===Is the project linear?=== | ===Is the project linear?=== | ||
+ | *[[Design sequence flow chart#Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?|Yes]] | ||
*[[Design sequence flow chart#Are there zoning and land use requirements that make the Performance Goal not feasible?|No]] | *[[Design sequence flow chart#Are there zoning and land use requirements that make the Performance Goal not feasible?|No]] | ||
− | |||
− | _________________________________________________________ | + | |
+ | <font size=5>_________________________________________________________</font size> | ||
+ | |||
+ | ===Are there constraints due to lack of available ROW, off site drainage and/or rate control requirements?=== | ||
+ | *[[Design sequence flow chart#Can a reasonable effort to acquire all of the ROW be accomplished?|Yes]] | ||
+ | *[[Design sequence flow chart#|No]] | ||
+ | |||
+ | <font size=5>_________________________________________________________</font size> | ||
+ | |||
+ | ===Can a reasonable effort to acquire all of the ROW be accomplished?=== | ||
+ | *[[Design sequence flow chart#|Yes]] | ||
+ | *[[Design sequence flow chart#Is FTO Alternative Number 2 feasible?|No]] | ||
+ | |||
+ | <font size=5>_________________________________________________________</font size> | ||
+ | |||
+ | ===Is FTO Alternative Number 2 feasible?=== | ||
+ | [[Design sequence flow chart#Select FTO Alternative 2 (linear projects)|Yes]] | ||
+ | [[Design sequence flow chart#Select FTO Alternative 3 (linear projects, zoning/land use requirements|No]] | ||
+ | |||
+ | <font size=5>_________________________________________________________</font size> | ||
+ | |||
+ | ===Select FTO Alternative 2 (linear projects=== | ||
+ | {{alert|Select FTO Alternative 2. Provide documentation of off-site run-on to project area. Provide documentation of lach of ROW|alert-info}} | ||
+ | |||
+ | <font size=5>END<br> | ||
+ | _________________________________________________________</font size> | ||
+ | |||
+ | ===Select FTO Alternative 3 (linear projects, zoning/land use requirements)=== | ||
+ | {{alert|Provide soil survey, maps, regulations, and/or cost estimates documenting that meeting the original performance goal or FTO alternatives is not feasible in addition to other documentation as required by LGU|alert-info}} | ||
+ | |||
+ | <font size=5>END<br> | ||
+ | _________________________________________________________</font size> | ||
===Are there zoning and land use requirements that make the Performance Goal not feasible?=== | ===Are there zoning and land use requirements that make the Performance Goal not feasible?=== |
This is intended to take you through a design sequence that allows you to determine the appropriate performance goal at a site. Follow the questions below sequentially to arrive at a performance goal appropriate for your site.
Prior to using the flow chart, gather the following preliminary information.
END
_____________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
_________________________________________________________
END
_________________________________________________________
END
_________________________________________________________
Are there existing or proposed utilities, structures, or land use requirements (density, parking, setbacks, etc.) that make the Treatment Goal infeasible or cost prohibitive?
Is BMP relocation possible?
Are Flexible Treatment Option Alternatives number 1 or number 2 feasible?
Investigate Off-Site Considerations:
Provide site survey, maps, regulations, and/or cost estimates documenting infeasibility and cost-prohibitive nature of meeting the original Treatment Goal or FTO Alternatives
END