m
m
Line 14: Line 14:
 
#Permeable pavement
 
#Permeable pavement
 
#Green roof
 
#Green roof
#Wetlands and constructed ponds
+
#Constructed ponds and constructed wetlands
 
#Harvest and use/re-use
 
#Harvest and use/re-use
 
#Disconnection BMP
 
#Disconnection BMP

Revision as of 18:57, 8 June 2017

image of Minimal Impact Design Standards logo

Videos demonstrating use of the Minimal Impact Design Standards (MIDS) calculator are being developed. These videos will typically be short and focus on a specific aspect of the calculator. Videos tentatively planned include the following.

  1. Overview of the calculator
  2. Setting up your project site
  3. Basis for calculations and changing defaults
  4. The Excel file behind the graphical user interface
  5. Bioretention
  6. Infiltration basin/trench and underground infiltration
  7. Swale
  8. Tree trench
  9. Sand filter and iron enhanced sand filter
  10. Permeable pavement
  11. Green roof
  12. Constructed ponds and constructed wetlands
  13. Harvest and use/re-use
  14. Disconnection BMP
  15. The Other BMP
  16. BMPs in series and routing BMPs
  17. Infiltration exercises
  18. Filtration exercises
  19. Multiple BMP exercises
  20. Interpreting results
  21. Using the calculator for large areas and lumping BMPs
  22. Available resources