(Created page with "File:Joint inspection.jpg| 500 px|thumbnail|right|alt=MS4 and MPCA staff conducting a joint construction site inspection|MS4 and MPCA staff conducting a joint construction s...") |
|||
Line 1: | Line 1: | ||
[[File:Joint inspection.jpg| 500 px|thumbnail|right|alt=MS4 and MPCA staff conducting a joint construction site inspection|MS4 and MPCA staff conducting a joint construction site inspection]] | [[File:Joint inspection.jpg| 500 px|thumbnail|right|alt=MS4 and MPCA staff conducting a joint construction site inspection|MS4 and MPCA staff conducting a joint construction site inspection]] | ||
− | + | ==Introduction== | |
+ | The MS4 Permit requires your regulatory mechanism to be as stringent as the MPCA’s Construction Stormwater Permit for erosion, sediment, and waste controls. In addition, the MS4 Permit requires your written procedure for conducting site inspections to include a checklist or other written means to document each site inspection ([https://stormwater.pca.state.mn.us/index.php?title=MS4_PART_III.STORMWATER_POLLUTION_PREVENTION_PROGRAM_(SWPPP) MS4 Permit Part III.D.4.d.(4) and Part III.D.4.f.(2)]). You must retain these documents for three years beyond the term of the MS4 Permit ([https://stormwater.pca.state.mn.us/index.php?title=MS4_PART_IV._ANNUAL_SWPPP_ASSESSMENT,_ANNUAL_REPORTING_AND_RECORD_KEEPING MS4 Permit Part IV.C.]). | ||
− | |||
− | + | ==Resources | |
− | + | *[[media:SiteInspectionChecklist.xlsx|Construction site inspection checklist]] - MPCA's construction site inspection checklist | |
− | + | *[[media:Construction Site Inspection Checklist - Red Wing.pdf|Construction site inspection checklist]] - City of Red Wing's construction site inspection checklist | |
+ | *[[media:Construction Site Inspection Checklist - Prior Lake.docx|Construction site inspection checklist]] - City of Prior Lake's construction site inspection checklist | ||
+ | *[[media:Environmental Good Housekeeping Reminder - Red Wing.pdf|Construction site good housekeeping reminder]] - City of Red Wing's tool to remind construction site owners/operators to maintain sites in compliance with their construction site stormwater runoff control regulatory mechanism | ||
+ | *[[media:Environmental Good Housekeeping THANK YOU - Red Wing.pdf|Construction site good housekeeping acknowledgement]] - City of Red Wing's tool to acknowledge and appreciate sites that are in compliance with their construction site stormwater runoff control regulatory mechanism |
The MS4 Permit requires your regulatory mechanism to be as stringent as the MPCA’s Construction Stormwater Permit for erosion, sediment, and waste controls. In addition, the MS4 Permit requires your written procedure for conducting site inspections to include a checklist or other written means to document each site inspection (MS4 Permit Part III.D.4.d.(4) and Part III.D.4.f.(2)). You must retain these documents for three years beyond the term of the MS4 Permit (MS4 Permit Part IV.C.).
==Resources