Line 4: | Line 4: | ||
===Conduct site review=== | ===Conduct site review=== | ||
− | *Aerial | + | *Aerial photos and topographic maps |
− | + | *County soil surveys and other soil information as available | |
− | *County | ||
*County Geologic Atlas | *County Geologic Atlas | ||
− | *Local | + | *Local groundwater levels |
− | *Soil | + | *DWSMA and Wellhead Protection maps |
− | *MPCA | + | *FEMA and local floodplain maps |
− | * | + | *Soil borings and site survey |
− | * | + | *MPCA listing of potentially contaminated sites |
+ | *Phase 1 and 2 Environmental Site Assessments | ||
+ | *TMDLs and local water quality standards | ||
+ | *Wetland delineations, MNRAM assessments, and wetland classifications | ||
+ | *Proposed conditions, conceptural/preliminary site design | ||
+ | *Local zoning and land use requirements/ordinances, including stormwater rate control requirements | ||
+ | *Communication with local landowners, LGU, or others knowledgeable about the site | ||
+ | *Site inspection | ||
+ | |||
+ | ===Define treatment goal=== | ||
+ | *New and redevelopment projects: Retain on site a volume of 1.1 inches from impervious surfaces | ||
+ | *Linear projects: Retain on site the larger of 1.1 inches from all new impervious surfaces or 0.55 inches from all new and fully reconstructed impervious surfaces | ||
+ | |||
+ | <font size=5>[[Design sequence flow chart|Begin Flow Chart]]</font size> | ||
− | |||
− | |||
− | + | [[Does the project creates one acre or more of new and/or fully reconstructed impervious surfaces? | |
− | * | + | *[[Design sequence flow chart#Goal does not apply|No]] |
− | * | + | *[[Design sequence flow chart#Linear project|Yes]] |
− | == | + | <!--===Goal does not apply===--> |
+ | The MIDS performance goal does not apply | ||
===DWSMA=== | ===DWSMA=== |
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
[[Does the project creates one acre or more of new and/or fully reconstructed impervious surfaces?
The MIDS performance goal does not apply
Is the site located in a DWSMA, wellhead protection area, or near a drinking well?
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END