m |
m |
||
Line 141: | Line 141: | ||
<noinclude> | <noinclude> | ||
− | [[ | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]] |
+ | [[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Operation and maintenance]] | ||
</noinclude> | </noinclude> |
Vegetative Filter System - Operation & Maintenance Checklist.
Link to this table
To access an Excel version of form (for field use), click here.
Project: | ||
Location: | ||
Site Status: | ||
Date: | ||
Time: | ||
Inspector: | ||
Maintenance Item | Satisfactory / Unsatisfactory | Comments |
---|---|---|
1. Debris Cleanout (Monthly) | ||
Contributing areas clean of litter and vegetative debris | ||
Inlet and outlets clear | ||
Filtration facility clean | ||
2. Check Dams or Energy Dissipators (Annual, After Major Storms) | ||
No evidence of flow going around structures | ||
No evidence of erosion at downstream toe | ||
3. Vegetation (Monthly) | ||
Mowing done per O&M plan | ||
Minimum mowing depth not exceeded | ||
Undesirable vegetation removed | ||
No evidence of erosion | ||
Fertilized per O&M plan | ||
4. Dewatering (Monthly)) | ||
Dewaters between storms within 48 hoursl | ||
5. Sediment Deposition (Annual) | ||
Clean of sediment | ||
Winter accumulation of sand removed each spring | ||
Contributing drainage area stabilized and free of erosion | ||
6. Outlet/Overflow Spillway (Annual) | ||
Good condition, no need for repairs | ||
No evidence of erosion | ||
No evidence of blockage | ||
Comments: | ||
Actions to be taken: |
This page was last edited on 4 August 2022, at 17:37.