(Created page with "<center><font size=3></font size><br> Link to this table</center> <table class="sortable"><tr> <th>BMP group</th> <th>...")
 
m
Line 71: Line 71:
 
</tr>
 
</tr>
 
</table>
 
</table>
<font size=1><sup>a</sup><br>See section on [[Unified sizing criteria|unified sizing criteria]] for more information
+
<font size=1><sup>a</sup>See section on [[Unified sizing criteria|unified sizing criteria]] for more information<br>
<sup>b</sup><br>Can be incorporated into the structural control in certain situations
+
<sup>b</sup>Can be incorporated into the structural control in certain situations<br>
<sup>c</sup><br>May be provided by infiltration
+
<sup>c</sup>May be provided by infiltration<br>
<sup>d</sup><br>When impermeable liners are required or pool intercepts groundwater
+
<sup>d</sup>When impermeable liners are required or pool intercepts groundwater<br>
 
<sup>e</sup>Can be included as part of the treatment train</font size>
 
<sup>e</sup>Can be included as part of the treatment train</font size>

Revision as of 15:43, 4 January 2013


Link to this table
BMP group Rechargea Water qualitya Channel protectiona Peak dischargea Hot spot runoff
Bioretention Varies Yes Possibleb No Yes. Needs underdrain
Filtration - media No Yes No No Yes
Filtration - vegetative Variesc Yes Possibleb NoYes
Infiltration trench Yes Yes No No No
Infiltration basin Yes Yes Yes YesNo
Stormwater ponds Noc Yes Yes YesYes
Constructed wetlands Variesc Yes Yes YesYes. Needs pre-treatment
Supplemental BMPs Varies Nob Possible No Noe

aSee section on unified sizing criteria for more information
bCan be incorporated into the structural control in certain situations
cMay be provided by infiltration
dWhen impermeable liners are required or pool intercepts groundwater
eCan be included as part of the treatment train