m |
|||
Line 65: | Line 65: | ||
<FONT SIZE=5>YOU HAVE COMPLETED THE FLOW CHART<br> | <FONT SIZE=5>YOU HAVE COMPLETED THE FLOW CHART<br> | ||
+ | Do not scroll below this line<br> | ||
_____________________________________________________</font size> | _____________________________________________________</font size> | ||
Line 72: | Line 73: | ||
− | <font size=5>_________________________________________________________</font size> | + | <font size=5>Select the correct answer above. Do not scroll below this line<br> |
+ | _________________________________________________________</font size> | ||
===Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?=== | ===Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?=== | ||
Line 78: | Line 80: | ||
*[[Design sequence flow chart#|No]] | *[[Design sequence flow chart#|No]] | ||
− | <font size=5>_________________________________________________________</font size> | + | <font size=5>Select the correct answer above. Do not scroll below this line<br> |
+ | _________________________________________________________</font size> | ||
===Can a reasonable effort to acquire all of the ROW be accomplished?=== | ===Can a reasonable effort to acquire all of the ROW be accomplished?=== | ||
Line 84: | Line 87: | ||
*[[Design sequence flow chart#Is FTO Alternative Number 2 feasible?|No]] | *[[Design sequence flow chart#Is FTO Alternative Number 2 feasible?|No]] | ||
− | <font size=5>_________________________________________________________</font size> | + | <font size=5>Select the correct answer above. Do not scroll below this line<br> |
+ | _________________________________________________________</font size> | ||
===Is FTO Alternative Number 2 feasible?=== | ===Is FTO Alternative Number 2 feasible?=== | ||
Line 90: | Line 94: | ||
*[[Design sequence flow chart#Select FTO Alternative 3 (linear projects, zoning/land use requirements)|No]] | *[[Design sequence flow chart#Select FTO Alternative 3 (linear projects, zoning/land use requirements)|No]] | ||
− | <font size=5>_________________________________________________________</font size> | + | <font size=5>Select the correct answer above. Do not scroll below this line<br> |
+ | _________________________________________________________</font size> | ||
===Select FTO Alternative 2 (linear projects)=== | ===Select FTO Alternative 2 (linear projects)=== | ||
Line 99: | Line 104: | ||
YOU HAVE COMPLETED THE FLOW CHART<br> | YOU HAVE COMPLETED THE FLOW CHART<br> | ||
+ | Do not scroll below this line<br> | ||
_________________________________________________________</font size> | _________________________________________________________</font size> | ||
Line 108: | Line 114: | ||
YOU HAVE COMPLETED THE FLOW CHART<br> | YOU HAVE COMPLETED THE FLOW CHART<br> | ||
+ | Do not scroll below this line<br> | ||
_________________________________________________________</font size> | _________________________________________________________</font size> | ||
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
DO NOT SCROLL AROUND ON THIS PAGE.
READ THE ALERT BOX BELOW.
Prior to using the flow chart, gather the following preliminary information.
__________________________________________________
__________________________________________________
Select the correct answer above. Do not scroll below this line
_________________________________________________________
YOU HAVE COMPLETED THE FLOW CHART
Do not scroll below this line
_____________________________________________________
Select the correct answer above. Do not scroll below this line
_________________________________________________________
Select the correct answer above. Do not scroll below this line
_________________________________________________________
Select the correct answer above. Do not scroll below this line
_________________________________________________________
Select the correct answer above. Do not scroll below this line
_________________________________________________________
Link to FTO #2
YOU HAVE COMPLETED THE FLOW CHART
Do not scroll below this line
_________________________________________________________
Link to FTO#3
YOU HAVE COMPLETED THE FLOW CHART
Do not scroll below this line
_________________________________________________________
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END
Applicant attempts to comply with the following conditions:
Applicant attempts to comply with the following conditions:
Off-site mitigation (including banking or cash or treatment on another project, as determined by the local authority) equivalent to the volume reduction performance goal can be used in areas selected in the following order of preference: