m |
m |
||
(4 intermediate revisions by the same user not shown) | |||
Line 46: | Line 46: | ||
<td>secondary</td> | <td>secondary</td> | ||
<td></td> | <td></td> | ||
− | <td | + | <td>secondary</td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
Line 75: | Line 75: | ||
<td>secondary</td> | <td>secondary</td> | ||
</table> | </table> | ||
− | [[ | + | |
+ | <noinclude> | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Pollutant removal]] | ||
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Hydrology and geology]] | ||
+ | </noinclude> |
This table shows a list of BMPs and associated volume removal mechanisms. Primary (removal) means the BMP was designed for this specific mechanism. Secondary (removal) means the BMP provides some volume control for this mechanism even though the BMP was not designed for that purpose. An empty cell means the BMP provides limited or no removal for that mechanism.
Link to this table.
Volume control | Rate control | Velocity control | ETa | |
---|---|---|---|---|
Pollution prevention | ||||
Better Site Design/low impact development | primary | secondary | secondary | secondary |
Runoff volume minimization | primary | secondary | ||
Temporary construction sediment control | primary | secondary | ||
Bioretention | secondary | secondary | secondary | |
Filtration | secondary | secondary | ||
Infiltration | secondary | secondary | ||
Stormwater ponds | primary | primary | secondary | |
Stormwater wetlands | primary | primary | secondary |
This page was last edited on 7 August 2022, at 12:26.