− | *3 foot separation from the bottom of the bioretention system to seasonal high water table
| |
− | *Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
| |
− | *Drawdown time of 24 hours for trout streams
| |
− | *For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
| |
− | *Pretreatment
| |
− | #Recommend
| |
− | *5 acre or less for contributing area
| |
− | *Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
| |
− | *Field tested infiltration rates over table values
| |
− | #Information – provide links to the following
| |
− | *Guidance on determining infiltration rates
| |
− | *Information site constraints (shallow soil, karst, etc.)
| |
− | *Information on assessing BMPs
| |
− | *Information on design metrics (high flow bypass, ponding depths, drawn down)
| |
− | *Guidance on pretreatment
| |
− | *Information on soil mixes
| |
− | *Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
| |
− | *Construction specifications
| |
− | *Information on operation and maintenance
| |