio should be 40 percent per ASTM C29. Reservoir base layers for pervious concrete are typically washed AASHTO No. 57 stone and those for porous asphalt are AASHTO No. 2, 3, or 5. PICP uses AASHTO No. 2, 3, or 4 stone.

If exposed to vehicular loads, all crushed stone should be Minnesota Department of Transportation (MnDOT) Class A or B coarse aggregate, minimum 80 percent crushed, typically granite, basalt, gneiss, trap rock, diabase, gabbro, or similar material. The maximum Los Angeles Rattler Loss should be 35 percent per AASHTO T-96 and no greater loss than 10 percent per AASHTO T-104 Magnesium Sulfate Soundness Test on the non-igneous portions and as modified by the MnDOT Laboratory Manual (MNDOT 2005). Limestone aggregates not meeting these requirements are not recommended in vehicular applications. Class C and D aggregates may be used in areas subject only to pedestrian traffic.

Underdrains

Underdrains install quickly when placed on or in the soil subgrade, surrounded by stone base materials. The outflow portion at the end is not perforated and is raised to a designed height that allows for some water detention prior to outflow. Placement at this elevation also protects the pipe with aggregate during base compaction. For permeable pavement bases/subbases using 2 or 3 inch maximum size aggregates, underdrain pipes with them should be surrounded with at least 4 inches of ASTM No. 57 (maximum 1 inch size aggregate) to protect the pipes during compaction. An underdrain(s) can also be installed and capped at a downstream structure as an option for future use if maintenance observations indicate a reduction in the soil permeability.

Maintenance

Proper maintenance of permeable pavement is crucial for ensuring its longevity and functionality. Some portions of the maintenance plan require planning during the design stages. These items are noted below.

  • Observation Well – Typically this consists of a well-anchored, six-inch diameter perforated PVC pipe that extends vertically to the bottom of the reservoir layer. This is installed at the down slope end of the permeable pavement. The observation well should be fitted with a lockable cap installed flush with the ground surface (or under the pavers) to facilitate periodic inspection and maintenance. The observation well enables visual monitoring of drawdown within the reservoir layer after a storm.
  • Overhead Landscaping – Some communities require a certain percentage of parking lots to be landscaped. Large-scale permeable pavement should be carefully planned to integrate landscaping in a manner that maximizes runoff treatment and minimizes risk of sediment, mulch, grass clippings, crushed leaves, nuts, and fruits inadvertently clogging the surface. Prior to construction, owners should commit to a vacuuming plan that includes vacuuming frequency and equipment needs. The vacuuming frequency typically depends on the time of year. In the spring, tree buds and seeds necessitate frequent vacuuming. In the fall, tree leaves and acorns necessitate frequent vacuuming. In the summer, vacuuming frequency depends on permeable pavement exposure to organic material from trees and nearby vegetated areas. Vacuum equipment and methods for sediment removal are provided in the section addressing operation and maintenance.

Major design elements

The following design elements apply to permeable pavement.

Minimum separation distance

Warning: It is REQUIRED that infiltration practices be designed with a minimum vertical distance of 3 feet between the bottom of the infiltration practice and the seasonally high water table or bedrock layer. See also Step 8 under the Design procedures section.

Local authorities may require greater separation depths.

It is HIGHLY RECOMMENDED that infiltration practices not be hydraulically connected to structure foundations or pavement, to avoid seepage and frost heave concerns, respectively. If groundwater contamination is a concern, it is RECOMMENDED that groundwater mapping be conducted to determine possible connections to adjacent groundwater wells.

Setback distances

Warning: The minimum setback distance from a stormwater infiltration system to a public water-supply well is 100 feet for wells classified as sensitive and 50 feet for all other public supply wells, as REQUIRED by the Minnesota Department of Health. See MDH isolation distances (pollutant or contaminant that may drain into the soil)
Caution: The minimum setbacks in the table below are HIGHLY RECOMMENDED for the design and location of infiltration practices. It will be necessary to consult local ordinances for further guidance on siting infiltration practices.

Required and recommended minimum vertical and horizontal separation distances. This represents the minimum distance from the infiltration practice to the structure of concern. If the structure is above-ground, the distance is measured from the edge of the BMP to the structure. If the structure is underground, the vertical separation distance represents the distance from the point of infiltration through the bottom of the system to the structure, while the horizontal separation (often called setback) distance is the shortest distance from the edge of the system to the structure.
Link to this table

Structure Distance (feet) Requirement or recommendation Note(s)
Vertical Saturated soil 3 Requirement1
Bedrock 3 Requirement1
Horizontal Public supply well 100 for sensitive wells; 50 for others3 Requirement
Building/structure/property line2 10 Recommended
Surface water none unless local requirements exist If nearby stream is impaired for chloride, see [2]
Septic system 35 Recommended
Contaminated soil/groundwater No specific distance. Infiltration must not mobilize contaminants.
Slope 200 Recommended from toe of slope >= 20%
Karst 1000 up-gradient 100 down-gradient Requirement1 active karst

1 Required under the Construction Stormwater General Permit
2 Minimum with slopes directed away from the building
3If treating an average of 10,000 gallons per day; otherwise separation distance is 300 feet


Karst: It is HIGHLY RECOMMENDED that infiltration practices not be used in active karst formations without adequate geotechnical testing.

Wellhead Protection Areas: It is HIGHLY RECOMMENDED to review the Minnesota Department of Health guidance on stormwater infiltration in Wellhead Protection Areas.

Pretreatment

Warning: It is REQUIRED that some form of pretreatment, such as a plunge pool, sump pit, filter strip, sedimentation basin, grass channel, or a combination of these practices be installed upstream of the infiltration practice.

It is HIGHLY RECOMMENDED that the following pretreatment sizing guidelines be followed:

  • Before entering an infiltration practice, stormwater should first enter a pretreatment practice sized to treat a minimum volume of 25 percent of the Vwq.
  • If the infiltration rate of the native soils exceeds 2 inches per hour a pretreatment practice capable of treating a minimum volume of 50 percent of the Vwq should be installed.
  • If the infiltration rate of the native soils exceeds 5 inches per hour a pretreatment practice capable of treating a minimum volume of 100 percent of the Vwq should be installed.

It is HIGHLY RECOMMENDED that pretreatment practices be designed such that exit velocities from the pretreatment systems are non-erosive (less than 3 feet per second) and flows are evenly distributed across the width of the practice (e.g., by using a level spreader).

Depth

The depth of an infiltration practice is a function of the maximum drawdown time and the design infiltration rate.

Warning: The REQUIRED drawdown time for infiltration practices is 48 hours or less, and so the depth of the practice should be determined accordingly.
Warning: Groundwater Protection: It is REQUIRED that runoff from potential stormwater hotspots (PSHs) not be infiltrated unless adequate pretreatment has been provided. Infiltration of runoff from confirmed hotspot areas, industrial areas with exposed significant materials, or vehicle fueling and maintenance areas is PROHIBITED.

Materials specifications

Permeable pavement material specifications vary according to the specific pavement product selected. The following table describes general material specifications for the components installed beneath the permeable pavement. Note that the size of stone materials used in the reservoir and filter layers differ depending whether the system is pervious concrete, porous asphalt or permeable interlocking concrete pavement.

