{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}}
 
{{alert|The following are requirements of the [http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/index.html Minnesota Construction Stormwater General Permit]|alert-danger}}
*Required
+
*3 foot separation from the bottom of the bioretention system to seasonal high water table
**3 foot separation from the bottom of the bioretention system to seasonal high water table
+
*Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
**Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
+
*Drawdown time of 24 hours for trout streams
**Drawdown time of 24 hours for trout streams
+
*For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
**For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
+
*Pretreatment
**Pretreatment
+
 
*Recommend
+
{{alert|The following are recommendations for inputs into the MIDS calculator|alert-warning}}
**5 acre or less for contributing area
+
*5 acre or less for contributing area
**Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
+
*Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
**Field tested infiltration rates over table values
+
*Field tested infiltration rates over table values
*Information – provide links to the following
+
 
**Guidance on determining infiltration rates
+
{{alert|The following information may be useful in determining inputs for the MIDS calculator|alert-info}}
**Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.)
+
*Guidance on determining infiltration rates
**Information on assessing BMPs
+
*Information on [[Stormwater infiltration and constraints on infiltration|site constraints]] (shallow soil, karst, etc.)
**Information on [[Design criteria for bioretention|design]] metrics (high flow bypass, ponding depths, drawn down)
+
*Information on assessing BMPs
**Guidance on pretreatment
+
*Information on [[Design criteria for bioretention|design]] metrics (high flow bypass, ponding depths, drawn down)
**Information on soil mixes
+
*Guidance on pretreatment
**Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
+
*Information on soil mixes
**Construction specifications
+
*Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
**Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]].
+
*Construction specifications
 +
*Information on [[Operation and maintenance of bioretention|operation and maintenance of bioretention BMPs]].

Revision as of 20:25, 16 May 2013

Below is a summary of requirements, recommendations and other information for using the Minimal Impacts Design Standards (MIDS) calculator for bioretention BMPs.

Warning: The following are requirements of the Minnesota Construction Stormwater General Permit
  • 3 foot separation from the bottom of the bioretention system to seasonal high water table
  • Use most restrictive infiltration rate within 3 feet of the bottom of the BMP
  • Drawdown time of 24 hours for trout streams
  • For measured infiltration rates, apply a safety factor of 2 (2.5 for permeable pavement)
  • Pretreatment
Caution: The following are recommendations for inputs into the MIDS calculator
  • 5 acre or less for contributing area
  • Maximum ponding depth of 18 inches, reduced to 6 inches if there is no site information (4 feet for infiltration basin)
  • Field tested infiltration rates over table values
Information: The following information may be useful in determining inputs for the MIDS calculator
  • Guidance on determining infiltration rates
  • Information on site constraints (shallow soil, karst, etc.)
  • Information on assessing BMPs
  • Information on design metrics (high flow bypass, ponding depths, drawn down)
  • Guidance on pretreatment
  • Information on soil mixes
  • Plant information, including species list that show water tolerance, potential effects of different species on infiltration rates, planting guidance
  • Construction specifications
  • Information on operation and maintenance of bioretention BMPs.