m |
|||
Line 1: | Line 1: | ||
+ | {{alert|This page is under active construction. Edits should be complete by January 8, 2023. Until that time, do not reference this page for permit requirements or information.|alert-under-construction}} | ||
{{alert|The guidance on this page refers to the 2013 MS4 permit. The guidance will be updated in the coming months to reflect the 2020 MS4 permit|alert-warning}} | {{alert|The guidance on this page refers to the 2013 MS4 permit. The guidance will be updated in the coming months to reflect the 2020 MS4 permit|alert-warning}} | ||
MS4 (Municipal Separate Storm Sewer System) permittees who have a U.S.EPA-approved total maximum daily load wasteload allocation (WLA) that they are not meeting must annually report on progress made toward achieving those WLAs. This is achieved by submitting an annual report on a Minnesota Pollution Control Agency (MPCA) form approved by the MPCA Commissioner. This page provides links to guidance on completing that form, including links to resources and tools used to complete the form.
NOTE: Permit requirements differ for Phase 2 MS4s and the two Phase 1 cities (St. Paul and Minneapolis), so the page is divided into separate sections based on those differing requirements.