Videos demonstrating use of the Minimal Impact Design Standards (MIDS) calculator are being developed. These videos will typically be short and focus on a specific aspect of the calculator. Videos tentatively planned include the following.

  1. Overview of the calculator
  2. Setting up your project site
  3. Basis for calculations and changing defaults
  4. Bioretention
  5. Infiltration basin/trench and underground infiltration
  6. Swale
  7. Tree trench
  8. Sand filter and iron enhanced sand filter
  9. Permeable pavement
  10. Green roof
  11. Wetlands and constructed ponds
  12. Harvest and use/re-use
  13. Disconnection BMP
  14. The Other BMP
  15. BMPs in series and routing BMPs
  16. Infiltration exercises
  17. Filtration exercises
  18. Multiple BMP exercises
  19. Interpreting results
  20. Using the calculator for large areas and lumping BMPs
  21. Available resources