m |
m |
||
Line 11: | Line 11: | ||
**Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin) | **Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin) | ||
**Field tested infiltration rates over table values | **Field tested infiltration rates over table values | ||
− | *Information – provide links to the following*Guidance on determining infiltration rates | + | *Information – provide links to the following |
− | **Information on [[ | + | **Guidance on determining infiltration rates |
− | Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) | + | **Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.) |
**Information on assessing BMPs | **Information on assessing BMPs | ||
− | **Information on design metrics (high flow bypass, ponding depths, drawn down) | + | **Information on [[Design criteria for bioretention|design]] metrics (high flow bypass, ponding depths, drawn down) |
**Guidance on pretreatment | **Guidance on pretreatment | ||
**Information on soil mixes | **Information on soil mixes | ||
**Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance | **Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance | ||
**Construction specifications | **Construction specifications | ||
− | **Information on operation and maintenance | + | **Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]]. |
Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs.