m
Line 1: Line 1:
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
+
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site.
 +
 
 +
[[Prelimiary information for Design Sequence Flow Chart]]
 +
 
 +
[[Launch flow chart]]
 +
 
 +
<!--
 +
Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
  
 
<font size=7><span style="color:red">
 
<font size=7><span style="color:red">
Line 188: Line 195:
 
#Locations in the next adjacent DNR catchment area up-stream.
 
#Locations in the next adjacent DNR catchment area up-stream.
 
#Locations anywhere within the local authoritie's jurisdiction.
 
#Locations anywhere within the local authoritie's jurisdiction.
 +
-->

Revision as of 22:02, 26 November 2013

This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site.

Prelimiary information for Design Sequence Flow Chart

Launch flow chart