==General stormwater management guidelines for sites with low infiltration capacity soils== | ==General stormwater management guidelines for sites with low infiltration capacity soils== | ||
*Local soil surveys should be used for preliminary determination of infiltration capacity of site soils; however, on-site soil testing is recommended to accurately characterize site soils if local surveys characterize site soils as either HSG C or D. | *Local soil surveys should be used for preliminary determination of infiltration capacity of site soils; however, on-site soil testing is recommended to accurately characterize site soils if local surveys characterize site soils as either HSG C or D. | ||
− | *Recharge criteria, if applicable, can still be met using infiltration practices or modified filter designs, such as the modified sand filter design or the bioretention system with infiltration gallery shown on the right. | + | *Recharge criteria, if applicable, can still be met using infiltration practices or modified filter designs, such as the modified sand filter design or the bioretention system with infiltration gallery shown on the right. As with any BMP, these must be appropriately designed. |
*Soil [[Turf|compost amendments]] may be required to increase pervious area storage and filtration rates for sites with HSG C and D soils that are expected to receive either rooftop or surface IC disconnection in accordance with certain [[Calculating stormwater volume and pollutant reductions and credits|stormwater credits]]. | *Soil [[Turf|compost amendments]] may be required to increase pervious area storage and filtration rates for sites with HSG C and D soils that are expected to receive either rooftop or surface IC disconnection in accordance with certain [[Calculating stormwater volume and pollutant reductions and credits|stormwater credits]]. | ||
*Where volume reduction is a primary objective for a site (e.g., potentially a receiving water-based goal due to channel erosion, nuisance flooding, or inadequate infrastructure capacity), emphasis should be placed on practices that promote runoff [[Stormwater re-use and rainwater harvesting|reuse]] and evapotranspiration such as cisterns, rain barrels, [[Green roofs|green roofs]], rain gardens, evaporative systems, and [[Bioretention|bioretention]]. | *Where volume reduction is a primary objective for a site (e.g., potentially a receiving water-based goal due to channel erosion, nuisance flooding, or inadequate infrastructure capacity), emphasis should be placed on practices that promote runoff [[Stormwater re-use and rainwater harvesting|reuse]] and evapotranspiration such as cisterns, rain barrels, [[Green roofs|green roofs]], rain gardens, evaporative systems, and [[Bioretention|bioretention]]. | ||
+ | |||
The following table provides an overview of low infiltration capacity soil related design considerations for several structural practice groups. | The following table provides an overview of low infiltration capacity soil related design considerations for several structural practice groups. | ||
Soils with low infiltration capacity (defined as soils with infiltration rates less than 0.2 inches per hour) are found throughout the state. Details of where to find soils that can and cannot be used for infiltration systems should begin with available county soil surveys, most of which are available digitally. However, these surveys are not accurate enough to determine site specific characteristics suitable for infiltration systems, so a detailed site analysis is recommended. Stormwater management limitations in areas with tight soils generally preclude large-scale infiltration and ground water recharge (infiltration that passes into the ground water system). These soils will typically be categorized under Hydrologic Soil Group (HSG) D. Tabled values of infiltration rates for these soils are conservative estimates of long-term, sustainable infiltration rates that have been documented in Minnesota. They are based on in-situ measurement within existing infiltration practices in Minnesota, rather than national numbers or rates based on laboratory columns.
Sites with poorly infiltrating soils (defined as soils with infiltration rates less than 0.2 inches per hour) limit the number of practices that can used for stormwater management on a site or specific area of a site. Certain watershed organizations in Minnesota do not allow the use (or strongly discourage the use) of infiltration practices where soil infiltration capacity is low. This does not mean, however, that these tight soils don’t have any infiltration and recharge capabilities. So it may be possible for sites to meet recharge objectives as long as appropriate design modifications have been incorporated.
The following table provides an overview of low infiltration capacity soil related design considerations for several structural practice groups.
This table shows structural BMP use in soil with low infiltration capacity
Link to this table
BMP | Low infiltration capacity soil considerations |
---|---|
Bioretention, dry swale, permeable pavement, tree trench/box | Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include an infiltration gallery below the underdrain, so long as it is appropriately sized. |
Media filter | Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized. |
Infiltration trench or basin |
|
Stormwater ponds | Acceptable practice with tight soils. Soils should help maintain permanent pool. |
Constructed wetlands |
|
Soil testing is recommended for all proposed stormwater facilities that plan to have a recharge or infiltration component to their design. Testing can be less rigorous than that for karst areas or sites with shallow bedrock and soils. The purpose of the testing is to identify and confirm the soil characteristics and determine their suitability, if any, for infiltration practices. The guidelines outlined below should not be interpreted as all-inclusive. The design of any subsurface investigation should reflect the size and complexity of the proposed project.
Borings should be located in order to provide representative area coverage of the of the proposed BMP facilities. The location of borings should be
The number of recommended borings are described below.
Borings should be extended to a minimum depth of 5 feet below the lowest proposed grade within the practice unless auger/backhoe refusal is encountered.
All material penetrated by the boring should be identified, as follows:
Soil permeabilities should be determined in the field using the following procedure (MDE, 2000), or an accepted alternative method.