Dfairbairn (talk | contribs) m (changed "restraints" to "constraints" for parallel language with linked questions) |
Dfairbairn (talk | contribs) m |
||
Line 9: | Line 9: | ||
*[[MIDS design sequence flow chart - Box 15|Is the site located in a DWSMA, wellhead protection area or within 200 feet of a drinking water well?]] Also see guidance on [http://stormwater.pca.state.mn.us/index.php?title=Stormwater_and_wellhead_protection&action=edit&redlink=1 wellhead protection]. | *[[MIDS design sequence flow chart - Box 15|Is the site located in a DWSMA, wellhead protection area or within 200 feet of a drinking water well?]] Also see guidance on [http://stormwater.pca.state.mn.us/index.php?title=Stormwater_and_wellhead_protection&action=edit&redlink=1 wellhead protection]. | ||
*[[MIDS design sequence flow chart - Box 17|Are there existing or proposed structures or infrastructure that constrain infiltration?]] | *[[MIDS design sequence flow chart - Box 17|Are there existing or proposed structures or infrastructure that constrain infiltration?]] | ||
− | *[[MIDS design sequence flow chart - Box 21|Is karst present | + | *[[MIDS design sequence flow chart - Box 21|Is karst present on the site?]] Also see [[Karst|guidance on sites with karst]]. |
*[[MIDS design sequence flow chart - Box 26|Is shallow groundwater or shallow bedrock present on site?]] Also see guidance for sites with [http://stormwater.pca.state.mn.us/index.php/Shallow_groundwater shallow groundwater] or [http://stormwater.pca.state.mn.us/index.php/Shallow_soils_and_shallow_depth_to_bedrock shallow bedrock]. | *[[MIDS design sequence flow chart - Box 26|Is shallow groundwater or shallow bedrock present on site?]] Also see guidance for sites with [http://stormwater.pca.state.mn.us/index.php/Shallow_groundwater shallow groundwater] or [http://stormwater.pca.state.mn.us/index.php/Shallow_soils_and_shallow_depth_to_bedrock shallow bedrock]. | ||
*[[MIDS design sequence flow chart - Box 33|Is there presence of contaminated soils and/or groundwater, or hotspot runoff?]] Also see guidance for sites with [http://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltrations_and_contaminated_soils_and_groundwater&action=edit&redlink=1 contaminated soils or groundwater] or [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots potential stormwater hotspots]. | *[[MIDS design sequence flow chart - Box 33|Is there presence of contaminated soils and/or groundwater, or hotspot runoff?]] Also see guidance for sites with [http://stormwater.pca.state.mn.us/index.php?title=Stormwater_infiltrations_and_contaminated_soils_and_groundwater&action=edit&redlink=1 contaminated soils or groundwater] or [http://stormwater.pca.state.mn.us/index.php/Potential_stormwater_hotspots potential stormwater hotspots]. |
This page provides information for determining the feasibility of infiltrating stormwater at a site.
The Minimal Impact Design Standards (MIDS) design sequence flowchart can be used to make decisions about the feasibility of infiltrating stormwater at a site. Although the flowchart focuses on MIDS performance goals, it can be adapted to help determine if infiltration restrictions exist at a site. Potential constraints to infiltration, with links to the MIDS flowchart and other guidance in this manual, are shown below.
In addition to the above questions, sizing and design information in this manual can be used to determine the amount of infiltration feasible at a site. See sizing information in the various design sections of this manual. The MIDS calculator may also be used to calculate infiltration volumes based on BMP sizing information.
Guidance for determining the feasibility of infiltrating stormwater has been developed for locations outside Minnesota. Examples can be found through a simple Google search on stormwater infiltration guidance.
Two examples that may be useful are indicated below.