Summary of specifications for materials under the pavement surface. For more information, see the footnote (1). Reference or links to any specific commercial product, process, or service by trade name, trademark, service mark, manufacturer, or otherwise does not constitute or imply endorsement, recommendation, or favoring by the Minnesota Pollution Control Agency.
Link to this table

Material
Specification
Notes
Bedding/choker layer
  • Pervious concrete: None
  • Porous asphalt: 1inch of AASHTO No. 57 stone
  • PICP: 2 inches of AASHTO No. 8 stone (MnDOT 3127FA-3)
Washed free of fines
Reservoir Layer
  • Pervious concrete: AASHTO No. 57 stone or per hydraulic design
  • Porous asphalt:AASHTO No. 2, 3, or 5 stone
  • PICP: 4 inches of AASHTO No. 57 base and AASHTO No.2, 3 or 4 stone subbase
Stone layer thickness based on the pavement structural and hydraulic requirements. Stonewashed and free of fines. Recommended minimum void ratio = 0.4.
Underdrain (optional) Use 4 to 6 inch diameter perforated PVC (AASHTO M-252) pipe or corrugated polyethylene pipe. Perforated pipe installed for the full length of the permeable pavement cell, and non-perforated pipe, as needed,connected to storm drainage system.
Filter Layer (optional) Sand filter layeris separated from base above and native soils with geotextile. Sand layer typically ASTM C33 gradation, 6 to 12 inches thick. The Filter Layer is REQUIRED if using the permeable pavement system to meet permit requirements. The sand layer may require a choker layer on surface to provide transition to base layerstone.
Geotextile(optional) Comply with AASHTO M-288 Standard Specification for Geotextile Specification for Highway Applications, drainage and separation applications, Class I or II. Porous asphalt industry recommends non-woven geotextile.
Impermeable Liner Use a minimum 30mil PVC liner covered by 12 ounce/square yard non-woven geotextile. EPDM and HDPE liner material is also acceptable.
Observation Well Use a perforated 4 to 6 inch vertical PVC pipe (AASHTO M-252) with a lockable cap, installedflush with the surface (or under pavers).

1for additional information on materials referenced in this table (e.g. stone dimensions), see the following links:

  • stone size [3]
  • definitions of aggregates [4]
  • information on geotextiles [5]
  • liners 1


A general comparison of different permeable pavements is provided in the following table. Designers should consult industry association and manufacturer’s technical specifications for specific criteria and guidance.

This table shows summarizes specifications for permeable pavement.
Link to this table.

Material
Specification
Notes
Permeable Pavers Surface open area: typically 5% to 15%; minimum thickness: 3 inches for vehicles; minimum compressive strength: 8,000 psi Concrete pavers conform to ASTM C936 and clay pavers C1272. Reservoir layer required to support the structural load.
Pervious Concrete
  • Void content: 15% to 35 %
  • Thickness: typically 5 to 8 inches
May not require a reservoir layer to support loads, but a layer is required for storage/infiltration. In no case should plain steel rebar or mesh be used in pervious concrete as this invites corrosion.
Porous Asphalt
  • Void content: 16% to 20 %
  • Thickness: minimum 2.5 inch surface
Reservoir layer contributes to structural load support.


Other design considerations

There are additional design considerations for permeable pavement, including use of permeable pavement in karst terrain and winter considerations.

Karst terrain

A detailed geotechnical investigation may be required for any kind of stormwater design in karst terrain. Permeable pavements, as with other infiltration practices, are not recommended at sites with known karst features as they can cause the formation of sinkholes and can provide a direct link for stormwater to access groundwater without providing any treatment.

Winter considerations

Plowed snow piles should be located in adjacent grassy areas so that sediments and pollutants in snowmelt are partially treated before they reach all permeable pavements. Sand is not recommended for winter traction over permeable pavements. If sand is applied, it must be removed with vacuum cleaning in the spring. Traction can be accomplished on PICP using jointing stone materials, some of which will find its way into the joints by springtime. A significant winter advantage of permeable pavements is that they require less deicing materials than their impervious counterparts. Use of deicing material on permeable pavement is therefore not recommended.

Signage

Permeable pavements can be used as opportunities for public education with signs explaining how they work. Infiltration demonstrations also help show how the pavements work. Signs provide a reminder to maintenance crews of their presence and list maintenance do’s and don’ts specific to the permeable pavement type.

Design checklists

Design checklists have not been developed for the Minnesota Stormwater Manual. Below are links to checklists developed by other organizations.


Related articles

Permeable pavement main page