Line 34: Line 34:
 
***Minimum thickness shall be 60 mils.
 
***Minimum thickness shall be 60 mils.
 
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard].
 
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard].
***Install according to [https://www.yumpu.com/en/document/read/28366599/wisconsin-construction-specification-202-polyethylene- NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining (You can also access the specification here - [[File:WI Liner spec 202.pptx]]).
+
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining (You can also access the specification here - [[File:WI Liner spec 202.pptx]]).
 
**PVC (Polyvinyl chloride) - follow specifications in MPCA's [http://www.pca.state.mn.us/index.php/view-document.html?gid=16187 PVC liner guidance]. '''NOTE: 30 mil smooth polyvinyl chloride geomembrane is functionally equivalent to 60 mil textured high density polyethylene.'''
 
**PVC (Polyvinyl chloride) - follow specifications in MPCA's [http://www.pca.state.mn.us/index.php/view-document.html?gid=16187 PVC liner guidance]. '''NOTE: 30 mil smooth polyvinyl chloride geomembrane is functionally equivalent to 60 mil textured high density polyethylene.'''
 
**GCL (geosynthetic clay liner) liner criteria:
 
**GCL (geosynthetic clay liner) liner criteria:
 
***Design according to the criteria in [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf Table 4 of NRCS 313, Waste Storage Facility technical standard].
 
***Design according to the criteria in [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf Table 4 of NRCS 313, Waste Storage Facility technical standard].
*** Install according to [https://www.yumpu.com/en/document/read/51143672/203-geosynthetic-clay-liner NRCS Wisconsin Construction Specification 203], Geosynthetic Clay Liner. (You can also access the specification here - [[File:Clay liner spec.pptx]]
+
*** Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5426/000_WI_CS-203_Geosynthetic_Clay_Liner_OCT-2019 NRCS Wisconsin Construction Specification 203], Geosynthetic Clay Liner. (You can also access the specification here - [[File:Clay liner spec.pptx]]
 
**Clay liner criteria (essentially the same as the clay below landfills but not as thick):
 
**Clay liner criteria (essentially the same as the clay below landfills but not as thick):
 
***50 percent fines (200 sieve) or more
 
***50 percent fines (200 sieve) or more
Line 52: Line 52:
 
***Minimum thickness shall be 40 mils or greater
 
***Minimum thickness shall be 40 mils or greater
 
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard]
 
***Design according to the criteria in Table 3 of the [http://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_026465.pdf NRCS 313, Waste Storage Facility technical standard]
***Install according to [https://www.yumpu.com/en/document/read/28366599/wisconsin-construction-specification-202-polyethylene- NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining
+
***Install according to [https://efotg.sc.egov.usda.gov/api/CPSFile/5425/000_WI_CS-202_Polyethylene_Geomembrane_Lining_MAR-2019 NRCS Wisconsin Construction Specification 202], Polyethylene Geomembrane Lining
 
**Silt/Clay liner criteria:
 
**Silt/Clay liner criteria:
 
***50 percent fines (200 sieve), or 20 percent fines and a PI of 7
 
***50 percent fines (200 sieve), or 20 percent fines and a PI of 7
 
***An in-place hydraulic conductivity of 1 x 10<sup>-5</sup> centimeters per second or less
 
***An in-place hydraulic conductivity of 1 x 10<sup>-5</sup> centimeters per second or less
***Soil compaction and documentation as specified in [https://efotg.sc.egov.usda.gov/references/public/WI/204.pdf NRCS Wisconsin Construction Specification 204], Earthfill for Waste Storage Facilities
+
***Soil compaction and documentation as specified in [https://efotg.sc.egov.usda.gov/api/CPSFile/5454/000_WI_CS-204_-Earthfill_for_Waste_Storage_Facilities_SEP-2018 NRCS Wisconsin Construction Specification 204], Earthfill for Waste Storage Facilities
 
***Minimum thickness of two feet
 
***Minimum thickness of two feet
 
***Specify method for keeping the pool full or use of composite soils below liner
 
***Specify method for keeping the pool full or use of composite soils below liner

Revision as of 17:14, 8 June 2021

image
picture of a liner
Example of an impermeable liner for a stormwater best management practice. Source: Philadelphia Water (PWD) Stormwater Management Guidance Manual.

Liners are designed to limit infiltration of water from a stormwater Best Management Practice (BMP) into underlying and adjacent soil.

Conditions where liners are required

Under the Construction Stormwater General Permit:

  • The Permittee(s) must ensure filtration systems with less than three (3) feet of separation from seasonally saturated soils or from bedrock are constructed with an impermeable liner;
  • Permittees must design basins using an impermeable liner if located within active karst terrain.

The following sectors covered under an Industrial Stormwater Permit are required to have liners for ponds constructed after April 5, 2010.

Conditions where liners are recommended

Liners are recommended for the following conditions.

  • Circumstances where a permanent pool is needed but difficult to maintain due to site conditions. Examples include constructed wet detention ponds or constructed wetlands requiring a permanent pool and underlain by areas with Hydrologic Soil Group A soils, gravel, or fractured bedrock
  • Permeable pavement designs in compacted fill soils.
  • Areas where seepage from a BMP into the groundwater would otherwise occur but should be avoided due to risk of groundwater contamination. These include
    • Confirmed stormwater hotspots in areas where the potential for groundwater pollution is high. Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater. The potential for groundwater pollution can be determined using existing pollution sensitivity maps developed by the Minnesota Department of Natural Resources. Note these maps cover large geographic areas and should be used for initial screening at a site.
    • Areas where infiltrating water will mobilize contaminants in soil or groundwater
  • Locations where recommended horizontal or vertical separation distances cannot be achieved
  • Use impermeable liner as needed to separate tree BMPs from road, parking lot, sidewalk or adjacent walls or building foundation

Liner specifications

Specifications are provided for different levels of liners. Although specifications for clay liners are included with Levels 1 and 2, clay liners are generally not recommended. Links to information on design and installation is recommended. For additional information see additional information.

  • Level 1 liner - for sites with high potential for groundwater contamination
  • Level 2 liner - for sites with low groundwater pollution potential
  • Liners for facilities covered by an Industrial Stormwater Permit and where ponds are allowed with a constructed liner

Decision process for selecting liner level

The following table summarizes the process for selecting a liner.

Design process for selecting the appropriate liner level.
Link to this table

Condition Design level Note
Filtration practices with less than 3 feet of separation to seasonal saturated soil or bedrock 1 Required under the Construction Stormwater permit
BMP in confirmed potential stormwater hotspot with high or very high groundwater pollution potential or areas where infiltrating water will mobilize contaminants in soil or groundwater 1 Applies to all post-construction BMPs. See section on Potential stormwater hotspots for more information
Constructed ponds with less than 3 feet separation from seasonally high water table in a potential hotspot 1
Constructed wet ponds underlain by soils with an infiltration rate of 0.3 inches per hour or greater (HSG A or B soils) 1 To maintain a permanent pool
Karst terrain with high or very high groundwater pollution potential1 1 See section on karst for more information
Prevent groundwater intrusion into a BMP requiring aerobic conditions, such as iron-enhanced media 1
Maintain permanent pool in constructed ponds or constructed wetlands in areas underlain by geologic material that is fractured or has a high infiltration rate 2
Separation distance from a BMP cannot be achieved 2
Separate tree BMP from road, parking lot, sidewalk or adjacent walls or building foundation 2 To prevent tree root intrusion. See link

1 Groundwater pollution potential is determined based on hydrogeologic conditions, which are used to estimate the time of travel for water and conservative chemicals to pass through the soil and vadose zone and into groundwater.